| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01359597 | 80-01 METROPOLITAN AVENUE QUEENS | Alteration | Permit Issued | 02/27/2026 | 06/15/2026 | Design CONLON ENGINEERING, LLC | New Steel platform in the depressed areaway for the air-cooled chiller at the Resurrection Mausoleum at St. John Cemetery. |
| Q01359595 | 80-01 METROPOLITAN AVENUE QUEENS | Alteration | Permit Issued | 02/24/2026 | 05/12/2026 | Design OLA CONSULTING ENGINEERS, PC | Replacing the AC system at Resurrection Mausoleum ,St. John Cemetery. Removal of the cooling tower, removal of (2) water cooled chillers and… |
| Q01223393 | 58-20 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 06/02/2025 | 04/15/2026 | Remove, re-route, and re-balance existing heating and ventilation ducts in the Girl's and Boy's locker room located in the basement. Providi… |
| Name | Projects together | Most recent |
|---|---|---|
| Conlon Engineering | 1 | 02/27/2026 |
| Eme Consulting Engineering Group | 1 | 03/13/2026 |
| Ola Consulting Engineers | 1 | 02/24/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Clean Tech Mechanical | 1 | 03/13/2026 |
| Pro Con Group | 1 | 03/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| New York City Public School | 1 | 03/13/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01359597 | 80-01 METROPOLITAN AVENUE QUEENS | Alteration | Permit Issued | 02/27/2026 | 06/15/2026 | Design CONLON ENGINEERING, LLC | New Steel platform in the depressed areaway for the air-cooled chiller at the Resurrection Mausoleum at St. John Cemetery. |
| Q01359595 | 80-01 METROPOLITAN AVENUE QUEENS | Alteration | Permit Issued | 02/24/2026 | 05/12/2026 | Design OLA CONSULTING ENGINEERS, PC | Replacing the AC system at Resurrection Mausoleum ,St. John Cemetery. Removal of the cooling tower, removal of (2) water cooled chillers and… |
| Q01223393 | 58-20 UTOPIA PARKWAY QUEENS | Alteration | Permit Issued | 06/02/2025 | 04/15/2026 | Remove, re-route, and re-balance existing heating and ventilation ducts in the Girl's and Boy's locker room located in the basement. Providi… |
| Building | Filings | Most Recent |
|---|---|---|
| 58-20 UTOPIA PARKWAY ↗ | 1 | 07/08/2026 |
| 80-01 METROPOLITAN AVENUE ↗ | 2 | 07/08/2026 |