| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01447469 | 115 BROADWAY MANHATTAN | — | Permit Issued | — | 09/29/2026 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01420865 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/27/2026 | 08/06/2026 | Design GOTHAM INSPECTIONS Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01427280 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/24/2026 | 08/06/2026 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01427285 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/27/2026 | 08/06/2026 | Design GOTHAM INSPECTIONS Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01415685 ↗ | 1372 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 06/24/2026 | Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FL & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01415690 ↗ | 1372 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/17/2026 | 06/23/2026 | Design GOTHAM INSPECTIONS Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 1ST FL & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| MONTROY DEMARCO ARCHITECTURE, LLP | 19 | 07/24/2026 |
| ST ENGINEERING SERVICES LLP | 10 | 02/25/2025 |
| GOTHAM INSPECTIONS | 6 | 07/27/2026 |
| HIGHLAND ASSOCIATES | 4 | 10/26/2022 |
| WB ENGINEERS & CONSULTANTS PLLC | 4 | 11/28/2023 |
| AKF ENGINEERS, LLP | 3 | 01/26/2021 |
| GINO O. LONGO, ARCHITECT | 2 | 03/27/2026 |
| GOLDMAN COPELAND ASSOCIATES | 2 | 03/10/2022 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 2 | 03/28/2022 |
| ASSOCIATED TECHNOLOGY INC. | 1 | 11/03/2021 |
| BCHEN ARCHITECT PLLC | 1 | 09/22/2023 |
| CASE ENGINEERING, INC. | 1 | 10/16/2025 |
| CHIA-LING YUAN | 1 | 12/16/2021 |
| GREGORY RALPH, ARCHITECT | 1 | 10/16/2025 |
| KAPUSCINSKI LUONGO ARCHITECTS | 1 | 11/01/2021 |
| PBA ENGINEERING, PC. | 1 | 11/05/2021 |
| RAAD | 1 | 11/06/2024 |
| RISE ARCHITECTURE | 1 | 03/27/2024 |
| SOUTH BAY ENGINEERING PLLC | 1 | 09/29/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| CATALANO PLBG & HTG INC | 2 | 10/16/2025 |
| NEW ERA MECHANICAL SER IN | 1 | 03/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CAPITAL PROPERTIES | 32 | 07/27/2026 |
| TRINITY CENTRE LLC | 2 | 11/05/2021 |
| EXACT CONTRACTING & CONSTRUCTION CO | 1 | 09/29/2022 |
| L&L HOLDING COMPANY LLC | 1 | 03/28/2022 |
| PREMIER INSULATION SERVICES | 1 | 09/22/2023 |
| ROSENBERG REALTY GROUP | 1 | 10/16/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 34 | 07/27/2026 |
| DESARNO ASSOCIATES, INC. | 1 | 10/16/2025 |
| EXPEDITE DEM INC | 1 | 09/29/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01447469 | 115 BROADWAY MANHATTAN | — | Permit Issued | — | 09/29/2026 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01420865 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/27/2026 | 08/06/2026 | Design GOTHAM INSPECTIONS Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01427280 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/24/2026 | 08/06/2026 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01427285 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/27/2026 | 08/06/2026 | Design GOTHAM INSPECTIONS Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01415685 ↗ | 1372 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 06/24/2026 | Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FL & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01415690 ↗ | 1372 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/17/2026 | 06/23/2026 | Design GOTHAM INSPECTIONS Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 1ST FL & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01126030 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 12/16/2025 | 12/19/2025 | GENERAL CONSTRUCTION TAKING PLACE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M01126033 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 12/17/2025 | 12/19/2025 | Design GOTHAM INSPECTIONS Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01312739 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/03/2025 | 12/04/2025 | Design GOTHAM INSPECTIONS | MECHANICAL MODIFICATIONS TAKING PLACE ON 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01208777 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/02/2025 | 12/03/2025 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01301181 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 11/25/2025 | 12/03/2025 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01301197 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 11/25/2025 | 12/03/2025 | — | MECHANICAL MODIFICATIONS TAKING PLACE ON 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X01206575 ↗ | 1928 WILLIAMSBRIDGE ROAD BRONX | Alteration | Signed-off | 04/29/2025 | 05/08/2025 | Design GREGORY RALPH, ARCHITECT Owner ROSENBERG REALTY GROUP Filer DESARNO ASSOCIATES, INC. | Plumbing Fixture changes as indicated on plans. |
| M01170205 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 04/21/2025 | 04/28/2025 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01200698 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 04/21/2025 | 04/28/2025 | Design GOTHAM INSPECTIONS Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X01071360 ↗ | 1302 LOHENGRIN PLACE BRONX | Alteration | Signed-off | 08/15/2024 | 01/03/2025 | Design GINO O. LONGO, ARCHITECT | Application herewith filed for minor interior renovation. No change in occupancy, use, egress or bulk. |
| M01096184 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 11/06/2024 | 12/12/2024 | Design RAAD | INSTALLATION OF MECHANICAL SYSTEMS |
| M01120899 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 10/24/2024 | 11/01/2024 | GENERAL CONSTRUCTION TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M01120906 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 10/24/2024 | 10/30/2024 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01114806 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 10/10/2024 | 10/11/2024 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01114822 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 10/10/2024 | 10/11/2024 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00921714 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 09/23/2024 | 09/25/2024 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00921726 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 09/23/2024 | 09/25/2024 | Design ST ENGINEERING SERVICES LLP | MECHANICAL MODIFICATIONS TAKING PLACE ON 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01037196 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/25/2024 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON BASEMENT AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01037132 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/24/2024 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X01024548 ↗ | 833 ELTON AVENUE BRONX | Alteration | Signed-off | 03/27/2024 | 05/14/2024 | Design RISE ARCHITECTURE | Interior renovation as shown on plans filed herewith. |
| M00921697 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 11/28/2023 | 12/01/2023 | GENERAL CONSTRUCTION TAKING PLACE ON 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M00921723 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 11/28/2023 | 12/01/2023 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X00827373 ↗ | 1747 SEMINOLE AVENUE BRONX | Alteration CO | Permit Issued | 04/24/2023 | 08/04/2023 | Design GINO O. LONGO, ARCHITECT | APPLICATION FILED FOR MINOR PLUMBING WORK AT BASEMENT LEVEL FOR NEW DWELLING UNIT. |
| M00848162 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 05/24/2023 | 05/30/2023 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00848166 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 05/19/2023 | 05/25/2023 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00858537 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 05/12/2023 | 05/18/2023 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00858564 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 05/18/2023 | 05/18/2023 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00783259 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 09/12/2022 | 12/08/2022 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00783798 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 09/13/2022 | 12/08/2022 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M08023137 ↗ | 315 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 10/26/2022 | 11/09/2022 | Design HIGHLAND ASSOCIATES | Mechanical modifications taking place on the 20th floor and ROF as per plans filed herewith. No change is use, egress or occupancy. |
| X00496293 ↗ | 2412 FULLER STREET BRONX | Alteration | Signed-off | 04/02/2021 | 10/14/2022 | Design BCHEN ARCHITECT PLLC | interior renovation of existing 2 family house including basement and attic. No change to use, egress or occupancy. |
| M07996785 ↗ | 315 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/06/2022 | 10/06/2022 | Design HIGHLAND ASSOCIATES | Construction modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy. |
| X08009571 ↗ | 3512 ROMBOUTS AVENUE BRONX | Alteration | Signed-off | 09/29/2022 | 09/30/2022 | Design SOUTH BAY ENGINEERING PLLC Filer EXPEDITE DEM INC | installation of construction fence to demolition all three structures under this lot, under DM application #s220746272/220746281/220746290. |
| M00780963 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 08/15/2022 | 08/22/2022 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00782148 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 08/15/2022 | 08/22/2022 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00768251 ↗ | 315 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/24/2022 | 07/26/2022 | Design HIGHLAND ASSOCIATES Filer RIZZO GROUP | General construction modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00768264 ↗ | 315 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/24/2022 | 07/26/2022 | Design HIGHLAND ASSOCIATES Filer RIZZO GROUP | Mechanical modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00325780 ↗ | 115 BROADWAY MANHATTAN | Alteration | Signed-off | 07/21/2020 | 06/14/2022 | Design AKF ENGINEERS, LLP | Mechanical modifications taking place at the 19th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M00657372 ↗ | 511 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 03/28/2022 | 04/07/2022 | Owner L&L HOLDING COMPANY LLC Filer RIZZO GROUP | General construction taking place on CEL as per plans filed herewith. No change in use, egress or occupancy. |
| M00589873 ↗ | 111 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/01/2021 | 03/18/2022 | Owner TRINITY CENTRE LLC Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00589875 ↗ | 111 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/03/2021 | 03/17/2022 | Design ASSOCIATED TECHNOLOGY INC. | MECHANICAL MODIFICATIONS TAKING PLACE ON BASEMENT & 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| M00589881 ↗ | 111 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/05/2021 | 03/17/2022 | Design PBA ENGINEERING, PC. Owner TRINITY CENTRE LLC Filer RIZZO GROUP | STRUCTURAL MODIFICATIONS TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00657397 ↗ | 511 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 03/10/2022 | 03/17/2022 | Design GOLDMAN COPELAND ASSOCIATES | Mechanical modifications taking place on CEL as per plans filed herewith. No change in use, egress or occupancy. |
| M00658426 ↗ | 521 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 02/22/2022 | 03/17/2022 | General construction taking place on the 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy. | |
| M00658439 ↗ | 521 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 02/22/2022 | 03/17/2022 | Design GOLDMAN COPELAND ASSOCIATES | Mechanical modifications taking place on the 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy. |
| M00644703 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 01/27/2022 | 01/31/2022 | GENERAL CONSTRUCTION TAKING PLACE ON 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M00644704 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 01/24/2022 | 01/31/2022 | Design ST ENGINEERING SERVICES LLP | MECHANICAL MODIFICATIONS TAKING PLACE ON 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00649412 ↗ | 111 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/16/2021 | 01/07/2022 | Design CHIA-LING YUAN Owner CAPITAL PROPERTIES | Interior Renovation to enlarge existing reception area and 2 private offices by 350sf. No change in USE, EGRESS OR OCCUPANCY |
| 240283509BIS | 1965 WILLIAMSBRIDGE ROAD BRONX | — | ISSUED | 02/04/2021 | 02/04/2021 | — | — |
| M00440389 ↗ | 111 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/26/2021 | 02/02/2021 | Design AKF ENGINEERS, LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | Mechanical modifications taking place on the 6th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M00453762 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 01/29/2021 | 02/02/2021 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | General Construction taking place on the 15th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M00456473 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 01/31/2021 | 02/02/2021 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | Mechanical modifications taking place on the 15th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M00448291 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 01/26/2021 | 01/29/2021 | Owner CAPITAL PROPERTIES Filer RIZZO GROUP | General Construction taking place on the 6th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M00419131 ↗ | 115 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/30/2020 | 01/21/2021 | Design AKF ENGINEERS, LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | Mechanical modifications taking place on the 15th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| 123343006BIS | 511 WEST 25 STREET MANHATTAN | — | ISSUED | 10/19/2018 | 12/08/2020 | — | PL |
| 140971839BIS | 115 BROADWAY MANHATTAN | — | ISSUED | 12/03/2020 | 12/03/2020 | — | OT |
| M00326165 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 04/17/2020 | 06/26/2020 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | Mechanical modifications taking place on the 16th Floor as per plans filed herewith. No change in Use, Egress, or Occupancy. |
| 140905778BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 06/25/2020 | 06/25/2020 | — | OT |
| 140910450BIS | 115 BROADWAY MANHATTAN | — | ISSUED | 06/25/2020 | 06/25/2020 | — | OT |
| M00221953 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 09/19/2019 | 06/05/2020 | Design ST ENGINEERING SERVICES LLP | Mechanical modifications taking place on the 11th Floor as per plans filed herewith. No change in Use, Egress or Occupancy. |
| M00260235 ↗ | 111 BROADWAY MANHATTAN | Alteration | Signed-off | 12/11/2019 | 01/09/2020 | Design ST ENGINEERING SERVICES LLP Owner CAPITAL PROPERTIES Filer RIZZO GROUP | Mechanical modifications taking place on the 5th Floor as per plans filed herewith. No change in Use, Egress or Occupancy |
| 123888695BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 11/26/2019 | 11/26/2019 | — | OT |
| 123400319BIS | 521 WEST 25 STREET MANHATTAN | — | ISSUED | 09/11/2019 | 09/11/2019 | — | MH |
| 123897756BIS | 115 BROADWAY MANHATTAN | — | ISSUED | 06/26/2019 | 09/06/2019 | — | MH, OT, PL |
| 123704777BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 04/02/2019 | 06/27/2019 | — | MH, OT, PL |
| 123805819BIS | 511 WEST 25 STREET MANHATTAN | — | ISSUED | 06/12/2019 | 06/12/2019 | — | OT |
| 220626945BIS | 1036 CLARENCE AVENUE BRONX | — | ISSUED | 02/08/2018 | 03/19/2019 | — | PL |
| 123156618BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 01/24/2019 | 03/05/2019 | — | MH, OT, PL |
| 123561378BIS | 115 BROADWAY MANHATTAN | — | ISSUED | 01/07/2019 | 02/05/2019 | — | MH, OT, PL |
| 123371430BIS | 550 7 AVENUE MANHATTAN | — | ISSUED | 12/12/2018 | 01/09/2019 | — | OT, PL, SP |
| 123507614BIS | 315 PARK AVENUE SOUTH MANHATTAN | — | ISSUED | 10/25/2018 | 11/07/2018 | — | MH, OT, PL |
| 123440320BIS | 249 WEST 17 STREET MANHATTAN | — | ISSUED | 10/16/2018 | 10/16/2018 | — | OT |
| 240232075BIS | 1723 ZEREGA AVE BRONX | — | ISSUED | 08/14/2018 | 09/05/2018 | — | MH, PL |
| 123548330BIS | 218 WEST 18 STREET MANHATTAN | — | ISSUED | 08/30/2018 | 08/30/2018 | — | OT |
| 123476149BIS | 315 PARK AVENUE SOUTH MANHATTAN | — | ISSUED | 08/16/2018 | 08/20/2018 | — | MH, OT, PL |
| 321178603BIS | 14 HAMPTON PLACE BROOKLYN | — | ISSUED | 03/14/2016 | 08/15/2018 | — | PL |
| 123238139BIS | 115 BROADWAY MANHATTAN | — | ISSUED | 08/09/2018 | 08/09/2018 | — | OT |
| 123582300BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 07/03/2018 | 08/01/2018 | — | MH, OT, PL |
| 123386497BIS | 511 WEST 25 STREET MANHATTAN | — | ISSUED | 04/02/2018 | 07/18/2018 | — | MH, OT, PL |
| 123149388BIS | 511 WEST 25 STREET MANHATTAN | — | ISSUED | 05/16/2018 | 07/13/2018 | — | OT |
| 123429628BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 04/25/2018 | 05/01/2018 | — | MH, OT, PL |
| 123153880BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 02/22/2018 | 03/20/2018 | — | MH, OT, PL |
| 123164654BIS | 112 WEST 34 STREET MANHATTAN | — | ISSUED | 01/24/2018 | 01/24/2018 | — | MH, OT |
| 123266544BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 12/15/2017 | 12/19/2017 | — | MH, OT, PL |
| 123173813BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 11/08/2017 | 11/08/2017 | — | MH, OT |
| 123295068BIS | 111 BROADWAY MANHATTAN | — | ISSUED | 07/10/2017 | 07/18/2017 | — | MH, OT, PL |
| 421482782BIS | 31-02 47 AVENUE QUEENS | — | ISSUED | 05/11/2017 | 05/11/2017 | — | MH, OT |
| 421472392BIS | 30-06 28 STREET QUEENS | — | ISSUED | 04/21/2017 | 04/21/2017 | — | OT |
| 140506655BIS | 245 EAST 39 STREET MANHATTAN | — | ISSUED | 06/16/2016 | 04/04/2017 | — | MH, OT, PL |
| 122962963BIS | 239 EAST 58 STREET MANHATTAN | — | ISSUED | 12/05/2016 | 01/19/2017 | — | MH, PL |
| 122894608BIS | 87 GREENWICH AVENUE MANHATTAN | — | ISSUED | 11/15/2016 | 12/12/2016 | — | OT, PL |
| 122917521BIS | 237 EAST 58 STREET MANHATTAN | — | ISSUED | 11/15/2016 | 12/09/2016 | — | OT, PL |
| 122888321BIS | 239 EAST 58 STREET MANHATTAN | — | ISSUED | 11/15/2016 | 12/07/2016 | — | OT, PL |
| 122915961BIS | 239 EAST 58 STREET MANHATTAN | — | ISSUED | 10/14/2016 | 12/07/2016 | — | OT, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 115 BROADWAY ↗ | 24 | 09/30/2026 |
| 111 BROADWAY ↗ | 42 | 07/08/2026 |
| 511 WEST 25 STREET ↗ | 2 | 07/08/2026 |
| 315 PARK AVENUE SOUTH ↗ | 7 | 07/08/2026 |
| 521 WEST 25 STREET ↗ | 3 | 07/08/2026 |
| 2412 FULLER STREET ↗ | 1 | 07/08/2026 |
| 833 ELTON AVENUE ↗ | 1 | 07/08/2026 |
| 1372 BROADWAY ↗ | 2 | 06/27/2026 |
| 1928 WILLIAMSBRIDGE ROAD ↗ | 2 | 04/09/2026 |
| 3512 ROMBOUTS AVENUE ↗ | 2 | 03/21/2026 |
| 1747 SEMINOLE AVENUE ↗ | 2 | 03/21/2026 |
| 1302 LOHENGRIN PLACE ↗ | 2 | 03/21/2026 |