| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01395335 ↗ | 78 8 AVENUE BROOKLYN | Alteration | Permit Issued | 06/01/2026 | 08/03/2026 | Interior renovation and apartment combination of existing Units 2F & 2G including partition relocation, removal of one kitchen, bathroom ren… |
| M01211444 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 04/24/2025 | 11/18/2025 | INTERIOR RENOVATION OF EXISTING APARTMENT UNIT 10F INCLUDING PARTITIONS, FLOORING, CEILING, AND LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS,… |
| M01106580 ↗ | 345 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 09/27/2024 | 06/24/2025 | THE PREVIOUS LEGALIZATION APPLICATION #M01106580-S1 MISTAKENLY EXPRESSED THE GAS RANGE AS A NEW. HOWEVER, THE LEGALIZATION APPLICATION CANNO… |
| B01217671 ↗ | 202 MAPLE STREET BROOKLYN | Alteration | Permit Issued | 05/09/2025 | 06/10/2025 | INTERIOR WORK: NON LOAD BEARING PARTITIONS TO CREATE CLOSETS AND EXTEND A BATHROOM, REPLACE KITCHEN CABINETS AND RELOCATE APPLIANCES, REPLAC… |
| M01012611 ↗ | 1254 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/25/2024 | 03/24/2025 | RENOVATION OF EXISTING DWELLING UNIT REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INST… |
| M01166839 ↗ | 1030 3 AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2025 | 02/20/2025 | APARTMENT RENOVATION INCLUDING MODIFICATION AND INSTALLATION OF PARTITIONS, FLOORING, CEILING, CABINETRY, AND LIGHTING. NO CHANGE IN USE, E… |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01395335 ↗ | 78 8 AVENUE BROOKLYN | Alteration | Permit Issued | 06/01/2026 | 08/03/2026 | Interior renovation and apartment combination of existing Units 2F & 2G including partition relocation, removal of one kitchen, bathroom ren… |
| M01211444 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 04/24/2025 | 11/18/2025 | INTERIOR RENOVATION OF EXISTING APARTMENT UNIT 10F INCLUDING PARTITIONS, FLOORING, CEILING, AND LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS,… |
| M01106580 ↗ | 345 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 09/27/2024 | 06/24/2025 | THE PREVIOUS LEGALIZATION APPLICATION #M01106580-S1 MISTAKENLY EXPRESSED THE GAS RANGE AS A NEW. HOWEVER, THE LEGALIZATION APPLICATION CANNO… |
| B01217671 ↗ | 202 MAPLE STREET BROOKLYN | Alteration | Permit Issued | 05/09/2025 | 06/10/2025 | INTERIOR WORK: NON LOAD BEARING PARTITIONS TO CREATE CLOSETS AND EXTEND A BATHROOM, REPLACE KITCHEN CABINETS AND RELOCATE APPLIANCES, REPLAC… |
| M01012611 ↗ | 1254 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/25/2024 | 03/24/2025 | RENOVATION OF EXISTING DWELLING UNIT REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INST… |
| M01166839 ↗ | 1030 3 AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2025 | 02/20/2025 | APARTMENT RENOVATION INCLUDING MODIFICATION AND INSTALLATION OF PARTITIONS, FLOORING, CEILING, CABINETRY, AND LIGHTING. NO CHANGE IN USE, E… |
| Q01065736 ↗ | 133-15 39 AVENUE QUEENS | Alteration | Signed-off | 06/14/2024 | 12/02/2024 | Modifications to the existing sprinkler system for interior fit out of existing commercial space. No change in use, egress or occupancy. |
| M00552271 ↗ | 43 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 08/26/2021 | 09/04/2024 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH COMBINING CO-OP UNITS (3AB & 3K) ON THE SAME FLOOR (TO COMPLY WITH TPPN 03/97). |
| M01066905 ↗ | 131 WEST 16 STREET MANHATTAN | Alteration | Signed-off | 07/17/2024 | 07/29/2024 | Interior renovation of an existing apartment (unit# 668). No change in use, egress, or occupancy. |
| M01047681 ↗ | 90 FRANKLIN STREET MANHATTAN | Alteration | Signed-off | 05/10/2024 | 06/27/2024 | INTERIOR RENOVATION INCLUDING REPLACING KITCHEN & BATHROOM FINISHES, NEW FLOORING, PAINTING, & MINOR ELECTRICAL. RELOCATION OF NON-STRUCTURA… |
| M01033429 ↗ | 563 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2024 | 06/11/2024 | installation of sprinkler fixtures along with related piping. |
| M01033413 ↗ | 563 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2024 | 05/15/2024 | Installations of acoustically lined ductwork, linear diffusers returns, and vav boxes with associated controls. |
| B01009939 ↗ | 960 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 04/16/2024 | 05/09/2024 | INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT … |
| M01028732 ↗ | 563 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/19/2024 | 05/07/2024 | installation and removal of interior partitions, ceiling, and doors. |
| M00991907 ↗ | 14 EAST 4 STREET MANHATTAN | Alteration | Signed-off | 02/03/2024 | 04/22/2024 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRE… |
| Q00942314 ↗ | 115-08 ROCKAWAY BEACH BLVD QUEENS | Alteration | Signed-off | 10/04/2023 | 02/09/2024 | INSTALLATION OF HEATING/COOLING AC UNITS, AND KITCHEN HOODS, EXHAUST FANS, MAKE-UP AIR UNIT WITH DUCT WORK. |
| M00972391 ↗ | 11 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 01/16/2024 | 02/02/2024 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00942355 ↗ | 115-08 ROCKAWAY BEACH BLVD QUEENS | Alteration | Signed-off | 10/04/2023 | 11/01/2023 | INSTALLATION OF PLUMBING FIXTURES AND NEW DOMESTIC WATER SERVICE AND WATER METER. |
| Q00938910 ↗ | 115-08 ROCKAWAY BEACH BLVD QUEENS | Alteration CO | Permit Issued | 09/26/2023 | 10/30/2023 | THIS PROJECT IS A CHANGE IN USE TO THE 1ST-FLOOR SPACE FROM UNFINISHED STORAGE TO COMMERCIAL RESTAURANT SPACE INCLUDING NEW CONCRETE SLABS O… |
| M00861671 ↗ | 11 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 06/01/2023 | 06/29/2023 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00714268 ↗ | 320 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 04/19/2022 | 05/25/2023 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT |
| M00830344 ↗ | 151 EAST 76 STREET MANHATTAN | Alteration | Signed-off | 03/06/2023 | 03/24/2023 | INTERIOR RENOVATION: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINISHES. INSTALLATION OF NEW GWB, FLOOR, CLG & WALL FINISHES. REPLACEMENT A… |
| M00830348 ↗ | 151 EAST 76 STREET MANHATTAN | Alteration | Signed-off | 03/06/2023 | 03/23/2023 | PLUMBING SCOPE OF WORK IN-CONUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATIONAPPLICATION. |
| M08030751 ↗ | 563 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/21/2022 | 01/25/2023 | installation of sprinkler fixtures along with related piping. |
| M00734507 ↗ | 784 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/17/2022 | 01/20/2023 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH INTERIOR RENOVATION GENERAL CONSTRUCTION APPLICATION FOR DUPLEX. NO CHANGE TO USE, EGRESS OR OCCU… |
| M08038591 ↗ | 111 EAST 75 STREET MANHATTAN | Alteration | Signed-off | 12/12/2022 | 01/13/2023 | Non-structural demo and interior renovation for doctors office as shown on plans |
| M08030730 ↗ | 563 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/18/2022 | 01/10/2023 | Installation of interior partitions, ceilings and doors. |
| M08030745 ↗ | 563 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/21/2022 | 01/10/2023 | installation of mechanical system and duct work. |
| M08055637 ↗ | 312 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 12/19/2022 | 12/30/2022 | EXISTING APARTMENT RENOVATION INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS, FLOORING, AND MINOR CARPENTRY WORKS. |
| M00714267 ↗ | 320 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 04/18/2022 | 10/11/2022 | INTER. RENOV.: REMOVAL & DISPOSAL OF INT. GWB, FLR, CLG & WALL FINISHES. INSTALL NEW GWB, FLOOR, CLG & WALL FINISHES. REPLACEMENT LIGHT FIXT… |
| M00757496 ↗ | 15 WAVERLY PLACE MANHATTAN | Alteration | Signed-off | 07/28/2022 | 09/07/2022 | COMBINE 2 APTS (6P & 6R) ON THE SAME FLR (TO COMPLY WITH TPPN 03/97): INTER. RENOV. ONLY: REMOVAL OF GWB, FLR, CLG & WALL FINS. & LIGHT FIXT… |
| M00757502 ↗ | 15 WAVERLY PLACE MANHATTAN | Alteration | Signed-off | 07/28/2022 | 09/07/2022 | PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION FOR COMBINING CO-OP UNITS (6P & 6R) ON THE SAME FLOOR (TO COMPLY… |
| B00628208 ↗ | 125 HAWTHORNE STREET BROOKLYN | Alteration | Signed-off | 11/21/2021 | 08/01/2022 | PLUMBING SCOPE OF WORK IN-CONUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION. |
| M00705860 ↗ | 1327 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 05/24/2022 | 06/06/2022 | Interior renovation of Apt 26B as per plans filed herewith. No change of use, egress, or occupancy. |
| M00705884 ↗ | 1327 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 05/24/2022 | 06/06/2022 | Minor modification of plumbing fixtures and finishes in conjunction with the renovation of apartment 26B; as per plans filed herewith. No ch… |
| M00734506 ↗ | 784 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/17/2022 | 06/01/2022 | INTER. RENOV.: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINISHES. INSTALLAT'N OF NEW GWB,FLOOR, CLG & WALL FINISHES, ALL IN EXISTING RESID… |
| M00732958 ↗ | 241 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 05/11/2022 | 05/17/2022 | INSTALLATION OF STAIRS AND STEEL BEAMS INCLUDING WIDE FLANGES, CHANNELS, TEES, HSS, PIPES, ANGLES, AND PLATES FOR STRUCTURAL REINFORCEMENT. |
| M00732933 ↗ | 241 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 05/09/2022 | 05/16/2022 | COMBINATION AND RENOVATION OF APT 2A AND 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00715395 ↗ | 241 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 04/15/2022 | COMBINATION AND RENOVATION OF APT 2A AND 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00650941 ↗ | 1327 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/09/2022 | 03/30/2022 | Renovation of an existing apartment including plumbing work, as per plans filed herewith. No change of use, egress, or occupancy. |
| M00650921 ↗ | 1327 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/09/2022 | 03/29/2022 | Renovation of an existing apartment including general construction work, as per plans filed herewith. No change of use, egress, or occupanc… |
| M00595615 ↗ | 160 WEST 66 STREET MANHATTAN | Alteration | Signed-off | 09/23/2021 | 12/21/2021 | Installation of apartment unit shut off valve, branch line for cold and hot water, and one shower sewer branch line from the main riser. All… |
| B00628207 ↗ | 125 HAWTHORNE STREET BROOKLYN | Alteration | Signed-off | 11/22/2021 | 12/14/2021 | INTER. RENOV.: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINISHES. INSTALLAT'N OF NEW GWB, FLOOR, CLG & WALL FINISHES. NO CHANGE TO USE, EG… |
| M00595602 ↗ | 160 WEST 66 STREET MANHATTAN | Alteration | Signed-off | 09/23/2021 | 12/09/2021 | Interior Renovation of Apt 19A on the 19th Floor. No change in Use, egress or occupancy. |
| M00552270 ↗ | 43 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 08/25/2021 | 10/05/2021 | COMBINING CO-OP UNITS (3AB & 3K) ON THE SAME FLOOR (TO COMPLY WITH TPPN 03/97): INTER. RENOV. ONLY: REMOVAL OF GWB, FLR, CLG & WALL FINS. & … |
| M00504034 ↗ | 410 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 06/03/2021 | 07/12/2021 | Interior Renovation of an Existing 5th and 6th Floor Apartment, with Minor mechanical modifications (Replacement of HVAC Unit). No change to… |
| M00256693 ↗ | 631 HUDSON STREET MANHATTAN | Alteration | Signed-off | 11/06/2019 | 01/11/2021 | PLUMBING WORK IN CONJUNCTION WITH JOB NUMBER 123788963. NO CHANGE IN USE EGRESS AND OCCUPANCY. |
| M00347795 ↗ | 1220 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/18/2020 | 11/23/2020 | Relocation & Replacement of Plumbing Fixtures. As per plans filed herewith. No change to occupancy, use or egress. |
| M00219261 ↗ | 92 LAIGHT STREET MANHATTAN | Alteration | Signed-off | 02/04/2020 | 11/04/2020 | PLUMBING WORK IN CONJUNCTION WITH APARTMENT RENOVATION (APT 4i) ON THE 4TH FLOOR, DOB # 123679518. CAP AND REMOVE EXISTING BATHTUB AND REPLA… |
| Q00251047 ↗ | 71-10 BEACH CHANNEL DRIVE QUEENS | Alteration | Signed-off | 10/22/2019 | 12/04/2019 | mh worktype in conjunction w application 421915994 |
| M00196252 ↗ | 65 WORTH STREET MANHATTAN | Alteration | Filed — no permit on record | 08/28/2019 | — | — |
| Name | Jobs together | Most recent |
|---|---|---|
| ELLEN MARTIN ARCHITECT PC | 28 | 06/01/2026 |
| ARCHITECTURE WORK OFFICE PLLC | 14 | 05/22/2025 |
| FLORINELA MURESAN | 5 | 09/09/2024 |
| MEYERS+ ENGINEERS | 2 | 11/21/2022 |
| BO LEE ARCHITECT PC | 1 | 02/04/2020 |
| JO DESIGN | 1 | 05/11/2022 |
| RAYMOND NERENBERG PE | 1 | 03/27/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| WAXTEL LLC | 5 | 06/01/2026 |
| CORE DESIGN & BUILD INC | 4 | 05/22/2025 |
| STRUCTURE TONE, LLC | 4 | 04/19/2024 |
| H&L PRECISE CONSTRUCTION | 3 | 05/11/2022 |
| A & C PLBG & HTG CO., INC | 2 | 05/24/2022 |
| A.T.C. CONTRACTING CORP | 2 | 05/24/2022 |
| BENT MECHANICAL CORP | 2 | 03/06/2023 |
| CROWN PLUMBING INC | 2 | 06/01/2026 |
| PAUL QUINN PLBG & HTG INC | 2 | 02/03/2024 |
| PROCORE MECHANICAL CORP | 2 | 03/27/2024 |
| WHITETAIL CONSTRCUTION IN | 2 | 12/19/2022 |
| AJC PLUMBING & HTG CORP | 1 | 06/18/2020 |
| ALL MAKES HTG & A/C CORP | 1 | 03/27/2024 |
| APOLLO PLBG & HTG INC | 1 | 02/02/2023 |
| ASCO SPRINKLER CO.,INC | 1 | 11/21/2022 |
| AVON PLBG & HTG INC | 1 | 06/14/2024 |
| BEAM ENTERPRISES INC | 1 | 02/07/2025 |
| BMV MECHANICAL CORP | 1 | 11/06/2019 |
| BORIS MECHANICAL INC | 1 | 08/26/2021 |
| CAMBRIDGE HVAC CORP | 1 | 09/09/2024 |
| CITY BUILDING CONSULTANTS | 1 | 12/15/2022 |
| CORE D&B GROUP INC | 1 | 04/24/2025 |
| CPMC INC | 1 | 05/10/2024 |
| CROSSFIELD P & H CORP | 1 | 02/27/2023 |
| DEPENABLE MECHANICAL CORP | 1 | 04/19/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| 5TH MIDTOWN LLC | 5 | 04/19/2024 |
| 11 RIVERSIDE DRIVE CORP. | 2 | 01/16/2024 |
| 320 EAST 57 CORP. | 2 | 07/19/2023 |
| EBRON USA, INC. | 2 | 05/11/2022 |
| HOFFMAN MANAGEMENT | 2 | 02/27/2023 |
| 43 EAST 10TH STREET CORP. | 1 | 08/26/2021 |
| AKAM ASSOCIATES, INC. | 1 | 02/14/2023 |
| EBMG LLC | 1 | 04/16/2024 |
| Empire State Property Management | 1 | 06/01/2026 |
| Fultonex Management | 1 | 06/14/2024 |
| HUDSONCREST PROPERTIES INC. | 1 | 12/13/2022 |
| MAXX PROPERTIES | 1 | 11/22/2021 |
| ORSID REALTY CORP | 1 | 05/02/2025 |
| RUBELLCO | 1 | 12/19/2022 |
| SMILEYS TWO LLC | 1 | 12/15/2022 |
| SOUTH BAY HOLDINGS CORP. | 1 | 02/03/2024 |
| STRATEGIC PERFORMANCE GROUP LLC | 1 | 05/22/2025 |
| c/o SIDNEY RUBELL COMPANY LLC | 1 | 12/19/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| ENKAY DESIGN & CONSULTING, LLC | 15 | 04/16/2024 |
| K & M DOB CONSULTING CORP. | 7 | 05/22/2025 |
| SOL BUILDING CONSULTING SERVICES | 6 | 06/01/2026 |
| METROPOLIS GROUP INC | 5 | 04/19/2024 |
| WILLIAM VITACCO ASSOCIATES | 2 | 06/14/2024 |
| BOYD CONSULTING, INC | 1 | 02/14/2023 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 05/29/2026 | Energy Code Compliance Inspections | 78 8 AVENUE | ELLEN MARTIN | progress |
| 05/28/2026 | Fire-Resistant Penetrations and Joints | 78 8 AVENUE | Texer Nam | special |
| 05/28/2026 | Structural Stability – Alterations of existing buildings | 78 8 AVENUE | MICHAEL BARRY | special |
| 05/28/2026 | Fire-Resistant Penetrations and Joints | 78 8 AVENUE | Texer Nam | special |
| 04/30/2026 | Final | 78 8 AVENUE | ELLEN MARTIN | progress |
| 04/29/2025 | Fenestration areas | 202 MAPLE STREET | ELLEN MARTIN | energy_progress |
| 04/29/2025 | Fenestration air leakage | 202 MAPLE STREET | ELLEN MARTIN | energy_progress |
| 04/29/2025 | Final | 202 MAPLE STREET | ELLEN MARTIN | progress |
| 04/29/2025 | Fenestration and door U-factor and product ratings | 202 MAPLE STREET | ELLEN MARTIN | energy_progress |
| 04/29/2025 | Interior lighting power | 202 MAPLE STREET | ELLEN MARTIN | energy_progress |
| 04/29/2025 | Lighting in dwelling units | 202 MAPLE STREET | ELLEN MARTIN | energy_progress |
| 04/29/2025 | Fire-Resistant Penetrations and Joints | 202 MAPLE STREET | Texer Nam | special |
| 04/16/2025 | Fire-Resistant Penetrations and Joints | 25 CENTRAL PARK WEST | Texer Nam | special |
| 04/16/2025 | Final | 25 CENTRAL PARK WEST | Texer Nam | progress |
| 04/15/2025 | Fire-Resistant Penetrations and Joints | 410 CENTRAL PARK WEST | Texer Nam | special |
| 04/15/2025 | Mechanical Systems | 410 CENTRAL PARK WEST | Texer Nam | special |
| 04/15/2025 | Energy Code Compliance Inspections | 410 CENTRAL PARK WEST | ELLEN MARTIN | progress |
| 04/15/2025 | Final | 410 CENTRAL PARK WEST | ELLEN MARTIN | progress |
| 04/15/2025 | Lighting in dwelling units | 410 CENTRAL PARK WEST | ELLEN MARTIN | energy_progress |
| 04/15/2025 | Lighting controls | 410 CENTRAL PARK WEST | ELLEN MARTIN | energy_progress |
| 10/24/2024 | Fire-Resistant Penetrations and Joints | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |
| 10/24/2024 | Post-installed Anchors | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |
| 10/24/2024 | Fenestration areas | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Interior lighting power | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Fenestration and door U-factor and product ratings | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Metering | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Air barrier - visual inspection | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Lighting controls | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Insulation placement and R values | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Fenestration air leakage | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Maintenance information | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/24/2024 | Fire-Resistance Rated Construction | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | progress |
| 10/24/2024 | Concrete - Cast-In-Place | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |
| 10/24/2024 | Energy Code Compliance Inspections | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | progress |
| 10/17/2024 | Interior lighting power | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Air barrier - visual inspection | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Fenestration air leakage | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Maintenance information | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Lighting controls | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Insulation placement and R values | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Metering | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Fenestration areas | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Fenestration and door U-factor and product ratings | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | energy_progress |
| 10/17/2024 | Fire-Resistance Rated Construction | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | progress |
| 10/17/2024 | Energy Code Compliance Inspections | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | progress |
| 10/17/2024 | Post-installed Anchors | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |
| 10/17/2024 | Fire-Resistant Penetrations and Joints | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |
| 10/17/2024 | Concrete - Cast-In-Place | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |
| 09/11/2024 | Post-installed Anchors | 115-08 ROCKAWAY BEACH BLVD | FLORINELA MURESAN | special |
| 09/11/2024 | Fire-Resistant Penetrations and Joints | 115-08 ROCKAWAY BEACH BLVD | Texer Nam | special |