| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B00784143 ↗ | 8686 BAY PARKWAY BROOKLYN | Alteration | Permit Issued | 06/13/2023 | 08/06/2024 | Design CONCEPT DESIGN GROUP | Direct replacement of existing RTU in same location |
| M00970647 ↗ | 303 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 12/18/2023 | 05/13/2024 | Design EJC ENGINEERING, PLLC Filer MARIN ARCHITECTS, P.C. | HEREWITH FILING FOR THE INSTALLATION OF NEW HVAC SYSTEM FOR PROPOSED ROOF SPACE. |
| Q00961413 ↗ | 40-36 82 STREET QUEENS | Alteration | Permit Issued | 11/16/2023 | 03/18/2024 | Design JKW ENGINEERING, P.C. Filer JKW ENGINEERING PC | Interior renovation of existing store to bakery. Install plumbing fixtures as shown on plan. No change in egress, occupancy or use is involv… |
| Q00994466 ↗ | 44-25 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 01/24/2024 | 03/18/2024 | Design JKW ENGINEERING, P.C. Filer JKW ENGINEERING PC | Interior renovation of existing restaurant to bakery. Remove and install plumbing fixtures as shown on plans. No change in egress, occupancy… |
| M00860898 ↗ | 303 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2023 | 09/19/2023 | Design EJC ENGINEERING, PLLC | HEREWITH FILING FOR THE INSTALLATION OF NEW HVAC SYSTEM FOR PROPOSED CELLAR AND 1ST FLOOR SPACE. |
| B00421698 ↗ | 115 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 11/02/2020 | 04/30/2021 | Design VASILIOS ARTEMIOU PE Owner AVERY HALL INVESTMENTS Filer JM ZONING, LLC. | FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH APARTMENT RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Name | Jobs together | Most recent |
|---|---|---|
| EJC ENGINEERING, PLLC | 2 | 12/18/2023 |
| JKW ENGINEERING, P.C. | 2 | 08/29/2024 |
| VASILIOS ARTEMIOU PE | 2 | 11/02/2020 |
| CONCEPT DESIGN GROUP | 1 | 06/13/2023 |
| STEEL CORE ENGINEERING PLLC | 1 | 08/12/2020 |
| SU ARCHITECT, P.C. | 1 | 05/14/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| ARCO PLBG AND HTG INC | 2 | 08/29/2024 |
| HTC CONSTRUCTION MANAGEME | 2 | 08/29/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| AVERY HALL INVESTMENTS | 1 | 11/02/2020 |
| HOULIHAN PARNES PROPERTIES | 1 | 06/24/2024 |
| MODERN BUSINESS ASSOCIATES INC | 1 | 08/29/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| JKW ENGINEERING PC | 2 | 08/29/2024 |
| MARIN ARCHITECTS, P.C. | 1 | 12/18/2023 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B00784143 ↗ | 8686 BAY PARKWAY BROOKLYN | Alteration | Permit Issued | 06/13/2023 | 08/06/2024 | Design CONCEPT DESIGN GROUP | Direct replacement of existing RTU in same location |
| M00970647 ↗ | 303 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 12/18/2023 | 05/13/2024 | Design EJC ENGINEERING, PLLC Filer MARIN ARCHITECTS, P.C. | HEREWITH FILING FOR THE INSTALLATION OF NEW HVAC SYSTEM FOR PROPOSED ROOF SPACE. |
| Q00961413 ↗ | 40-36 82 STREET QUEENS | Alteration | Permit Issued | 11/16/2023 | 03/18/2024 | Design JKW ENGINEERING, P.C. Filer JKW ENGINEERING PC | Interior renovation of existing store to bakery. Install plumbing fixtures as shown on plan. No change in egress, occupancy or use is involv… |
| Q00994466 ↗ | 44-25 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 01/24/2024 | 03/18/2024 | Design JKW ENGINEERING, P.C. Filer JKW ENGINEERING PC | Interior renovation of existing restaurant to bakery. Remove and install plumbing fixtures as shown on plans. No change in egress, occupancy… |
| M00860898 ↗ | 303 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2023 | 09/19/2023 | Design EJC ENGINEERING, PLLC | HEREWITH FILING FOR THE INSTALLATION OF NEW HVAC SYSTEM FOR PROPOSED CELLAR AND 1ST FLOOR SPACE. |
| B00421698 ↗ | 115 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 11/02/2020 | 04/30/2021 | Design VASILIOS ARTEMIOU PE Owner AVERY HALL INVESTMENTS Filer JM ZONING, LLC. | FILING HEREWITH MECHANICAL WORK IN CONJUNCTION WITH APARTMENT RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00486371 ↗ | 139 CENTRE STREET MANHATTAN | Alteration | Permit Issued | 03/17/2021 | 04/19/2021 | Design SU ARCHITECT, P.C. | TO PROPOSE NEW PARTITIONS FOR EXISTING OFFICE IN SUITE #812 ON 8TH FLOOR WITH GENERAL CONSTRUCTION WORK. TO INSTALLED NEW WATER HEAT PUMP AN… |
| B00407629 ↗ | 115 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 10/16/2020 | 03/05/2021 | Design VASILIOS ARTEMIOU PE | FILING HEREWITH FOR CHIMNEY FLUES FOR EXISTING GAS HOT WATER HEATERS AND EXISTING BOILERS AS PER PLANS. TO ADDRESS VIOLATION 34096547Y. ALL … |
| B00382809 ↗ | 398 MORGAN AVENUE BROOKLYN | Alteration | Signed-off | 08/12/2020 | 09/24/2020 | Design STEEL CORE ENGINEERING PLLC | APPLICATION FILED TO INSTALL TWO REFRIGERATION UNITS TO CONSIST OF TWO (2) EVAPORATOR AIR HANDLERS AND TWO (2) CONDENSERS. APPLICATION FILE… |
| 123442471BIS | 102 MULBERRY STREET MANHATTAN | — | ISSUED | 08/06/2018 | 08/06/2018 | — | MH |
| 123412146BIS | 70 BOWERY MANHATTAN | — | ISSUED | 04/06/2018 | 04/06/2018 | — | MH |
| 321558435BIS | 5815 8 AVENUE BROOKLYN | — | ISSUED | 02/09/2018 | 02/23/2018 | — | MH, OT |
| 123182901BIS | 145 CANAL STREET MANHATTAN | — | ISSUED | 12/05/2017 | 12/05/2017 | — | MH |
| 121856018BIS | 70 BOWERY MANHATTAN | — | ISSUED | 02/14/2014 | 09/11/2017 | — | MH, PL |
| 340176142BIS | 56 BAY 28 STREET BROOKLYN | — | ISSUED | 09/04/2014 | 10/21/2015 | — | OT, PL |
| 340131869BIS | 153 27 STREET BROOKLYN | — | ISSUED | 05/15/2014 | 10/31/2014 | — | MH, OT, PL |
| 420947195BIS | 31-02 47 AVENUE QUEENS | — | ISSUED | 02/13/2014 | 02/13/2014 | — | MH |
| 121835871BIS | 74 BOWERY MANHATTAN | — | ISSUED | 11/07/2013 | 11/07/2013 | — | MH |
| 320718586BIS | 491 FLUSHING AVENUE BROOKLYN | — | ISSUED | 04/01/2013 | 04/04/2013 | — | MH, PL |
| 320470110BIS | 17 SPENCER STREET BROOKLYN | — | ISSUED | 09/14/2012 | 09/14/2012 | — | MH |
| 320479326BIS | 8723 18 AVENUE BROOKLYN | — | ISSUED | 06/11/2012 | 06/28/2012 | — | OT, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 398 MORGAN AVENUE ↗ | 1 | 07/08/2026 |
| 44-25 KISSENA BOULEVARD ↗ | 1 | 07/08/2026 |
| 303 LEXINGTON AVENUE ↗ | 3 | 07/08/2026 |
| 115 WILLOUGHBY STREET ↗ | 4 | 03/21/2026 |
| 139 CENTRE STREET ↗ | 2 | 03/21/2026 |
| 40-36 82 STREET ↗ | 2 | 03/21/2026 |
| 8686 BAY PARKWAY ↗ | 2 | 03/21/2026 |