| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00608460 ↗ | 212 LENOX ROAD BROOKLYN | Alteration | Permit Issued | 10/20/2021 | 11/05/2021 | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST AND 2ND FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. | |
| Q00476804 ↗ | 80-01 30 AVENUE QUEENS | Alteration | Signed-off | 06/24/2021 | 08/06/2021 | Filed to resolve violations by proposing to remove 2-story enlargement filed without the benefit of a permit, and to replace windows at fron… | |
| Q00476805 ↗ | 80-01 30 AVENUE QUEENS | Alteration | Signed-off | 07/29/2021 | 07/29/2021 | Filed to propose temporary plywood construction fence to be installed on public walkway within 3ft of property line. |
| Name | Projects together | Most recent |
|---|---|---|
| BARRY J. BANK, P.E., CONSULTING ENG | 2 | 07/29/2021 |
| DEVOTE ARCH & DESIGN STUDIO, PLLC | 1 | 10/20/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00608460 ↗ | 212 LENOX ROAD BROOKLYN | Alteration | Permit Issued | 10/20/2021 | 11/05/2021 | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST AND 2ND FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. | |
| Q00476804 ↗ | 80-01 30 AVENUE QUEENS | Alteration | Signed-off | 06/24/2021 | 08/06/2021 | Filed to resolve violations by proposing to remove 2-story enlargement filed without the benefit of a permit, and to replace windows at fron… | |
| Q00476805 ↗ | 80-01 30 AVENUE QUEENS | Alteration | Signed-off | 07/29/2021 | 07/29/2021 | Filed to propose temporary plywood construction fence to be installed on public walkway within 3ft of property line. |
| Building | Filings | Most Recent |
|---|---|---|
| 80-01 30 AVENUE ↗ | 4 | 07/08/2026 |
| 212 LENOX ROAD ↗ | 1 | 07/08/2026 |