← Back
STATEN ISLAND
98 CONTINENTAL PLACE
STATEN ISLAND · BIN 5177550
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 12 docs
Floor 1Under Construction4p · 1 filing · 12 docs
BasementUnder Construction4p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC108/06/2026
Building Lifecycle
All (28)Filed (1)Permit Issued (1)Special Inspection (26)
09/24/2026
Permit issued — General Construction
S01437041-I1-GC-CX
08/06/2026
Filed — New Building
CONSTRUCT TWO-FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS.
S01437041-I1
08/03/2026
Special inspection requirement — Metering
08/03/2026
Special inspection requirement — Interior lighting power
07/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/27/2026
Special inspection requirement — Subgrade Inspections
07/27/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/27/2026
Special inspection requirement — Final
07/27/2026
Special inspection requirement — Footing and Foundation
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
07/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/27/2026
Special inspection requirement — Structural Wood Frame
07/27/2026
Special inspection requirement — Fenestration areas
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/27/2026
Special inspection requirement — Air barrier — testing
07/27/2026
Special inspection requirement — Insulation placement and R values
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/27/2026
Special inspection requirement — Air barrier - visual inspection
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/27/2026
Special inspection requirement — Protection of exposed foundation insulation
07/27/2026
Special inspection requirement — Maintenance information
07/27/2026
Special inspection requirement — Permanent certificate
07/27/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
07/27/2026
Special inspection requirement — Fenestration air leakage
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMP REALTY HOLDING CORP09/24/2026
1 project · most recent 08/06/2026
Wood
FiledStatusContractorScope
08/06/2026Permit IssuedMP REALTY HOLDING CORPWood
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/03/2026Metering—energy_progress
08/03/2026Interior lighting power—energy_progress
07/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/27/2026Subgrade Inspections—special
07/27/2026Subsurface Investigations (Borings/Test Pits)—special
07/27/2026Final—progress
07/27/2026Footing and Foundation—progress
07/27/2026Energy Code Compliance Inspections—progress
07/27/2026Fire-Resistance Rated Construction—progress
07/27/2026Structural Wood Frame—progress
07/27/2026Fenestration areas—energy_progress
07/27/2026HVAC-R and service water heating equipment—energy_progress
07/27/2026Air barrier — testing —energy_progress
07/27/2026Insulation placement and R values—energy_progress
07/27/2026HVAC-R and service water heating system controls—energy_progress
07/27/2026Duct leakage testing, insulation and design—energy_progress
07/27/2026Air barrier - visual inspection—energy_progress
07/27/2026HVAC-R and service water piping design and insulation—energy_progress
07/27/2026Fenestration and door U-factor and product ratings—energy_progress
07/27/2026Protection of exposed foundation insulation—energy_progress
07/27/2026Maintenance information—energy_progress
07/27/2026Permanent certificate—energy_progress
07/27/2026Electric vehicle service equipment requirements—energy_progress
07/27/2026Concrete - Cast-In-Place—special
07/27/2026Fenestration air leakage—energy_progress
Latest 25 of 26.
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01437041-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026S01437041-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026S01437041-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026S01437041-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01437041-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026S01437041-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026S01437041-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026S01437041-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026S01437041-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026S01437041-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026S01437041-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026S01437041-I1Open ↗