← Back
Design Firm
C+C DESIGN GROUP, INC.
Design
2 projects with open permitsQUEENS · 6
3 buildings
12
Total Filings
6
Projects on File
3
Buildings Worked
2
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month6 projects all-time
0123Oct '20 · 2Dec '20 · 1Mar '21 · 1May '21 · 2Oct '20Nov '20Dec '20Jan '21Feb '21Mar '21Apr '21May '21
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit233%
Signed off467%
By project type
Alteration6
Most active buildings
All buildings →
52-46 83 STREETQUEENS · 2 open · latest 12/12/2023
2 projects
104-28 124 STREETQUEENS · latest 02/25/2021
2 projects
115-11 MERRICK BOULEVARDQUEENS · latest 08/05/2021
2 projects
Key relationships
Everyone →
Filing representatives
EDWIN CHIONGlatest 08/19/2021
8 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00517067 ↗52-46 83 STREET
QUEENS
AlterationPermit Issued05/17/202112/12/2023FILE TO LEGALIZED CELLAR WITH A 3 FIXTURES FULL BATH FOR ACCESSORY USE TO RESOLVE VIOLATION#35560211N, NO CHANGED IN OCCUPANCY, USE GROUP, …
Q00517056 ↗52-46 83 STREET
QUEENS
AlterationPermit Issued05/17/202106/17/2022FILE TO LEGALIZED CELLAR WITH A 3 FIXTURES FULL BATH FOR ACCESSORY USE TO RESOLVE VIOLATION#35560211N & #35560210L, NO CHANGED IN OCCUPANCY…
Q00402034 ↗115-11 MERRICK BOULEVARD
QUEENS
AlterationSigned-off10/14/202008/05/2021INSTALL (1) ONE NEW BOILER AT BOILER ROOM IN THE FIRST FLOOR FOR RESIDENTIAL USE IN SECOND FLOOR.
Q00491604 ↗115-11 MERRICK BOULEVARD
QUEENS
AlterationSigned-off03/24/202106/30/2021NEW (1) COMBI UNIT NAVIEN HOT WATER HEATER (NCB-21OE) IN 1ST FLOOR FOR COMMERCIAL USE.
Q00399630 ↗104-28 124 STREET
QUEENS
AlterationSigned-off10/05/202002/25/2021CAP & REMOVE EXISTING GAS FURNACE AND HWH FOR A COMBI UNIT AND A ADD A SECOND NEW COMBI UNIT. REPLACE BATHROOM FIXTURES; RELOCATE KITCHEN FI…
Q00435786 ↗104-28 124 STREET
QUEENS
AlterationSigned-off12/03/202012/18/2020Install Temporary Construction Fence in all the perimeter of the property line.
Counts cover all 6 projects (6 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
EDWIN CHIONG808/19/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ZONE PLUMBING & HEATING C208/02/2021
KISHAN PLBG & HEATING INC108/31/2021
LG ELITE PLUMBING INC105/17/2021
STELLAR INDUSTRIES INC112/03/2020
VEEVA CONSTRUCTION J INC105/17/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ADAC CONSTRUCTION INC208/02/2021
6 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 6Open permit 2Signed off 4
6 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00517067 ↗52-46 83 STREET
QUEENS
AlterationPermit Issued05/17/202112/12/2023FILE TO LEGALIZED CELLAR WITH A 3 FIXTURES FULL BATH FOR ACCESSORY USE TO RESOLVE VIOLATION#35560211N, NO CHANGED IN OCCUPANCY, USE GROUP, …
Q00517056 ↗52-46 83 STREET
QUEENS
AlterationPermit Issued05/17/202106/17/2022FILE TO LEGALIZED CELLAR WITH A 3 FIXTURES FULL BATH FOR ACCESSORY USE TO RESOLVE VIOLATION#35560211N & #35560210L, NO CHANGED IN OCCUPANCY…
Q00402034 ↗115-11 MERRICK BOULEVARD
QUEENS
AlterationSigned-off10/14/202008/05/2021INSTALL (1) ONE NEW BOILER AT BOILER ROOM IN THE FIRST FLOOR FOR RESIDENTIAL USE IN SECOND FLOOR.
Q00491604 ↗115-11 MERRICK BOULEVARD
QUEENS
AlterationSigned-off03/24/202106/30/2021NEW (1) COMBI UNIT NAVIEN HOT WATER HEATER (NCB-21OE) IN 1ST FLOOR FOR COMMERCIAL USE.
Q00399630 ↗104-28 124 STREET
QUEENS
AlterationSigned-off10/05/202002/25/2021CAP & REMOVE EXISTING GAS FURNACE AND HWH FOR A COMBI UNIT AND A ADD A SECOND NEW COMBI UNIT. REPLACE BATHROOM FIXTURES; RELOCATE KITCHEN FI…
Q00435786 ↗104-28 124 STREET
QUEENS
AlterationSigned-off12/03/202012/18/2020Install Temporary Construction Fence in all the perimeter of the property line.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
104-28 124 STREET ↗408/19/2021
115-11 MERRICK BOULEVARD ↗607/26/2021
52-46 83 STREET ↗2—
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch4
08/27/2026Q00517067-I1 · 52-46 83 STREETRequest digital key ↗
08/27/2026Q00517056-I1 · 52-46 83 STREETRequest digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
▸DOB NOWPlans/Sketch - Plumbing3
▸DOB NOWPlans/Sketch - Construction Fence1
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00517067-I1 · 52-46 83 STREETOpen ↗
08/13/2026Q00517056-I1 · 52-46 83 STREETOpen ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00435786-I1 · 104-28 124 STREETOpen ↗
08/27/2026Q00517067-I1 · 52-46 83 STREETOpen ↗
08/27/2026Q00517056-I1 · 52-46 83 STREETOpen ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q00491604-I1 · 115-11 MERRICK BOULEVARDOpen ↗
08/26/2026Q00491604-P1 · 115-11 MERRICK BOULEVARDOpen ↗
08/24/2026Q00402034-I1 · 115-11 MERRICK BOULEVARDOpen ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00517067-I1 · 52-46 83 STREETOpen ↗
08/27/2026Q00517056-I1 · 52-46 83 STREETOpen ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00399630-I1 · 104-28 124 STREETOpen ↗