| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00935051 ↗ | 2108 EAST 69 STREET BROOKLYN | Alteration | Signed-off | 10/08/2023 | 11/27/2023 | Filer THE GREEN STUDIO | Removal of the sink from the 1st floor garage and removal of the bathroom from the 1st floor boiler room area and cap the plumbing lines as … |
| Name | Projects together | Most recent |
|---|---|---|
| INFINITY DESIGN CONSULTANT INC | 1 | 10/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| KATAN P & H INC | 1 | 10/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| THE GREEN STUDIO | 1 | 10/08/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00935051 ↗ | 2108 EAST 69 STREET BROOKLYN | Alteration | Signed-off | 10/08/2023 | 11/27/2023 | Filer THE GREEN STUDIO | Removal of the sink from the 1st floor garage and removal of the bathroom from the 1st floor boiler room area and cap the plumbing lines as … |
| Building | Filings | Most Recent |
|---|---|---|
| 2108 EAST 69 STREET ↗ | 3 | 03/21/2026 |