← Back
STATEN ISLAND
42 MALONE AVENUE
STATEN ISLAND · BIN 5177632
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 1 filing · 11 docs
Floor 2
Floor 1Under Construction2p · 1 filing · 11 docs
BasementUnder Construction2p · 1 filing · 11 docs
1 job · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedRIDGE ELECTRIC CORP.General Wiring
1 job · most recent 06/02/2026
Wood
FiledStatusContractorScope
06/02/2026Permit IssuedMAXIMUM CONTRACTING INCWood
Building Lifecycle
All (26)Filed (1)Permit Issued (3)Objection (2)Special Inspection (20)
09/10/2026
Permit issued — Foundation
S01406100-I1-ST
09/10/2026
Permit issued — Structural
S01406100-I1-FO
09/10/2026
Permit issued — Foundation
S01406100-I1-GC
08/06/2026
Objection resolved — Resolved
06/27/2026
Objection raised — Scope
06/02/2026
Filed — New Building
Construct a 3-story, one-family detached residence with an accessory ADU,
S01406100-I1
05/21/2026
Special inspection requirement — Concrete - Cast-In-Place
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/21/2026
Special inspection requirement — Subgrade Inspections
05/21/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/21/2026
Special inspection requirement — Final
05/21/2026
Special inspection requirement — Footing and Foundation
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/21/2026
Special inspection requirement — Structural Wood Frame
05/21/2026
Special inspection requirement — Metering
05/21/2026
Special inspection requirement — Air barrier - visual inspection
05/21/2026
Special inspection requirement — Fenestration air leakage
05/21/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/21/2026
Special inspection requirement — Permanent certificate
05/21/2026
Special inspection requirement — Fenestration areas
05/21/2026
Special inspection requirement — Interior lighting power
05/21/2026
Special inspection requirement — Maintenance information
05/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/21/2026
Special inspection requirement — Insulation placement and R values
05/21/2026
Special inspection requirement — Air barrier — testing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM TRINITY HOLDINGS309/12/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.106/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor309/12/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedMAXIMUM CONTRACTING INC09/10/2026
DOB NOWStructuralPermit IssuedMAXIMUM CONTRACTING INC09/10/2026
DOB NOWFoundationPermit IssuedMAXIMUM CONTRACTING INC09/10/2026
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/21/2026Concrete - Cast-In-Place—special
05/21/2026Fire-Resistant Penetrations and Joints—special
05/21/2026Subgrade Inspections—special
05/21/2026Subsurface Investigations (Borings/Test Pits)—special
05/21/2026Final—progress
05/21/2026Footing and Foundation—progress
05/21/2026Energy Code Compliance Inspections—progress
05/21/2026Fire-Resistance Rated Construction—progress
05/21/2026Structural Wood Frame—progress
05/21/2026Metering—energy_progress
05/21/2026Air barrier - visual inspection—energy_progress
05/21/2026Fenestration air leakage—energy_progress
05/21/2026Electric vehicle service equipment requirements—energy_progress
05/21/2026Permanent certificate—energy_progress
05/21/2026Fenestration areas—energy_progress
05/21/2026Interior lighting power—energy_progress
05/21/2026Maintenance information—energy_progress
05/21/2026Fenestration and door U-factor and product ratings—energy_progress
05/21/2026Insulation placement and R values—energy_progress
05/21/2026Air barrier — testing —energy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S01406100-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S01406100-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S01406100-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026S01406100-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01406100-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026S01406100-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026S01406100-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/15/2026S01406100-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026S01406100-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026S01406100-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026S01406100-I1Open ↗