| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368157 ↗ | 65 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 05/02/2026 | 07/09/2026 | Filer YOUBER DESIGN INC | REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (3 WC, 3 LAV, 1 TUB, 1 SHOWER, 1 SINK, 1 DW, 1 W/M) AT APT 11D ON THE 11TH FLOOR |
| Name | Projects together | Most recent |
|---|---|---|
| Sustainable Design Engineering | 1 | 05/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| DH Eagle Plumbing & Heating | 1 | 05/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Youber Design | 1 | 05/02/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368157 ↗ | 65 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 05/02/2026 | 07/09/2026 | Filer YOUBER DESIGN INC | REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (3 WC, 3 LAV, 1 TUB, 1 SHOWER, 1 SINK, 1 DW, 1 W/M) AT APT 11D ON THE 11TH FLOOR |
| Building | Filings | Most Recent |
|---|---|---|
| 65 CENTRAL PARK WEST ↗ | 1 | 07/01/2026 |