← Back
Building
2840 AMBOY ROAD
BIN 5800465
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Locations of Work
Mechanical
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Nothing on file for this building.
Building Lifecycle
All (24)Filed (3)Permit Issued (3)Signed Off (1)Violation (12)Inspection (1)Objection (2)Special Inspection (2)
07/27/2026
Signed off — Full Demolition
THIS PMM APPLICATION IS FOR THE MECHANICAL MEANS AND METHOD TO BE USED FOR THE DEMOLITION OF THE 2-STORY STRUCTURE, LOCATED AT 2840 AMBOY ROAD, STATEN ISLAND, NY, WHICH HAS BEEN FILED UNDER APPLICATION NUMBER: DOB NOW# S01359921-I1
S01359921-I1
06/16/2026
Permit issued — Full Demolition
S01359921-I1-FD
06/12/2026
Permit issued — Protection and Mechanical Methods
S01359921-S1-PMM
05/08/2026
Special inspection requirement — Demolition
Chris Sanders
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Chris Sanders
05/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2026
Objection resolved — Resolved
04/16/2026
Filed — Full Demolition
THIS PMM APPLICATION IS FOR THE MECHANICAL MEANS AND METHOD TO BE USED FOR THE DEMOLITION OF THE 2-STORY STRUCTURE, LOCATED AT 2840 AMBOY ROAD, STATEN ISLAND, NY, WHICH HAS BEEN FILED UNDER APPLICATION NUMBER: DOB NOW# S01359921-I1
S01359921-S1
04/09/2026
Permit issued — Construction Fence
S01359950-I1-FN
04/03/2026
Objection raised — Other
03/24/2026
Filed — Full Demolition
THIS PMM APPLICATION IS FOR THE MECHANICAL MEANS AND METHOD TO BE USED FOR THE DEMOLITION OF THE 2-STORY STRUCTURE, LOCATED AT 2840 AMBOY ROAD, STATEN ISLAND, NY, WHICH HAS BEEN FILED UNDER APPLICATION NUMBER: DOB NOW# S01359921-I1
S01359921-I1
03/12/2026
Filed — Alteration
S01359950-I1
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/06/2017
Violation issued (ECB, closed)
Elevators
12/22/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/26/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/25/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/21/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONSIGNOR FARRELL HIGH SCHOOL609/06/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTH BAY ENGINEERING PLLC304/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PERCIBALLI INDUSTRIES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERCIBALLI INDUSTRIES INC.General Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUTH BAY ENGINEERING PLL6682103/24/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offPERCIBALLI INDUSTRIES INC.06/16/2026
DOB NOWProtection and Mechanical MethodsSigned-offPERCIBALLI INDUSTRIES INC.06/12/2026
DOB NOWConstruction FencePermit IssuedPERCIBALLI INDUSTRIES INC.04/09/2026
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/08/2026DemolitionChris Sandersspecial
05/08/2026Structural Stability – Alterations of existing BuildingsChris Sandersspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026S01359950-I1Request digital key ↗
08/17/2026S01359921-I1Request digital key ↗
08/17/2026S01359921-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026S01359950-I1Open ↗
08/17/2026S01359921-I1Open ↗
08/17/2026S01359921-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/28/2026S01359921-I1Open ↗
09/28/2026S01359921-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/17/2026S01359921-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026S01359921-I1Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026S01359921-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/17/2026S01359921-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01359921-I1Open ↗
▸DOB NOWRodent Control1
08/17/2026S01359921-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/17/2026S01359921-S1Open ↗
08/13/2026S01359950-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/17/2026S01359921-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/17/2026S01359921-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/17/2026S01359921-I1Open ↗