← Back
Design Firm
AUGUST LIAU
Design
3 projects with open permitsMANHATTAN · 8BROOKLYN · 1QUEENS · 1
9 buildings
18
Total Filings
10
Projects on File
9
Buildings Worked
3
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month10 projects all-time
0123Jan '22 · 1Jun '22 · 1Dec '22 · 1Mar '24 · 1Aug '24 · 1Oct '24 · 1Apr '26 · 1Jun '26 · 2Aug '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit330%
Signed off550%
Filed only220%
By project type
Alteration10
Most active buildings
All buildings →
1084 2 AVENUEMANHATTAN · latest 04/25/2023
2 projects
44 LISPENARD STREETMANHATTAN · latest 08/16/2022
1 projects
243 5 AVENUEMANHATTAN · 1 open · latest 07/01/2026
1 projects
160 3 AVENUEMANHATTAN · latest 08/21/2026
1 projects
137 EAST 28 STREETMANHATTAN · latest 03/05/2026
1 projects
5 WEST 53 STREETMANHATTAN · latest 04/24/2026
1 projects
Key relationships
Everyone →
AUGUST LIAUlatest 05/26/2026
15 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01369731 ↗160 3 AVENUE
MANHATTAN
AlterationFiled — no permit on record08/21/2026——
M01407053 ↗123 WASHINGTON STREET
MANHATTAN
AlterationPermit Issued06/03/202607/21/2026INTERIOR RENOVATION IN 47A. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01371211 ↗243 5 AVENUE
MANHATTAN
AlterationPermit Issued06/25/202607/01/2026MH WORK FOR OFFICE BUILD OUT ON THE 25TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01378383 ↗5 WEST 53 STREET
MANHATTAN
AlterationFiled — no permit on record04/24/2026——
M01088633 ↗137 EAST 28 STREET
MANHATTAN
AlterationSigned-off08/08/202403/05/2026PARTIAL REMOVAL OF EXISTING NON-STRUCTURAL EXTERIOR MASONRYWALL AND TWO FRENCH DOORS AT 10TH FLOOR REAR TERRACE FORTHE INSTALLATION OF NEW S…
B01126110 ↗30 ST JOHNS PLACE
BROOKLYN
AlterationPermit Issued10/29/202406/24/2025RENOVATION OF BAS, 1ST AND 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Counts cover all 10 projects (10 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
AUGUST LIAU1505/26/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
TAN ENGINEERING PC306/25/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CITY LINE CONSTRUCTION.LL406/25/2026
LEO'S CONTRACTING GROUP C306/03/2026
PRACTICAL PLBG & HTG INC310/29/2024
G & G MECHANICAL GROUP101/26/2022
GREGG NY PLUMBING, INC102/08/2023
L.L.G. PLBG & HTG INC103/07/2023
TBRO'S RENOVATION INC108/08/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CHARLES H. GREENTHAL MANAGEMENT\203/07/2023
AKAM ASSOCIATES, INC.106/03/2026
Fultonex Management103/12/2024
MQ PROPERTY MGMT LTD101/26/2022
THE MOINIAN GROUP106/25/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CLARKE CONSTRUCTION CONSULTANTS1008/21/2026
10 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 10Open permit 3Signed off 5Filed only 2
10 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01369731 ↗160 3 AVENUE
MANHATTAN
AlterationFiled — no permit on record08/21/2026——
M01407053 ↗123 WASHINGTON STREET
MANHATTAN
AlterationPermit Issued06/03/202607/21/2026INTERIOR RENOVATION IN 47A. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01371211 ↗243 5 AVENUE
MANHATTAN
AlterationPermit Issued06/25/202607/01/2026MH WORK FOR OFFICE BUILD OUT ON THE 25TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01378383 ↗5 WEST 53 STREET
MANHATTAN
AlterationFiled — no permit on record04/24/2026——
M01088633 ↗137 EAST 28 STREET
MANHATTAN
AlterationSigned-off08/08/202403/05/2026PARTIAL REMOVAL OF EXISTING NON-STRUCTURAL EXTERIOR MASONRYWALL AND TWO FRENCH DOORS AT 10TH FLOOR REAR TERRACE FORTHE INSTALLATION OF NEW S…
B01126110 ↗30 ST JOHNS PLACE
BROOKLYN
AlterationPermit Issued10/29/202406/24/2025RENOVATION OF BAS, 1ST AND 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01015213 ↗37-12 PRINCE STREET
QUEENS
AlterationSigned-off03/11/202404/04/2024PL/SP WORK IN 10D ON THE 9TH FLOOR FILED IN CONJUNCTION WITH DOB NOW GC AND MH . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M08042740 ↗1084 2 AVENUE
MANHATTAN
AlterationSigned-off12/05/202204/25/2023PLUMBING FIXTURES IN APT 44G FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00653501 ↗44 LISPENARD STREET
MANHATTAN
AlterationSigned-off01/21/202208/16/2022SP SYSTEMS ON THE 2ND FLOOR FILED IN CONJUNCTION WITH DOB NOW GC, PL , MH . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00748227 ↗1084 2 AVENUE
MANHATTAN
AlterationSigned-off06/16/202208/02/2022PLUMBING FIXTURES IN APT 26B FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Scope of Work
Plumbing — 1 project · most recent 10/29/2024
Gas Water/Sanitary
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
123 WASHINGTON STREET ↗105/26/2026
5 WEST 53 STREET ↗203/25/2026
243 5 AVENUE ↗103/12/2026
160 3 AVENUE ↗103/10/2026
30 ST JOHNS PLACE ↗210/11/2024
137 EAST 28 STREET ↗107/30/2024
37-12 PRINCE STREET ↗103/05/2024
1084 2 AVENUE ↗703/07/2023
44 LISPENARD STREET ↗212/25/2021
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/06/2026M01378383-I1 · 5 WEST 53 STREETRequest digital key ↗
09/06/2026M01378383-S1 · 5 WEST 53 STREETRequest digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
09/03/2026M00653501-S2 · 44 LISPENARD STREETOpen ↗
09/03/2026M00653501-S1 · 44 LISPENARD STREETOpen ↗
08/16/2026M01371211-S2 · 243 5 AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026M01378383-I1 · 5 WEST 53 STREETOpen ↗
09/02/2026M08042740-I1 · 1084 2 AVENUEOpen ↗
09/02/2026M01378383-I1 · 5 WEST 53 STREETOpen ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/06/2026M01378383-S1 · 5 WEST 53 STREETOpen ↗
09/06/2026M01378383-I1 · 5 WEST 53 STREETOpen ↗
09/03/2026M00653501-S2 · 44 LISPENARD STREETOpen ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M08042740-I1 · 1084 2 AVENUEOpen ↗
09/02/2026M01378383-I1 · 5 WEST 53 STREETOpen ↗
09/01/2026M01371211-I1 · 243 5 AVENUEOpen ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/24/2026M01369731-I1 · 160 3 AVENUEOpen ↗
09/06/2026M01378383-S1 · 5 WEST 53 STREETOpen ↗
09/06/2026M01378383-I1 · 5 WEST 53 STREETOpen ↗
Showing 3 of 19 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type