| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01466113 | 1790 EAST 34 STREET BROOKLYN | New Job Filing | Job in process | 09/26/2026 | 09/28/2026 | — | Reinstating permit # B180367 100 amp service panel meter pan overhead piping and wiring bonding and grounding. |
| B01445172 | 1904 WEST 11 STREET BROOKLYN | New Job Filing | Job in process | 08/17/2026 | 08/12/2026 | — | General wiring for 5 AC condensers 4 in the front of the house 1 in the rear of the building also replacing two main service panels first fl… |
| S01442401 | 817 CASTLETON AVENUE STATEN ISLAND | New Job Filing | Job in process | 08/06/2026 | 08/05/2026 | — | General Wire for 2nd floor Front apartment lighting, receptacles, smoke detectors, panel and electric oven. |
| S01437173 | 817 CASTLETON AVENUE STATEN ISLAND | New Job Filing | Job in process | 07/27/2026 | 07/27/2026 | — | General Wire for ground floor store and second floor apartment lighting, receptacles, smoke detectors, and AC unit condenser. |
| B01435826 | 225 PARK PLACE BROOKLYN | New Job Filing | Complete | 07/23/2026 | 07/22/2026 | — | apartment 3C reinstating old permit application number B395080 to be closed out after inspection sub panel work in apt 2-receptacles replace… |
| B01430370 | 354 CUMBERLAND STREET BROOKLYN | New Job Filing | Job in process | 07/13/2026 | 07/13/2026 | — | General wiring unit 1, adding recessed lighting in bedroom kitchen, replacing receptacle and switch devices relocating receptacles in kitche… |
| Name | Projects together | Most recent |
|---|---|---|
| 6507 Cooper Realty Llc | 2 | — |
| Dbvllc | 1 | — |
| Mikecris Llc | 1 | — |
| 441 Bleecker Realty Llc | 1 | — |
| 3195 Zheng Inc | 1 | — |
| Thekitchenguy Llc | 1 | — |
| Uruci One Llc | 1 | — |
| Khp Acquisition Llc | 1 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01466113 | 1790 EAST 34 STREET BROOKLYN | New Job Filing | Job in process | 09/26/2026 | 09/28/2026 | — | Reinstating permit # B180367 100 amp service panel meter pan overhead piping and wiring bonding and grounding. |
| B01445172 | 1904 WEST 11 STREET BROOKLYN | New Job Filing | Job in process | 08/17/2026 | 08/12/2026 | — | General wiring for 5 AC condensers 4 in the front of the house 1 in the rear of the building also replacing two main service panels first fl… |
| S01442401 | 817 CASTLETON AVENUE STATEN ISLAND | New Job Filing | Job in process | 08/06/2026 | 08/05/2026 | — | General Wire for 2nd floor Front apartment lighting, receptacles, smoke detectors, panel and electric oven. |
| S01437173 | 817 CASTLETON AVENUE STATEN ISLAND | New Job Filing | Job in process | 07/27/2026 | 07/27/2026 | — | General Wire for ground floor store and second floor apartment lighting, receptacles, smoke detectors, and AC unit condenser. |
| B01435826 | 225 PARK PLACE BROOKLYN | New Job Filing | Complete | 07/23/2026 | 07/22/2026 | — | apartment 3C reinstating old permit application number B395080 to be closed out after inspection sub panel work in apt 2-receptacles replace… |
| B01430370 | 354 CUMBERLAND STREET BROOKLYN | New Job Filing | Job in process | 07/13/2026 | 07/13/2026 | — | General wiring unit 1, adding recessed lighting in bedroom kitchen, replacing receptacle and switch devices relocating receptacles in kitche… |
| Q01413968 | 20-02 43 STREET QUEENS | New Job Filing | Job in process | 06/08/2026 | 06/09/2026 | — | 1-Dedicated 240v 45 amp line for a/c condenser at rear right side of house form the main panel for Primary heating and cooling electrical in… |
| S01412623 | 109 SPRAGUE AVENUE STATEN ISLAND | New Job Filing | Complete | 06/04/2026 | 06/05/2026 | — | Installing new overhead 200 amp service, emergency main service switch ,200 amp meter pan and 200 amp breaker panel reconnecting all existin… |
| S01410433 | 144 GUYON AVENUE STATEN ISLAND | New Job Filing | Complete | 06/01/2026 | 06/02/2026 | — | Service work 200 amp meter pan 200 amp main breaker panel reconnecting all existing loads this Permits superseding old permit number R122421… |
| M01404872 | 315 EAST 80 STREET MANHATTAN | New Job Filing | Job in process | 05/19/2026 | 06/01/2026 | — | Combination of adjacent apartments 2A and 2B on the second floor General wiring installing new recessed lighting throughout apartments, usin… |
| B01408411 | 2072 STUART STREET BROOKLYN | New Job Filing | Job in process | 05/27/2026 | 05/28/2026 | — | Installed recessed, lighting throughout house replacing switches and receptacles throughout house installed new subpanel picking up existing… |
| B01408425 | 225 PARK PLACE BROOKLYN | New Job Filing | Complete | 05/27/2026 | 05/28/2026 | — | General wiring in apartment 3C permit superseding old permit application number B395080 to be closed out after inspection |
| Q01401346 | 69-29 OLCOTT STREET QUEENS | New Job Filing | Job in process | 05/12/2026 | 05/19/2026 | — | 1-Dedicated 240v 25 amp line for a/c condenser at left side of house form the main panel for Primary heating and cooling electrical installa… |
| M01402008 | 41 GRAND STREET MANHATTAN | New Job Filing | Job in process | 05/13/2026 | 05/14/2026 | — | 1-Dedicated 240v 50 amp line for a/c condenser on roof of building form the 2nd floor panel for Primary heating and cooling electrical insta… |
| S01402000 | 382 BEACH ROAD STATEN ISLAND | New Job Filing | Job in process | 05/13/2026 | 05/14/2026 | — | Installing new service 200 amp meter pan 200 amp emergency service switch and a 200 amp panel reconnecting all existing loads |
| B01401340 | 394 EAST 8 STREET BROOKLYN | New Job Filing | Job in process | 05/12/2026 | 05/13/2026 | — | 1-Dedicated 240v 50 amp line for a/c condenser at left side of house form the main panels in basement for Primary heating and cooling electr… |
| B01399232 | 2808 BRIGHAM STREET BROOKLYN | New Job Filing | Complete | 05/07/2026 | 05/08/2026 | — | Safety check to energize Con Ed meters new grounding and bonding system installed |
| S01381300 | 169 ARLINGTON AVENUE STATEN ISLAND | New Job Filing | Job in process | 03/31/2026 | 04/01/2026 | — | Service work installing new landlord meter pan and 100 amp main breaker Panel for common areas. Also installing new breaker panel in basemen… |
| S01367052 | 24 HEMLOCK LANE STATEN ISLAND | New Job Filing | Job in process | 03/03/2026 | 03/04/2026 | — | Installing new grounding and bonding system, water main ground and ground rod repairing in second floor rear bedroom, one light fixture and … |
| M01358894 | 330 WEST 72 STREET MANHATTAN | New Job Filing | Job in process | 02/11/2026 | 02/17/2026 | — | Work being performed in apt-7A general wiring installing 6 new receptacles wiring from existing branch circuit located in primary bedroom, … |
| M01348159 | 17 THOMPSON STREET MANHATTAN | New Job Filing | Job in process | 01/18/2026 | 01/18/2026 | — | Work performed for apartment-5 Install 240 V 50 amp disconnect switch on roof for AC condenser for Primary heating and cooling electrical in… |
| B01341856 | 259 EAST 23 STREET BROOKLYN | New Job Filing | Job in process | 01/02/2026 | 01/02/2026 | — | 1-dedicated 240 V 30 amp line for electric hot water heater for Primary hot water1-dedicated 240 V 50 amp line for 1st floor AC condenser at… |
| S01334518 | 25 HIGH ST STATEN ISLAND | New Job Filing | Job in process | 12/15/2025 | 12/15/2025 | — | 1-Dedicated 240v 40 amp line for a/c condenser at rear of house form the main panels for Primary heating and cooling electrical installation… |
| S01312421 | BIN 5119244 | New Job Filing | Job in process | 11/02/2025 | 11/03/2025 | — | Replacing only 1-100 amp single gang outdoor meter pan as per con Edison request due to loose jaw on the meter reconnecting all existing wir… |
| Q01264905 | 108-42 37 AVENUE QUEENS | New Job Filing | Job in process | 07/31/2025 | 08/01/2025 | — | 1-Dedicated 240v 40 amp line for a/c condenser at left side of house form the basement main panels for Primary heating and cooling electrica… |
| B01260814 | 155 MARTENSE STREET BROOKLYN | New Job Filing | Job in process | 07/23/2025 | 07/29/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser mounted on the roof of building form 1st floor main breaker panel in basement for Primary hea… |
| B01261407 | 362 16 STREET BROOKLYN | New Job Filing | Job in process | 07/24/2025 | 07/29/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser at the rear of house form the basement 1st floor main panel for Primary heating and cooling e… |
| B01261419 | 59 94 STREET BROOKLYN | New Job Filing | Job in process | 07/24/2025 | 07/29/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser mounted in the rear of house from main breaker panel in the basement for Primary heating and … |
| B01260799 | 2134 STRAUSS STREET BROOKLYN | New Job Filing | Job in process | 07/23/2025 | 07/25/2025 | — | 1-Dedicated 240v 40 amp line for a/c condenser mounted on the side of building form 2nd floor main breaker panel for Primary heating and coo… |
| B01261397 | 217 LEXINGTON AVENUE BROOKLYN | New Job Filing | Job in process | 07/24/2025 | 07/25/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser mounted at the rear of building form the 2nd floor main breaker in the basement panel for Pri… |
| B01261422 | 199 SULLIVAN PLACE BROOKLYN | New Job Filing | Job in process | 07/24/2025 | 07/25/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser mounted on the side of building from 1st floor main breaker panel in the basement for Primary… |
| M01261394 | 304 W 114 ST. MANHATTAN | New Job Filing | Job in process | 07/24/2025 | 07/25/2025 | — | Work in apt 5 1-Dedicated 240v 40 amp line for a/c condenser mounted on the rear balcony of the building form the sub panel in the apartmen… |
| Q01260803 | 69-52 228 STREET QUEENS | New Job Filing | Job in process | 07/23/2025 | 07/25/2025 | — | 1st floor 1-Dedicated 240v 50 amp line for a/c condenser at right side of house form the basement 1st floor main panel for Primary heating a… |
| Q01261415 | 34-33 84 STREET QUEENS | New Job Filing | Job in process | 07/24/2025 | 07/25/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser at rear of house form the basement main panel for Primary heating and cooling electrical inst… |
| B01260793 | 466 PROSPECT AVENUE BROOKLYN | New Job Filing | Job in process | 07/23/2025 | 07/23/2025 | — | work in apartment 3L 1-Dedicated 240v 40 amp line for a/c condenser mounted on roof of building form apt 3L sub-panel for Primary heating a… |
| B01257230 | 2215 CROPSEY AVENUE BROOKLYN | New Job Filing | Job in process | 07/16/2025 | 07/16/2025 | — | Temporary power ran 4- dedicated 20 amp 120v circuits for receptacles from building house panel in basement one on each floor first floor s… |
| B01255079 | 8905 RIDGE BOULEVARD BROOKLYN | New Job Filing | Job in process | 07/13/2025 | 07/14/2025 | — | General wiring throughout house, lighting, receptacles, kitchen, bathrooms, a/c units main service panel and sub panel. Converting old servi… |
| Q01237909 | 405 BEACH 122 STREET QUEENS | New Job Filing | Job in process | 06/07/2025 | 06/09/2025 | — | Replacing old service, installing new overhead stand-pipe and wiring installing 2 gang 100 amp meter pan, installing two 240 V single phase … |
| M01235840 | 141 AMSTERDAM AVENUE MANHATTAN | New Job Filing | Complete | 06/03/2025 | 06/04/2025 | — | General wiring in apartment 21G for 8-recessed lights,4-switches and changing out old sub panel in apartment with new panel reconnecting to … |
| S01235818 | 137 HEBERTON AVENUE STATEN ISLAND | New Job Filing | Complete | 06/03/2025 | 06/04/2025 | — | General wiring on second floor apartment 9B general wiring on third floor apartment 9C new risers ran from basement service to second floor … |
| B01217869 | 3017 BRIGHTON 7 STREET BROOKLYN | New Job Filing | Job in process | 04/29/2025 | 04/29/2025 | — | New grounding and bonding for main service meters and panels due to con ed entrance pipe failure due to erosion. |
| B01213102 | 142 EAST 32 STREET BROOKLYN | New Job Filing | Job in process | 04/19/2025 | 04/21/2025 | — | General wiring throughout basement, first floor second floor, lighting, receptacles, switches, electric baseboards heater, electric hot wate… |
| B01209900 | 3698 SHORE PARKWAY BROOKLYN | New Job Filing | Complete | 04/11/2025 | 04/11/2025 | — | 1-Dedicated 240v 30 amp line for a/c condenser at rear of house form the basement main panels from basement panel for Primary heating and co… |
| S01209903 | 278 DEWEY AVENUE STATEN ISLAND | New Job Filing | Job in process | 04/11/2025 | 04/11/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser at left side of house form the basement main panel for Primary heating and cooling electrical… |
| B01202978 | 8909 RIDGE BOULEVARD BROOKLYN | New Job Filing | Job in process | 03/30/2025 | 03/31/2025 | — | General wiring throughout house, lighting, receptacles, kitchen, bathrooms, a/c units main service panel and sub panel. |
| B01199522 | 1908 CONEY ISLAND AVENUE BROOKLYN | New Job Filing | Job in process | 03/23/2025 | 03/25/2025 | — | Dedicated 20 amp 120 V line from basement main panel to outside facade for GFCI receptacle |
| B01194354 | 230 STUYVESANT AVENUE BROOKLYN | New Job Filing | Job in process | 03/12/2025 | 03/13/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser at rear of house form the basement main panels for Primary heating and cooling electrical ins… |
| S01194357 | 238 EDGEGROVE AVENUE STATEN ISLAND | New Job Filing | Job in process | 03/12/2025 | 03/13/2025 | — | 1-Dedicated 240v 50 amp line for a/c condenser at left side of house form the basement main panels for Primary heating and cooling electrica… |
| B01185070 | 3195 FULTON STREET BROOKLYN | New Job Filing | Job in process | 02/21/2025 | 02/25/2025 | — | work being performed in apartments -1 hot water heater and a/c condenser, apt-2F hot water heater,2-a/c condenser, apt-2R hot water heater, … |
| B01185263 | 167 UTICA AVENUE BROOKLYN | New Job Filing | Job in process | 02/23/2025 | 02/25/2025 | — | 2nd floor apartment installing 240 V 40 amp line for electric stove and 240 V 30 amp line for electric water heater3rd floor apartment insta… |
| S01182478 | 104 BEMENT AVENUE STATEN ISLAND | New Job Filing | Job in process | 02/17/2025 | 02/19/2025 | — | 1-new dedicated 240V 40 amp lines for ac condenser Ground floor rear side 1-new dedicated 240V 50 amp for ac condenser for 1st floor rear ho… |
| B01182435 | 1350 EAST 86 STREET BROOKLYN | New Job Filing | Job in process | 02/17/2025 | 02/18/2025 | — | General wiring for switches receptacles, overhead light sub panels, smoke detectors, kitchen, and bathroom for ground floor and first floor |
| B01173938 | 43 LINDEN STREET BROOKLYN | New Job Filing | Job in process | 01/29/2025 | 01/30/2025 | — | 2-new dedicated 240V 40 amp & 50 amp lines for ac condensers at rear of the building for Primary heating and cooling electrical installation |
| Q01173934 | 34-15 84 STREET QUEENS | New Job Filing | Job in process | 01/29/2025 | 01/30/2025 | — | new dedicated 240V 40 amp lines for ac condenser in rear of the house for Primary heating and cooling electrical installation |
| M01165514 | 430 EAST 56 STREET MANHATTAN | New Job Filing | Job in process | 01/10/2025 | 01/10/2025 | — | Apartment 1G installing new subpanel in apartment running 240v 1ph 100 amp riser from building electrical room and adding new meter pan and … |
| B01159104 | 961 BUSHWICK AVENUE BROOKLYN | New Job Filing | Job in process | 12/20/2024 | 12/20/2024 | — | 2-Dedicated 240v 50 amp line for a/c condenser at rear of house form the basement main panels for Primary heating and cooling electrical ins… |
| B01154055 | 393 MACON STREET BROOKLYN | New Job Filing | Job in process | 12/10/2024 | 12/18/2024 | — | 3-new dedicated 2-240V 40 amp lines ran for ac condenser in rear of the house and 1-240v 50 amp ac condenser in rear of house for Primary he… |
| B01154051 | 167 UTICA AVENUE BROOKLYN | New Job Filing | Job in process | 12/10/2024 | 12/17/2024 | — | 2-new dedicated 240V 40 amp lines for A/C condenser mounted on left side of the building for Primary heating and cooling electrical installa… |
| B01154056 | 531A 6 AVENUE BROOKLYN | New Job Filing | Job in process | 12/10/2024 | 12/17/2024 | — | Dedicated 240v 50 amp line for a/c condenser at 1st fl rear of house form the basement main panel for Primary heating and cooling electrical… |
| B01151334 | 957 EAST 32 STREET BROOKLYN | New Job Filing | Job in process | 12/05/2024 | 12/05/2024 | — | 2-new dedicated 240V 40 amp and 50 amp lines for A/C condenser mounted on left side of the house for Primary heating and cooling electrical … |
| X01146457 | 743 HOLLYWOOD AVENUE BRONX | New Job Filing | Job in process | 11/22/2024 | 11/22/2024 | — | Clear violations from HDP in apartments atp-1,apt-2l,apt-2R work done by others three dedicated 240 V 40 amp lines from basement to each apa… |
| B01144948 | 604 E 5TH STREET BROOKLYN | New Job Filing | Job in process | 11/19/2024 | 11/20/2024 | — | 3-new dedicated 2-240V 50 amp lines ran for ac condenser in rear of the house and 1-240v 40 amp ac condenser in rear side of house for Prima… |
| B01141424 | 7032 RIDGE CREST TERRACE BROOKLYN | New Job Filing | Job in process | 11/12/2024 | 11/13/2024 | — | 2-new dedicated 1-240V 50 amp lines ran for ac condenser in rear of the house and 1-240v 30 amp ac condenser in rear of house for Primary he… |
| B01138732 | 1350 EAST 86 STREET BROOKLYN | New Job Filing | Job in process | 11/06/2024 | 11/07/2024 | — | Install overhead service for two family 1 ph 240v 100 amp 2-meters and 2-main breaker panels |
| Q01131145 | 48-11 39 STREET QUEENS | New Job Filing | Job in process | 10/22/2024 | 10/22/2024 | — | 3-new dedicated 240V 30 amp lines ran for ac condenser on side of the house and 2-ac condensers in rear of house for Primary heating and coo… |
| B01130427 | 24 EAST 4 STREET BROOKLYN | New Job Filing | Job in process | 10/21/2024 | 10/21/2024 | — | 2-new dedicated 240V 40 amp lines ran for ac condenser in front of the house and ac condenser in rear of house for Primary heating and cooli… |
| Q01107896 | 91-02 23 AVENUE QUEENS | New Job Filing | Job in process | 09/08/2024 | 09/10/2024 | — | Run 240 V 50 amp line to right side of house for AC condenser unit first floorRun 240 V 40 amp line to rear of the house for AC condenser un… |
| M01106445 | 78 CHARLES STREET MANHATTAN | New Job Filing | Job in process | 09/04/2024 | 09/05/2024 | — | Run 208v 40amp line form panel in atp. 5E to roof for ac condenser. |
| B01102038 | 441 BLEECKER STREET BROOKLYN | New Job Filing | Complete | 08/26/2024 | 08/28/2024 | — | Upgrade old service for entire building eight residential apartments, one house panel, 9 new service panels, and nine new meters panels |
| M01088339 | 313 EAST 10 STREET MANHATTAN | New Job Filing | Job in process | 07/30/2024 | 07/31/2024 | — | Con Edison utilities request new end line edison box old one was damaged. |
| B01069354 | 142 EAST 32 STREET BROOKLYN | New Job Filing | Job in process | 06/20/2024 | 06/25/2024 | — | Installing new main service over head wiring 2 gang meter pan 2-100 amp main service panel service work only |
| B01048550 | 97 OCEAN PARKWAY BROOKLYN | New Job Filing | Complete | 05/08/2024 | 05/08/2024 | — | General wiring on first floor and second floor, lighting, receptacles, smoke detectors, subpanel AC units |
| B01025479 | 75 OCEAN AVENUE BROOKLYN | New Job Filing | Complete | 03/25/2024 | 03/26/2024 | — | GENERAL WIRING RECEPACTLES, SWICTHES, LIGHTING AND SUB-PANEL IN APARTMENT 2-O |
| Q01024863 | 65-07 COOPER AVENUE QUEENS | New Job Filing | Job in process | 03/24/2024 | 03/25/2024 | — | Baseboard heaters,intstalled in second floor rear apartment (2R) and Front apartment (2F) and 4-baseboards heaters in ground floor commercia… |
| Q01024866 | 65-09 COOPER AVENUE QUEENS | New Job Filing | Job in process | 03/24/2024 | 03/25/2024 | — | Baseboard heaters,intstalled in second floor rear apartment (2R) and Front apartment (2F) 4-baseboards heaters in ground floor commercial sp… |
| Q01013930 | 91-02 23 AVENUE QUEENS | New Job Filing | Complete | 03/03/2024 | 03/05/2024 | — | general wiring in basement receptacles,lighting,kitchen and bathrom general wiring on 1st floor front room office only receptacles,lighting … |
| M00994223 | 401 EAST 89 STREET MANHATTAN | New Job Filing | Job in process | 01/22/2024 | 01/23/2024 | — | Replace old sub-panel in apartment 17A with new sub-panel replace old devices receptacles ,switches, throughout apartment and 3-vanity light… |
| B00992746 | 75 OCEAN AVENUE BROOKLYN | New Job Filing | Complete | 01/20/2024 | 01/20/2024 | — | GENERAL WIRING RECEPACTLES,SWICTHES,LIGHTING AND SUB-PANEL IN APARTMENT 1-O |
| B00978282 | 97 OCEAN PARKWAY BROOKLYN | New Job Filing | Complete | 12/16/2023 | 12/19/2023 | — | Clear violation in cellar remove wiring and devices from full height partitions 3-piece bathroom and kitchen restore to original premises |
| B00966506 | 97 OCEAN PARKWAY BROOKLYN | New Job Filing | Complete | 11/22/2023 | 11/24/2023 | — | UPGRADE EXISTING MAIN SERVICE PANEL AND METER PAN FROM 100 AMP 1PH TOO 200 AMP 1PH MAIN SERVICE PANEL |
| S00953645 | 635 CRAIG AVENUE STATEN ISLAND | New Job Filing | Complete | 10/25/2023 | 10/26/2023 | — | Wiring for basement bathroom 1-vanity light 1-exhaust fan 1-overhead light 3-light switches 1-GFI |
| S00926093 | 235 BRIGHTON STREET STATEN ISLAND | New Job Filing | Complete | 08/28/2023 | 08/28/2023 | — | REPLACING DAMAGED METER PAN |
| M00920723 | 61 WEST 68 STREET MANHATTAN | New Job Filing | Complete | 08/16/2023 | 08/17/2023 | — | REPLACING OLD SUB PANEL IN APARTMENT 5/7 |
| B00915763 | 76 NEVINS STREET BROOKLYN | New Job Filing | Job in process | 08/08/2023 | 08/08/2023 | — | DEDICATED 220V 40 AMP LINE FROM PANEL TO A/C CONDENSER IN REAR OF BUILDING. |
| B00901481 | 1 HANSON PLACE BROOKLYN | New Job Filing | Complete | 07/09/2023 | 07/11/2023 | — | apt. 14G--10-wall sconces light fixtures 1-dedicated line 120v 20amp |
| M00901541 | 1202 2 AVENUE MANHATTAN | New Job Filing | Complete | 07/09/2023 | 07/11/2023 | — | APT. 10J ADDED 2-RECPTACLE ROMOVE 3 OLD FIXTURES AND REPLACE WITH 3 NEW LIGHT FIXTURES |
| M00885547 | 45 WEST 67 STREET MANHATTAN | New Job Filing | Complete | 06/05/2023 | 06/06/2023 | — | apartment-22F110 V 20 amp line for towel, warmer in bathroom30 amp line for oven 40amp line for range 2-small appliance branch circuits for … |
| B00836605 | 235 94 STREET BROOKLYN | New Job Filing | Job in process | 02/28/2023 | 02/28/2023 | — | 7-Air conditioner condenser. |
| B00828246 | 1300 EAST 49 STREET BROOKLYN | New Job Filing | Complete | 02/13/2023 | 02/13/2023 | — | Upgraded main service panel on ground floor |
| M00806880 | 61 WEST 88 STREET MANHATTAN | New Job Filing | Complete | 01/03/2023 | 01/03/2023 | — | Replacing a Panel. Not Same Location, Facing New Direction. Apartment 4R |
| B00749241 | 2172 BATH AVENUE BROOKLYN | New Job Filing | Complete | 06/01/2022 | 06/01/2022 | — | Superseding Electrical Application (B00062593-11 -EL) Installing 16 - 120volt receptacles and 4 branch circuits. |
| B00665891 | 143 EAST 32ND STREET BROOKLYN | New Job Filing | Job in process | 01/20/2022 | 01/20/2022 | — | Over head service , Meter enclosure and service conductors from meter to Panelboard Main Breaker. Panel is Existing. Upgrading from 110 Vo… |
| B00665946 | 284 10 STREET BROOKLYN | New Job Filing | Job in process | 01/20/2022 | 01/20/2022 | — | Disconnect for Mini Split Ductless Unit. From Panel to Equipment in Backyard. For 3rd floor unit. No other Work performed. |
| B00575294 | 179 SEELEY STREET BROOKLYN | New Job Filing | Job in process | 08/11/2021 | 08/12/2021 | — | Two dedicated lines for HVAC units |
| B00504157 | 2613 VOORHIES AVENUE BROOKLYN | New Job Filing | Job in process | 04/15/2021 | 04/15/2021 | — | Installation of power for 2- a/c units |
| Q00339789 | 10-70 JACKSON AVENUE QUEENS | New Job Filing | Job in process | 04/04/2020 | 04/06/2020 | — | Three new lines for air conditioner condenser units. |
| B00333871 | 41 72 STREET BROOKLYN | New Job Filing | Job in process | 03/17/2020 | 03/17/2020 | — | Installation of PLP meter and Panel |
| B00318508 | 16 BAY 23 STREET BROOKLYN | New Job Filing | Job in process | 02/19/2020 | 02/19/2020 | — | To remove ECB Violation #39012041H |
| S00317524 | 333 VAN DUZER STREET STATEN ISLAND | New Job Filing | Complete | 02/18/2020 | 02/18/2020 | — | 3 Dedicated Circuits |
| Q00291577 | 558 BEACH 67 STREET QUEENS | New Job Filing | Complete | 01/06/2020 | 01/06/2020 | — | Safety Inspection to re-energize existing meter, meter has been off more than 6 months. 2ND FLOOR. |