STATEN ISLAND
29 HALLISTER STREET
STATEN ISLAND · BIN 5177521
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureGeneral
Roof2p · 1 filing · 18 docs
Floor 21p · 1 filing · 18 docs
Floor 1
Cellar1p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE405/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor108/08/2026
Building Lifecycle
All (75)Filed (4)Permit Issued (1)Objection (40)Special Inspection (30)
09/02/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Resolved
08/07/2026
Permit issued — Construction Fence
S01377672-I1-FN
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Resolved
06/10/2026
Objection resolved — Addressed
05/01/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF NEW 10'-0" CURB CUT ALONG ERIE STREET. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01377676-I1
04/30/2026
Filed — Alteration
APPLICATION FILED FOR THE INSTALLATION OF 8'-0" HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01377672-I1
04/30/2026
Objection raised — Fire_Protection
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Fire_Protection
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Fire_Protection
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Inspections
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Fire_Protection
04/30/2026
Objection raised — Admin
04/30/2026
Objection raised — Scope
04/30/2026
Objection raised — Energy
04/30/2026
Objection raised — Structural
04/30/2026
Objection raised — Admin
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Zoning
04/30/2026
Objection raised — Fire_Protection
04/24/2026
Special inspection requirement — Maintenance information
04/24/2026
Special inspection requirement — Permanent certificate
04/23/2026
Objection raised — Scope
03/30/2026
Filed — New Building
APPLICATION IS FILED FOR THE CONSTRUCTON OF A 1-FAMILHY WITH ADU, 2-STORY DETACHED RESIDENCE ON (1) ZONING & TAX LOT. NEW CERTIFICATE OF OCCUPANCY TO BE ISSUED UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01377601-I1
03/30/2026
Filed — New Building
APPLICATION IS FILED FOR THE CONSTRUCTON OF A 1-FAMILHY WITH ADU, 2-STORY DETACHED RESIDENCE ON (1) ZONING & TAX LOT. NEW CERTIFICATE OF OCCUPANCY TO BE ISSUED UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01377601-S1
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/24/2026
Special inspection requirement — Wood – Prefabricated I-Joists
03/24/2026
Special inspection requirement — Mechanical Systems
03/24/2026
Special inspection requirement — Final
03/24/2026
Special inspection requirement — Footing and Foundation
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
03/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/24/2026
Special inspection requirement — Preliminary
03/24/2026
Special inspection requirement — Structural Wood Frame
03/24/2026
Special inspection requirement — Shutoff dampers
03/24/2026
Special inspection requirement — Ventilation and air distribution system
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedWALLACE AVENUE CONSTR LLC08/07/2026
1 project · most recent 03/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2026——Heating and Air Conditioning Systems
Heat / Cool
Rheem ×4
1 project · most recent 03/30/2026
Wood
FiledStatusContractorScope
03/30/2026——Wood
1 project · most recent 04/30/2026
Fence
FiledStatusContractorScope
04/30/2026Permit IssuedWALLACE AVENUE CONSTR LLCFence
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/24/2026Maintenance information—energy_progress
04/24/2026Permanent certificate—energy_progress
03/25/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026HVAC-R and service water heating equipment—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/24/2026Wood – Prefabricated I-Joists—special
03/24/2026Mechanical Systems—special
03/24/2026Final—progress
03/24/2026Footing and Foundation—progress
03/24/2026Energy Code Compliance Inspections—progress
03/24/2026Fire-Resistance Rated Construction—progress
03/24/2026Preliminary—progress
03/24/2026Structural Wood Frame—progress
03/24/2026Shutoff dampers—energy_progress
03/24/2026Ventilation and air distribution system—energy_progress
03/24/2026Air barrier — testing —energy_progress
03/24/2026Fenestration air leakage—energy_progress
03/24/2026Interior lighting power—energy_progress
03/24/2026Maintenance information—energy_progress
03/24/2026Metering—energy_progress
03/24/2026Permanent certificate—energy_progress
03/24/2026Air barrier - visual inspection—energy_progress
03/24/2026Insulation placement and R values—energy_progress
03/24/2026Fenestration and door U-factor and product ratings—energy_progress
03/24/2026Electric vehicle service equipment requirements—energy_progress
Latest 25 of 37.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026S01377601-S1Request digital key ↗
08/17/2026S01377601-I1Request digital key ↗
08/16/2026S01377672-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026S01377601-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026S01377601-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026S01377601-S1Open ↗
08/17/2026S01377601-I1Open ↗
08/16/2026S01377672-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026S01377601-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026S01377601-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026S01377601-I1Open ↗