← Back
Design Firm
EPSTEIN
Design · filed under 3 names
4 projects with open permitsQUEENS · 9
2 buildings
26
Total Filings
9
Projects on File
2
Buildings Worked
4
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month9 projects all-time
0246Nov '21 · 1Jun '22 · 5Sep '23 · 2Jun '24 · 1202220232024
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit444%
Signed off556%
By project type
Alteration8
Alteration CO1
Most active buildings
All buildings →
182-22 150TH AVENUEQUEENS · 3 open · latest 06/25/2025
8 projects
145-69 226 STREETQUEENS · 1 open · latest 08/02/2024
1 projects
Key relationships
Everyone →
Filing representatives
Owners
JOSEPH NELSONlatest 11/19/2024
8 filings
DAVID HILTYlatest 11/19/2024
5 filings
Unnamedlatest 11/19/2024
4 filings
THOMAS SUAREZlatest 09/27/2022
2 filings
SHANE BRUNNERlatest 04/17/2023
1 filings
Filed under
EPSTEIN12A. EPSTEIN AND SONS INTERNATIONAL,10AESI ARCHITECTURE AND ENGINEERING P4
Identified by the contact ids of the people who file for the firm and by its email domain (epsteinglobal.com), not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00723547 ↗182-22 150TH AVENUE
QUEENS
Alteration COPermit Issued06/06/202206/25/2025General Construction and Alt CO work related to horizontal enlargement and conversion from prison to trucking terminal warehouse building. A…
Q00727100 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/09/202202/12/2025Filing for removal and installation of new plumbing fixtures related to renovations of proposed Trucking Terminal Warehouse building.
Q00726759 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/08/202201/30/2025Proposed asphalt pavement in parking area and related site civil work for proposed trucking terminal warehouse renovations filed under separ…
Q01047133 ↗145-69 226 STREET
QUEENS
AlterationPermit Issued06/19/202408/02/2024Demolish existing gas piping with new gas connections as per plans filed herewith, all existing equipment to remain. No change to use, egres…
Q00727048 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/29/202212/27/2023Filing for support of excavation related to horizontal enlargement of 182-22 150th Ave proposed trucking terminal warehouse.
Q00727072 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/09/202212/27/2023Filing for installation of fans, gas unit heaters, diffusers & grilles, and related ductwork to existing HVAC rooftop units. Related to prop…
Counts cover all 9 projects (9 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
JOSEPH NELSON811/19/2024
DAVID HILTY511/19/2024
Unnamed411/19/2024
THOMAS SUAREZ209/27/2022
SHANE BRUNNER104/17/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CONSIGLI CONSTRUCTION CO608/28/2025
BLETSAS PLBNG & HTG CORP112/09/2024
PANILI PLUMBING & HTG LLC112/09/2024
THE SCI CONSTRUCTION111/03/2021
VILLAGE P & H NY INC111/05/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CUSHMAN & WAKEFIELD808/28/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JAM CONSULTANTS, INC.908/28/2025
9 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 9Open permit 4Signed off 5
Any typeAlteration 8Alteration CO 1
9 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00723547 ↗182-22 150TH AVENUE
QUEENS
Alteration COPermit Issued06/06/202206/25/2025General Construction and Alt CO work related to horizontal enlargement and conversion from prison to trucking terminal warehouse building. A…
Q00727100 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/09/202202/12/2025Filing for removal and installation of new plumbing fixtures related to renovations of proposed Trucking Terminal Warehouse building.
Q00726759 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/08/202201/30/2025Proposed asphalt pavement in parking area and related site civil work for proposed trucking terminal warehouse renovations filed under separ…
Q01047133 ↗145-69 226 STREET
QUEENS
AlterationPermit Issued06/19/202408/02/2024Demolish existing gas piping with new gas connections as per plans filed herewith, all existing equipment to remain. No change to use, egres…
Q00727048 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/29/202212/27/2023Filing for support of excavation related to horizontal enlargement of 182-22 150th Ave proposed trucking terminal warehouse.
Q00727072 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off06/09/202212/27/2023Filing for installation of fans, gas unit heaters, diffusers & grilles, and related ductwork to existing HVAC rooftop units. Related to prop…
Q00921546 ↗182-22 150TH AVENUE
QUEENS
AlterationPermit Issued09/13/202310/11/2023installation of curb cut on 150 avenue as shown on plans.
Q00921550 ↗182-22 150TH AVENUE
QUEENS
AlterationPermit Issued09/12/202309/21/2023installation of new curb cut located on 150 avenue as per plans filed herewith.
Q00606516 ↗182-22 150TH AVENUE
QUEENS
AlterationSigned-off11/03/202111/10/2021Interior Demolition of non-load bearing partitions, doors and related general construction.
Scope of Work
HVAC — 1 project · most recent 11/08/2023
Associated Ducts and Piping Heating Systems
Plumbing — 1 project · most recent 11/05/2024
Gas
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
182-22 150TH AVENUE ↗2411/19/2024
145-69 226 STREET ↗210/09/2024
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
Showing 3 of 28 on file for this type
▸Applications & Permits4
▸DOB NOWDEP Stormwater Construction Permit3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Seals & Professional Certifications77
▸DOB NOWProgress Inspector Seal & Signature27
09/02/2026Q00727072-I1 · 182-22 150TH AVENUEOpen ↗
09/02/2026Q00727072-I1 · 182-22 150TH AVENUEOpen ↗
09/02/2026Q00727072-I1 · 182-22 150TH AVENUEOpen ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/25/2026Q00727048-P1 · 182-22 150TH AVENUEOpen ↗
08/25/2026Q00727048-I1 · 182-22 150TH AVENUEOpen ↗
08/25/2026Q00727048-P3 · 182-22 150TH AVENUEOpen ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026Q00727100-P1 · 182-22 150TH AVENUEOpen ↗
09/02/2026Q00727072-I1 · 182-22 150TH AVENUEOpen ↗
09/01/2026Q00727048-S1 · 182-22 150TH AVENUEOpen ↗
Showing 3 of 24 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/25/2026Q00727048-I1 · 182-22 150TH AVENUEOpen ↗
08/25/2026Q00727048-S1 · 182-22 150TH AVENUEOpen ↗
08/23/2026Q00727100-I1 · 182-22 150TH AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01047133-I1 · 145-69 226 STREETOpen ↗
08/13/2026Q01047133-P1 · 145-69 226 STREETOpen ↗
08/13/2026Q00606516-I1 · 182-22 150TH AVENUEOpen ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents21
▸DOB NOWSite Survey: Initial5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWPlot Diagram5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTR5H Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type