Back
Special Inspection Agency
Abraham Bloch Architect
Special Inspection Agency
MANHATTAN · 3
2 buildings
5
Total Filings
3
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month3 projects all-time
0112Dec '19 · 1Oct '20 · 1Nov '20 · 1Dec '19Feb '20Apr '20Jun '20Aug '20Oct '20Nov '20
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off3100%
By project type
Alteration3
Most active buildings
All buildings →
26 EAST 63RD STREETMANHATTAN · latest 07/13/2022
2 projects
870 5TH AVENUEMANHATTAN · latest 01/16/2020
1 projects
Key relationships
Everyone →
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00423019 ↗26 EAST 63RD STREET
MANHATTAN
AlterationSigned-off11/15/202007/13/2022Ductless A/C Unit installation at 7th floor apartment # 7F, 28,400 BTU.
M00420510 ↗26 EAST 63RD STREET
MANHATTAN
AlterationSigned-off10/28/202012/03/2020New, replaced plumbing fixtures at 7th floor apartment # 7F
M00255101 ↗870 5TH AVENUE
MANHATTAN
AlterationSigned-off12/13/201901/16/2020
Contractor WATERFIRE INC
Apt 6A - Replace bathtub with shower, reinstall existing lavatory and toilet. All fixtures to remain on existing roughing. All existing bran…
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Architect Ira Shapiro106/23/2022
Becht Engineering BT107/13/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Abr Plumbing & Heating Contracting106/23/2022
Air Depot Commercial Refrigeration107/13/2022
Waterfire112/13/2019
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Investco Two207/13/2022
Weinstein Enterprises112/13/2019
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Signed off 3
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00423019 ↗26 EAST 63RD STREET
MANHATTAN
AlterationSigned-off11/15/202007/13/2022Ductless A/C Unit installation at 7th floor apartment # 7F, 28,400 BTU.
M00420510 ↗26 EAST 63RD STREET
MANHATTAN
AlterationSigned-off10/28/202012/03/2020New, replaced plumbing fixtures at 7th floor apartment # 7F
M00255101 ↗870 5TH AVENUE
MANHATTAN
AlterationSigned-off12/13/201901/16/2020
Contractor WATERFIRE INC
Apt 6A - Replace bathtub with shower, reinstall existing lavatory and toilet. All fixtures to remain on existing roughing. All existing bran…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
26 EAST 63RD STREET ↗406/23/2022
870 5TH AVENUE ↗112/13/2019
▾Special Inspection Requirements — 12
DateRequirementBuildingInspectorRole
07/05/2022Fire-Resistant Penetrations and Joints26 EAST 63RD STREETABRAHAM BLOCHspecial
07/05/2022Energy Code Compliance Inspections26 EAST 63RD STREETIRA SHAPIROprogress
07/05/2022Fire-Resistant Penetrations and Joints26 EAST 63RD STREETABRAHAM BLOCHspecial
07/05/2022Energy Code Compliance Inspections26 EAST 63RD STREETIRA SHAPIROprogress
06/23/2022Energy Code Compliance Inspections26 EAST 63RD STREETIRA SHAPIROprogress
06/23/2022Fire-Resistant Penetrations and Joints26 EAST 63RD STREETABRAHAM BLOCHspecial
10/18/2021Fire-Resistant Penetrations and Joints26 EAST 63RD STREETABRAHAM BLOCHspecial
10/18/2021Energy Code Compliance Inspections26 EAST 63RD STREETIRA SHAPIROprogress
12/13/2019Electrical energy consumption870 5TH AVENUEABRAHAM BLOCHenergy_progress
11/19/2019Fire-Resistance Rated Construction870 5TH AVENUEABRAHAM BLOCHprogress
11/19/2019Energy Code Compliance Inspections870 5TH AVENUEABRAHAM BLOCHprogress
11/19/2019Fire-Resistant Penetrations and Joints870 5TH AVENUEABRAHAM BLOCHspecial
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00255101-I1 · 870 5TH AVENUERequest digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
09/02/2026M00420510-P1 · 26 EAST 63RD STREETOpen ↗
08/15/2026M00423019-I1 · 26 EAST 63RD STREETOpen ↗
08/13/2026M00255101-I1 · 870 5TH AVENUEOpen ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00255101-I1 · 870 5TH AVENUEOpen ↗
09/02/2026M00255101-I1 · 870 5TH AVENUEOpen ↗
09/02/2026M00255101-I1 · 870 5TH AVENUEOpen ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00420510-P1 · 26 EAST 63RD STREETOpen ↗
09/02/2026M00420510-I1 · 26 EAST 63RD STREETOpen ↗
09/02/2026M00423019-I1 · 26 EAST 63RD STREETOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M00255101-I1 · 870 5TH AVENUEOpen ↗
09/01/2026M00423019-P1 · 26 EAST 63RD STREETOpen ↗
08/22/2026M00420510-P2 · 26 EAST 63RD STREETOpen ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
09/02/2026M00420510-P1 · 26 EAST 63RD STREETOpen ↗
08/15/2026M00423019-I1 · 26 EAST 63RD STREETOpen ↗
08/13/2026M00255101-I1 · 870 5TH AVENUEOpen ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00420510-P1 · 26 EAST 63RD STREETOpen ↗
09/02/2026M00420510-I1 · 26 EAST 63RD STREETOpen ↗
08/15/2026M00423019-I1 · 26 EAST 63RD STREETOpen ↗
Showing 3 of 5 on file for this type