← Back
STATEN ISLAND
75 BARD AVENUE
STATEN ISLAND · BIN 5177609
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GIUSEPPE BONOMO ARCHITECTURE106/23/2026
Building Lifecycle
All (26)Filed (1)Objection (4)Special Inspection (21)
08/10/2026
Special inspection requirement — Maintenance information
07/09/2026
Objection raised — Zoning
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Zoning
07/09/2026
Objection raised — Zoning
06/23/2026
Filed — New Building
APPLICATION FOR INSTALLATION OF TEMPORARY CONSTRUCTION FENCE
S01410153-I1
06/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/01/2026
Special inspection requirement — Subgrade Inspections
06/01/2026
Special inspection requirement — Structural Steel - Details
06/01/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
06/01/2026
Special inspection requirement — Structural Wood Frame
06/01/2026
Special inspection requirement — Final
06/01/2026
Special inspection requirement — Footing and Foundation
06/01/2026
Special inspection requirement — Insulation placement and R values
06/01/2026
Special inspection requirement — Air barrier — testing
06/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/01/2026
Special inspection requirement — Air barrier - visual inspection
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/01/2026
Special inspection requirement — Interior lighting power
06/01/2026
Special inspection requirement — Fenestration areas
06/01/2026
Special inspection requirement — Metering
06/01/2026
Special inspection requirement — Fenestration air leakage
06/01/2026
Special inspection requirement — Concrete - Cast-In-Place
06/01/2026
Special inspection requirement — Permanent certificate
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nothing on file for this building.
1 job · most recent 06/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NAHZ4; MXZ-3D24NLHZ 30,000 BTU · Heat Pump Outdoor ×4
Ventilation
Panasonic FV-14ES1 140 CFM · Erv ×2
1 job · most recent 06/23/2026
Steel Wood
FiledStatusContractorScope
06/23/2026——Steel, Wood
1 job · most recent 06/23/2026
Fence
FiledStatusContractorScope
06/23/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/10/2026Maintenance information—energy_progress
06/15/2026Fire-Resistance Rated Construction—progress
06/01/2026Subgrade Inspections—special
06/01/2026Structural Steel - Details—special
06/01/2026Subsurface Investigations (Borings/Test Pits)—special
06/01/2026Energy Code Compliance Inspections—progress
06/01/2026Structural Wood Frame—progress
06/01/2026Final—progress
06/01/2026Footing and Foundation—progress
06/01/2026Insulation placement and R values—energy_progress
06/01/2026Air barrier — testing —energy_progress
06/01/2026Electric vehicle service equipment requirements—energy_progress
06/01/2026Air barrier - visual inspection—energy_progress
06/01/2026Fenestration and door U-factor and product ratings—energy_progress
06/01/2026Interior lighting power—energy_progress
06/01/2026Fenestration areas—energy_progress
06/01/2026Metering—energy_progress
06/01/2026Fenestration air leakage—energy_progress
06/01/2026Concrete - Cast-In-Place—special
06/01/2026Permanent certificate—energy_progress
06/01/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S01410153-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026S01410153-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S01410153-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026S01410153-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01410153-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026S01410153-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026S01410153-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026S01410153-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026S01410153-I1Open ↗