← Back
Contractor
AMPLEX CONTRACTING CORP
General Contractor
BRONX · 1BROOKLYN · 1
2 buildings
2
Total Filings
2
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Projects by first filing month2 projects all-time
0112Sep '24 · 1Mar '25 · 1Sep '24Oct '24Nov '24Dec '24Jan '25Feb '25Mar '25
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
1603 ROBERTSON PLACEBRONX · latest 03/20/2025
1 projects
798 EAST 21 STREETBROOKLYN · latest 09/29/2024
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
X01193815 ↗1603 ROBERTSON PLACE
BRONX
AlterationSigned-off03/14/202503/20/2025APPLICATION TO REPLACE SIDINGS ALL AROUND THE HOUSE, AND OTHER PERIODIC MAINTENANCE WORK AS PER FIELD CONDITION. NO CHANGE IN USE, EGRESS, O…
B01113506 ↗798 EAST 21 STREET
BROOKLYN
AlterationSigned-off09/19/202409/29/2024APPLICATION FOR PERIODIC MAINTENANCE WORK AND REPLACE EXISTING BAY WINDOW TO A FLAT WINDOW AT THE FRONT ON 1ST FLOOR LEVEL, ALSO REMOVE WIND…
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BANGASH ASSOCIATES INC.109/19/2024
MA ENGINEERING, P.C.103/14/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DOMINION EXPEDITING203/14/2025
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
X01193815 ↗1603 ROBERTSON PLACE
BRONX
AlterationSigned-off03/14/202503/20/2025APPLICATION TO REPLACE SIDINGS ALL AROUND THE HOUSE, AND OTHER PERIODIC MAINTENANCE WORK AS PER FIELD CONDITION. NO CHANGE IN USE, EGRESS, O…
B01113506 ↗798 EAST 21 STREET
BROOKLYN
AlterationSigned-off09/19/202409/29/2024APPLICATION FOR PERIODIC MAINTENANCE WORK AND REPLACE EXISTING BAY WINDOW TO A FLAT WINDOW AT THE FRONT ON 1ST FLOOR LEVEL, ALSO REMOVE WIND…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
798 EAST 21 STREET ↗107/08/2026
1603 ROBERTSON PLACE ↗107/08/2026
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01193815-I1 · 1603 ROBERTSON PLACEOpen ↗
08/13/2026B01113506-I1 · 798 EAST 21 STREETOpen ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B01113506-I1 · 798 EAST 21 STREETOpen ↗
08/24/2026X01193815-I1 · 1603 ROBERTSON PLACEOpen ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01113506-I1 · 798 EAST 21 STREETOpen ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01113506-I1 · 798 EAST 21 STREETOpen ↗
08/13/2026X01193815-I1 · 1603 ROBERTSON PLACEOpen ↗