← Back
Design Firm
RAN Fire Protection Engineering, PC
Design
1 project with open permitsMANHATTAN · 1
1 building
3
Total Filings
1
Projects on File
1
Buildings Worked
1
Projects w/ Open Permits
Design
Role
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Open permit1100%
By project type
Alteration1
Most active buildings
All buildings →
PIER 40MANHATTAN · 1 open · latest 07/07/2026
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Owners
Christopher Crivellolatest 09/03/2025
3 filings
Filed under
RAN Fire Protection Engineering, PC3
Identified by the contact ids of the people who file for the firm and by its email domain (ranfpe.com), not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01169883 ↗PIER 40
MANHATTAN
AlterationPermit Issued03/28/202507/07/2026Removal and replacement of existing fire standpipe system throughout the Pier 40 building. Provide a class I automatic standpipe system thro…
Counts cover all 1 projects (1 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
Christopher Crivello309/03/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
H2M ARCHITECTS AND ENGINEERS106/04/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
EMPIRE FIRE SUPPN CO CORP106/04/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HUDSON RIVER PARK TRUST106/04/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JMV ASSOCIATES LLC106/04/2026
1 DOB NOW project, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 1Open permit 1
1 project
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01169883 ↗PIER 40
MANHATTAN
AlterationPermit Issued03/28/202507/07/2026Removal and replacement of existing fire standpipe system throughout the Pier 40 building. Provide a class I automatic standpipe system thro…
Scope of Work
Sprinkler / Standpipe — 1 project · most recent 06/04/2026
No specific sub-scope on file — project count only.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
PIER 40 ↗309/03/2025
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026M01169883-P2 · PIER 40Request digital key ↗
08/16/2026M01169883-S2 · PIER 40Request digital key ↗
08/16/2026M01169883-S1 · PIER 40Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026M01169883-S1 · PIER 40Open ↗
08/16/2026M01169883-I1 · PIER 40Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01169883-S2 · PIER 40Open ↗
09/01/2026M01169883-P1 · PIER 40Open ↗
09/01/2026M01169883-P2 · PIER 40Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M01169883-I1 · PIER 40Open ↗
08/25/2026M01169883-I1 · PIER 40Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026M01169883-P2 · PIER 40Open ↗
08/16/2026M01169883-S1 · PIER 40Open ↗
Showing 2 of 4 on file for this type
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/16/2026M01169883-P2 · PIER 40Open ↗
08/16/2026M01169883-I1 · PIER 40Open ↗
Showing 2 of 5 on file for this type