← Back
Design Firm
STUDIOKCA ARCHITECTURE
Design
BROOKLYN · 2
1 building
4
Total Filings
2
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Design
Role
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
145 HICKS STREETBROOKLYN · latest 09/20/2022
2 projects
Key relationships
Everyone →
Filing representatives
1 projects
Contractors
JASON KLIMOSKIlatest 12/15/2022
2 filings
Filed under
STUDIOKCA ARCHITECTURE4
Identified by the contact ids of the people who file for the firm and by its email domain (studiokca.com), not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00513626 ↗145 HICKS STREET
BROOKLYN
AlterationSigned-off05/10/202109/20/2022
Contractor TCM CORPORATION
INTERIOR RENOVATION OF APARTMENT A68/B68 ON SIXTH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00515387 ↗145 HICKS STREET
BROOKLYN
AlterationSigned-off05/10/202106/17/2022PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT A68/B68 ON SIXTH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN …
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
JASON KLIMOSKI212/15/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JOHN FITZGERALD PLBG &HTG105/10/2021
TCM CORPORATION112/16/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ADAM MAISER112/16/2022
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00513626 ↗145 HICKS STREET
BROOKLYN
AlterationSigned-off05/10/202109/20/2022
Contractor TCM CORPORATION
INTERIOR RENOVATION OF APARTMENT A68/B68 ON SIXTH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00515387 ↗145 HICKS STREET
BROOKLYN
AlterationSigned-off05/10/202106/17/2022PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT A68/B68 ON SIXTH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN …
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
145 HICKS STREET ↗412/15/2022
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00513626-P1 · 145 HICKS STREETRequest digital key ↗
09/01/2026B00515387-I1 · 145 HICKS STREETRequest digital key ↗
08/14/2026B00513626-I1 · 145 HICKS STREETRequest digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026B00513626-P1 · 145 HICKS STREETOpen ↗
08/13/2026B00513626-I1 · 145 HICKS STREETOpen ↗
08/13/2026B00515387-I1 · 145 HICKS STREETOpen ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B00513626-P1 · 145 HICKS STREETOpen ↗
08/25/2026B00513626-P1 · 145 HICKS STREETOpen ↗
08/24/2026B00513626-I1 · 145 HICKS STREETOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00513626-P1 · 145 HICKS STREETOpen ↗
09/01/2026B00513626-I1 · 145 HICKS STREETOpen ↗
09/01/2026B00515387-I1 · 145 HICKS STREETOpen ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00513626-P1 · 145 HICKS STREETOpen ↗
09/01/2026B00515387-I1 · 145 HICKS STREETOpen ↗
08/14/2026B00513626-I1 · 145 HICKS STREETOpen ↗