| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01279019 ↗ | 850 3RD AVENUE BROOKLYN | Alteration | Signed-off | 10/06/2025 | 01/23/2026 | Design MG ENGINEERING D.P.C. Owner SALMAR PROPERTIES LLC Filer THE EXPEDITER GROUP | MODIFICATION TO EXISTING PLUMBING, SPRINKLER, AND STANDPIPE SYSTEMS ON PARTIAL 4TH FLOOR FOR TENANT BUILD-OUT. |
| B00909643 | 8101 RIDGE BOULEVARD BROOKLYN | Alteration | Permit Issued | 08/01/2023 | 02/07/2024 | Design GEI CONSULTANTS, INC. Filer JAM CONSULTANTS, INC. | REPAIR/REPLACEMENT OF DAMAGE CONCRETE FLOOR SLABS. REPAIR OF WIDE-FLANGE STEEL COLUMNS.3. REPLACEMENT OF ROUND LALLY COLUMNS. INSTALL NEW CO… |
| Name | Projects together | Most recent |
|---|---|---|
| Environetics Group Architects | 1 | 12/08/2025 |
| GEI Consultants | 1 | 03/06/2024 |
| MG Engineering | 1 | 12/08/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Ameriflo Plumbing and Heating | 1 | 12/08/2025 |
| Delta HVAC | 1 | 12/08/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Bay Ridge Preparatory School | 1 | 03/06/2024 |
| Salmar Properties | 1 | 12/08/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Jam Consultants | 1 | 03/06/2024 |
| The Expediter Group | 1 | 12/08/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01279019 ↗ | 850 3RD AVENUE BROOKLYN | Alteration | Signed-off | 10/06/2025 | 01/23/2026 | Design MG ENGINEERING D.P.C. Owner SALMAR PROPERTIES LLC Filer THE EXPEDITER GROUP | MODIFICATION TO EXISTING PLUMBING, SPRINKLER, AND STANDPIPE SYSTEMS ON PARTIAL 4TH FLOOR FOR TENANT BUILD-OUT. |
| B00909643 | 8101 RIDGE BOULEVARD BROOKLYN | Alteration | Permit Issued | 08/01/2023 | 02/07/2024 | Design GEI CONSULTANTS, INC. Filer JAM CONSULTANTS, INC. | REPAIR/REPLACEMENT OF DAMAGE CONCRETE FLOOR SLABS. REPAIR OF WIDE-FLANGE STEEL COLUMNS.3. REPLACEMENT OF ROUND LALLY COLUMNS. INSTALL NEW CO… |
| Building | Filings | Most Recent |
|---|---|---|
| 8101 RIDGE BOULEVARD ↗ | 1 | 07/08/2026 |
| 850 3RD AVENUE ↗ | 1 | 04/09/2026 |