| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01330802 ↗ | 30 WEST 61 STREET MANHATTAN | Alteration | Permit Issued | 04/02/2026 | 09/24/2026 | Proposed minor modifications to interior partitions to add a new shower to an existing bathroom. Plumbing work filed under subsequent applic… | |
| M01190895 ↗ | 381 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 03/07/2025 | 12/02/2025 | Design BATSKA ENGINEERING, LLC Owner XXII CAPITAL LLC Filer JM ZONING, LLC. | In conjunction with renovation of existing townhouse installing of HVAC Systems. mechanical work only. No change in use, egress or occupancy |
| M01012911 ↗ | 30 WEST 61 STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 10/15/2025 | MECHANICAL WORK FOR HVAC SYSTEM REPLACEMENT UPGRADE LOCATED IN 1ST FL MEZZANINE(OPEN HVAC AREA), CELLAR, 1ST FLOOR, & 5TH FLOOR AS PER PLANS… | |
| Q00788401 ↗ | 89-00 SUTPHIN BOULEVARD QUEENS | Alteration | Signed-off | 08/08/2022 | 04/21/2023 | Design TAN ENGINEERING PC Owner VANGUARD INVESTORS LTD Filer ART OF FORM,ARCHITECTS | add mechanical work to the north portion of the 3rd floor, all as shown on drawings herewith attached |
| X00819217 ↗ | 90 EAST 235 STREET BRONX | Alteration | Signed-off | 02/01/2023 | 04/21/2023 | Design ROBERT M. HANNA, P.E. | Replace existing CMU wall with reinforced concrete wall under the emergency direction of the NYCDOB Retaining Wall Unit. Wall is located alo… |
| M00503217 ↗ | 42 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 05/18/2021 | 07/15/2022 | Design MARIO MENDOZA BLANCO Filer PRAXIS WORK SHOP INC | Replacement in kind of existing air colled Chiller & its associated remote evaporator, including all mechanical work required at Roof. Exist… |
| Name | Projects together | Most recent |
|---|---|---|
| BATSKA ENGINEERING, LLC | 1 | 03/07/2025 |
| Jesefa Templo Architecture LLC | 1 | 04/02/2026 |
| LANDMARK FACILITIES GROUP, INC | 1 | 04/29/2024 |
| MARIO MENDOZA BLANCO | 1 | 05/18/2021 |
| ROBERT M. HANNA, P.E. | 1 | 03/31/2023 |
| TAN ENGINEERING PC | 1 | 08/08/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| PROTOCOL PLMBNG & HTG LLC | 1 | 04/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| VANGUARD INVESTORS LTD | 1 | 08/08/2022 |
| XXII CAPITAL LLC | 1 | 03/07/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ART OF FORM,ARCHITECTS | 1 | 08/08/2022 |
| EC BUILDING CONSULTANTS, INC. | 1 | 04/02/2026 |
| JM ZONING, LLC. | 1 | 03/07/2025 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 04/29/2024 |
| PRAXIS WORK SHOP INC | 1 | 05/18/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01330802 ↗ | 30 WEST 61 STREET MANHATTAN | Alteration | Permit Issued | 04/02/2026 | 09/24/2026 | Proposed minor modifications to interior partitions to add a new shower to an existing bathroom. Plumbing work filed under subsequent applic… | |
| M01190895 ↗ | 381 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 03/07/2025 | 12/02/2025 | Design BATSKA ENGINEERING, LLC Owner XXII CAPITAL LLC Filer JM ZONING, LLC. | In conjunction with renovation of existing townhouse installing of HVAC Systems. mechanical work only. No change in use, egress or occupancy |
| M01012911 ↗ | 30 WEST 61 STREET MANHATTAN | Alteration | Signed-off | 04/29/2024 | 10/15/2025 | MECHANICAL WORK FOR HVAC SYSTEM REPLACEMENT UPGRADE LOCATED IN 1ST FL MEZZANINE(OPEN HVAC AREA), CELLAR, 1ST FLOOR, & 5TH FLOOR AS PER PLANS… | |
| Q00788401 ↗ | 89-00 SUTPHIN BOULEVARD QUEENS | Alteration | Signed-off | 08/08/2022 | 04/21/2023 | Design TAN ENGINEERING PC Owner VANGUARD INVESTORS LTD Filer ART OF FORM,ARCHITECTS | add mechanical work to the north portion of the 3rd floor, all as shown on drawings herewith attached |
| X00819217 ↗ | 90 EAST 235 STREET BRONX | Alteration | Signed-off | 02/01/2023 | 04/21/2023 | Design ROBERT M. HANNA, P.E. | Replace existing CMU wall with reinforced concrete wall under the emergency direction of the NYCDOB Retaining Wall Unit. Wall is located alo… |
| M00503217 ↗ | 42 WEST 58 STREET MANHATTAN | Alteration | Signed-off | 05/18/2021 | 07/15/2022 | Design MARIO MENDOZA BLANCO Filer PRAXIS WORK SHOP INC | Replacement in kind of existing air colled Chiller & its associated remote evaporator, including all mechanical work required at Roof. Exist… |
| 220548833BIS | 221 EAST 201 STREET BRONX | — | ISSUED | 09/09/2016 | 10/05/2018 | — | MH, PL |
| 123042493BIS | 100 RIVERSIDE DRIVE MANHATTAN | — | ISSUED | 07/31/2017 | 02/06/2018 | — | MH, OT, PL |
| 122472074BIS | 17 BARROW STREET MANHATTAN | — | ISSUED | 04/08/2016 | 04/08/2016 | — | MH |
| 140467180BIS | 105 WEST 86 STREET MANHATTAN | — | ISSUED | 03/08/2016 | 03/08/2016 | — | MH |
| 220251625BIS | 1480 SHERIDAN EXPRESSWAY BRONX | — | ISSUED | 03/01/2013 | 04/04/2013 | — | MH, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 30 WEST 61 STREET ↗ | 5 | 09/18/2026 |
| 381 WEST END AVENUE ↗ | 3 | 07/08/2026 |
| 42 WEST 58 STREET ↗ | 3 | 03/21/2026 |
| 90 EAST 235 STREET ↗ | 3 | 03/21/2026 |
| 89-00 SUTPHIN BOULEVARD ↗ | 3 | 03/21/2026 |