| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00423019 ↗ | 26 EAST 63RD STREET MANHATTAN | Alteration | Signed-off | 11/15/2020 | 07/13/2022 | Design BECHT ENGINEERING BT, INC. Owner INVESTCO TWO LLC Contractor AIR DEPOT COMM REFR COR | Ductless A/C Unit installation at 7th floor apartment # 7F, 28,400 BTU. |
| M00420510 ↗ | 26 EAST 63RD STREET MANHATTAN | Alteration | Signed-off | 10/28/2020 | 12/03/2020 | Design ARCHITECT IRA SHAPIRO Owner INVESTCO TWO LLC Contractor ABR PLBG&HTG CONTR INC | New, replaced plumbing fixtures at 7th floor apartment # 7F |
| M00255101 ↗ | 870 5TH AVENUE MANHATTAN | Alteration | Signed-off | 12/13/2019 | 01/16/2020 | Design ABRAHAM BLOCH ARCHITECT Contractor WATERFIRE INC | Apt 6A - Replace bathtub with shower, reinstall existing lavatory and toilet. All fixtures to remain on existing roughing. All existing bran… |
| Name | Projects together | Most recent |
|---|---|---|
| Architect Ira Shapiro | 1 | 06/23/2022 |
| Becht Engineering BT | 1 | 07/13/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Abr Plumbing & Heating Contracting | 1 | 06/23/2022 |
| Air Depot Commercial Refrigeration | 1 | 07/13/2022 |
| Waterfire | 1 | 12/13/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Investco Two | 2 | 07/13/2022 |
| Weinstein Enterprises | 1 | 12/13/2019 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00423019 ↗ | 26 EAST 63RD STREET MANHATTAN | Alteration | Signed-off | 11/15/2020 | 07/13/2022 | Design BECHT ENGINEERING BT, INC. Owner INVESTCO TWO LLC Contractor AIR DEPOT COMM REFR COR | Ductless A/C Unit installation at 7th floor apartment # 7F, 28,400 BTU. |
| M00420510 ↗ | 26 EAST 63RD STREET MANHATTAN | Alteration | Signed-off | 10/28/2020 | 12/03/2020 | Design ARCHITECT IRA SHAPIRO Owner INVESTCO TWO LLC Contractor ABR PLBG&HTG CONTR INC | New, replaced plumbing fixtures at 7th floor apartment # 7F |
| M00255101 ↗ | 870 5TH AVENUE MANHATTAN | Alteration | Signed-off | 12/13/2019 | 01/16/2020 | Design ABRAHAM BLOCH ARCHITECT Contractor WATERFIRE INC | Apt 6A - Replace bathtub with shower, reinstall existing lavatory and toilet. All fixtures to remain on existing roughing. All existing bran… |
| Building | Filings | Most Recent |
|---|---|---|
| 26 EAST 63RD STREET ↗ | 4 | 06/23/2022 |
| 870 5TH AVENUE ↗ | 1 | 12/13/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/05/2022 | Fire-Resistant Penetrations and Joints | 26 EAST 63RD STREET | ABRAHAM BLOCH | special |
| 07/05/2022 | Energy Code Compliance Inspections | 26 EAST 63RD STREET | IRA SHAPIRO | progress |
| 07/05/2022 | Fire-Resistant Penetrations and Joints | 26 EAST 63RD STREET | ABRAHAM BLOCH | special |
| 07/05/2022 | Energy Code Compliance Inspections | 26 EAST 63RD STREET | IRA SHAPIRO | progress |
| 06/23/2022 | Energy Code Compliance Inspections | 26 EAST 63RD STREET | IRA SHAPIRO | progress |
| 06/23/2022 | Fire-Resistant Penetrations and Joints | 26 EAST 63RD STREET | ABRAHAM BLOCH | special |
| 10/18/2021 | Fire-Resistant Penetrations and Joints | 26 EAST 63RD STREET | ABRAHAM BLOCH | special |
| 10/18/2021 | Energy Code Compliance Inspections | 26 EAST 63RD STREET | IRA SHAPIRO | progress |
| 12/13/2019 | Electrical energy consumption | 870 5TH AVENUE | ABRAHAM BLOCH | energy_progress |
| 11/19/2019 | Fire-Resistance Rated Construction | 870 5TH AVENUE | ABRAHAM BLOCH | progress |
| 11/19/2019 | Energy Code Compliance Inspections | 870 5TH AVENUE | ABRAHAM BLOCH | progress |
| 11/19/2019 | Fire-Resistant Penetrations and Joints | 870 5TH AVENUE | ABRAHAM BLOCH | special |