← Back
Design Firm
BRAVO GROUP
Design
2 projects with open permitsMANHATTAN · 3
2 buildings
8
Total Filings
3
Projects on File
2
Buildings Worked
2
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month3 projects all-time
0123May '23 · 1Jun '23 · 2May '23Jun '23
Portfolio status
Browse projects →
Open permit267%
Signed off133%
By project type
Alteration3
Most active buildings
All buildings →
101 EAST 123 STREETMANHATTAN · 2 open · latest 10/10/2024
2 projects
MORNINGSIDE DRIVEMANHATTAN · latest 04/16/2025
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Owners
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00856396 ↗MORNINGSIDE DRIVE
MANHATTAN
AlterationSigned-off05/22/202304/16/2025STRUCTURAL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00881195 ↗101 EAST 123 STREET
MANHATTAN
AlterationPermit Issued06/02/202310/10/2024FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF 3RD FLOOR FOR GROOVE WITH ME DANCE STUDIO AS PER PLANS SUBMITTED HER…
M00881193 ↗101 EAST 123 STREET
MANHATTAN
AlterationPermit Issued06/02/202308/11/2023FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 3RD FLOOR FOR GROOVE WITH ME DANCE STUDIO AS PER PLANS SUBMITTED HEREWITH.
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
FMO ENGINEERING PC104/30/2025
GEORGE RANALLI, ARCHITECT104/30/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AVON PLBG & HTG INC104/30/2025
BEDROCK PLBG. & HTG., INC109/15/2023
EASTSIDE FLOOR SERVICES L109/15/2023
PENINSULA CONSTRUCTION IN104/30/2025
SKH MECHANICAL CORP109/15/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
GROOVE WITH ME209/15/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
GREEN LIGHT EXPEDITING LLC209/15/2023
CLARKE CONSTRUCTION CONSULTANTS104/30/2025
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Open permit 2Signed off 1
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00856396 ↗MORNINGSIDE DRIVE
MANHATTAN
AlterationSigned-off05/22/202304/16/2025STRUCTURAL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00881195 ↗101 EAST 123 STREET
MANHATTAN
AlterationPermit Issued06/02/202310/10/2024FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR RENO OF 3RD FLOOR FOR GROOVE WITH ME DANCE STUDIO AS PER PLANS SUBMITTED HER…
M00881193 ↗101 EAST 123 STREET
MANHATTAN
AlterationPermit Issued06/02/202308/11/2023FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 3RD FLOOR FOR GROOVE WITH ME DANCE STUDIO AS PER PLANS SUBMITTED HEREWITH.
Scope of Work
HVAC — 1 project · most recent 09/15/2023
Air Conditioning Systems
Sprinkler / Standpipe — 1 project · most recent 09/15/2023
No specific sub-scope on file — project count only.
Plumbing — 1 project · most recent 09/15/2023
Water/Sanitary
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
MORNINGSIDE DRIVE ↗404/24/2025
101 EAST 123 STREET ↗409/07/2023
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026M00856396-S2 · MORNINGSIDE DRIVEOpen ↗
08/29/2026M00856396-S1 · MORNINGSIDE DRIVEOpen ↗
08/29/2026M00856396-P2 · MORNINGSIDE DRIVEOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026M00881195-I1 · 101 EAST 123 STREETOpen ↗
08/27/2026M00881193-P1 · 101 EAST 123 STREETOpen ↗
08/24/2026M00881195-P1 · 101 EAST 123 STREETOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026M00881195-I1 · 101 EAST 123 STREETOpen ↗
08/27/2026M00881193-P1 · 101 EAST 123 STREETOpen ↗
08/27/2026M00881193-P1 · 101 EAST 123 STREETOpen ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00856396-S2 · MORNINGSIDE DRIVEOpen ↗
08/29/2026M00856396-S1 · MORNINGSIDE DRIVEOpen ↗
08/29/2026M00856396-I1 · MORNINGSIDE DRIVEOpen ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/13/2026M00881193-I1 · 101 EAST 123 STREETOpen ↗
08/13/2026M00881195-P1 · 101 EAST 123 STREETOpen ↗
08/13/2026M00881193-P1 · 101 EAST 123 STREETOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents2
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment2
09/01/2026M00856396-I1 · MORNINGSIDE DRIVEOpen ↗
09/01/2026M00856396-I1 · MORNINGSIDE DRIVEOpen ↗