← Back
Electrical Firm
ESSENTIAL ELECTRICAL
Electrician
6 projects with open permitsBRONX · 6QUEENS · 3STATEN ISLAND · 2
11 of 12 buildings mapped
14
Total Filings
12
Projects on File
12
Buildings Worked
6
Projects w/ Open Permits
Electrician
Primary Trade
Activity
Projects by first filing month12 projects all-time
0246Jul '25 · 1Sep '25 · 5Dec '25 · 2Feb '26 · 1Jun '26 · 1Jul '26 · 1Sep '26 · 1Jul '25Sep '25Nov '25Jan '26Mar '26May '26Jul '26Sep '26
bars = month · line = 3-mo average
Buildings by use
B Two Family
6 projects
A One Family
6 projects
Owners by type
Individual
12 projects
Union work
Union
0 projects
Non-union / unclassified
12 projects
Meters on filings
23
Master electricians
CAMRON REID · 013556
12 projects
Portfolio status
Browse projects →
Open permit650%
Signed off542%
Other status18%
By project type
New Job Filing12
Most active buildings
All buildings →
688 EAST 230 STREETBRONX · 1 open · latest 07/24/2026
1 projects
690 EAST 230TH STREETBRONX · 1 open · latest 06/26/2026
1 projects
820 PENFIELD STREETBRONX · 1 open · latest 09/28/2026
1 projects
4534 MURDOCK AVENUEBRONX · latest 07/28/2025
1 projects
4376 LOCUST POINT DRIVEBRONX · latest 09/20/2025
1 projects
3622 PRATT AVENUEBRONX · 1 open · latest 02/13/2026
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
X01461341820 PENFIELD STREET
BRONX
New Job FilingJob in process09/20/202609/28/2026—Upgrade electrical service meter socket from 2- gange to 3gange with disconnect
X01426339688 EAST 230 STREET
BRONX
New Job FilingJob in process07/10/202607/24/2026—Upgrade: Installed 3-gang meter socket ONLY. Installed breaker panel for basement ONLY.
X01419862690 EAST 230TH STREET
BRONX
New Job FilingJob in process06/19/202606/26/2026—Installed 3-gang meter socket, installed emergency disconnec, and installed breaker panel for basement ONLY.
X013577063622 PRATT AVENUE
BRONX
New Job FilingJob in process02/13/202602/13/2026—Upgrade 3 Electrical panel to 100Amps main for each apartment inside garage ONLY.Upgrade meter socket with main disconnect outside.
Q0131710567-44 199 STREET
QUEENS
New Job FilingJob in process12/04/202512/09/2025—Upgrade to a new electrical breaker panel with an 100Amp main ONLY.
Q013172222-99 BEACH 15 STREET
QUEENS
New Job FilingCancelled12/04/202512/08/2025—Installed one new 100Amp Breaker Panel
Counts cover all 12 projects (12 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
12 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 12Open permit 6Signed off 5Other status 1
12 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
X01461341820 PENFIELD STREET
BRONX
New Job FilingJob in process09/20/202609/28/2026—Upgrade electrical service meter socket from 2- gange to 3gange with disconnect
X01426339688 EAST 230 STREET
BRONX
New Job FilingJob in process07/10/202607/24/2026—Upgrade: Installed 3-gang meter socket ONLY. Installed breaker panel for basement ONLY.
X01419862690 EAST 230TH STREET
BRONX
New Job FilingJob in process06/19/202606/26/2026—Installed 3-gang meter socket, installed emergency disconnec, and installed breaker panel for basement ONLY.
X013577063622 PRATT AVENUE
BRONX
New Job FilingJob in process02/13/202602/13/2026—Upgrade 3 Electrical panel to 100Amps main for each apartment inside garage ONLY.Upgrade meter socket with main disconnect outside.
Q0131710567-44 199 STREET
QUEENS
New Job FilingJob in process12/04/202512/09/2025—Upgrade to a new electrical breaker panel with an 100Amp main ONLY.
Q013172222-99 BEACH 15 STREET
QUEENS
New Job FilingCancelled12/04/202512/08/2025—Installed one new 100Amp Breaker Panel
X012877694376 LOCUST POINT DRIVE
BRONX
New Job FilingComplete09/18/202509/20/2025—Upgrade and installed one 100 Amp main breaker panel ONLY.
Q01286997219-30 113 DRIVE
QUEENS
New Job FilingComplete09/15/202509/16/2025—Upgrade and installed one 100 Amp breaker panel ONLY.
B0128698925 BAY 46 STREET
BROOKLYN
New Job FilingJob in process09/15/202509/15/2025—Upgrade and installed new 100Amp breaker panel for first floor ONLY .
S0128697115 SWEETWATER AVENUE
STATEN ISLAND
New Job FilingComplete09/14/202509/15/2025—Installed new 100amp main service disconnect switch below meter socket outdoor ONLY.Upgrade and relocate main electrical panel in basement O…
S0128698650 LEGGETT PLACE
STATEN ISLAND
New Job FilingComplete09/14/202509/15/2025—Upgrade Electrical breaker panel to 100Amp main service disconnect switch
X012513794534 MURDOCK AVENUE
BRONX
New Job FilingComplete07/26/202507/28/2025—Updating exiting two gang meter socket to a three gang meter socket by slitting first floor load by adding PLP meter for basement ONLY.