| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B00591834 ↗ | 78 STREET BROOKLYN | New Building | Permit Issued | 09/15/2021 | 02/17/2026 | SUPPORT OF EXCAVATION PLANS FILED IN CONJUCTION WITH NEW BUILDING |
| B00550841 ↗ | 78 STREET BROOKLYN | New Building | Permit Issued | 07/14/2021 | 12/11/2025 | SUPPORT OF EXCAVATION PLANS FILED INCONJUCTION WITH NEW BUILDING. |
| X00431998 ↗ | 941 INTERVALE AVENUE BRONX | Alteration | Permit Issued | 01/07/2021 | 09/04/2025 | INSTALLATION OF PLUMBING SYSTEM IN CONJUNCTION WITH ALT1 APPLICATION #210180935 |
| Q00460026 ↗ | 56-14 MYRTLE AVENUE QUEENS | Alteration | Signed-off | 01/27/2021 | 07/22/2025 | Modify existing sprinkler system at Cellar and First floor. |
| M00205198 ↗ | 708 3 AVENUE MANHATTAN | Alteration | Signed-off | 11/26/2019 | 04/03/2025 | installation of sprinkler on the cellar, 1st, 5th, 6th, 10th, 13th, 15th, 16th, 17th, 19th, 23rd, 32nd, 33rd, 34th, 37th and 38th floor as i… |
| X00494341 ↗ | 976 TINTON AVENUE BRONX | Alteration | Permit Issued | 04/07/2021 | 03/13/2025 | INSTALLATION OF WATER BASEBOARD HEATING SYSTEM AND ALL ASSOCIATED DUCTS AND PIPING. |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B00591834 ↗ | 78 STREET BROOKLYN | New Building | Permit Issued | 09/15/2021 | 02/17/2026 | SUPPORT OF EXCAVATION PLANS FILED IN CONJUCTION WITH NEW BUILDING |
| B00550841 ↗ | 78 STREET BROOKLYN | New Building | Permit Issued | 07/14/2021 | 12/11/2025 | SUPPORT OF EXCAVATION PLANS FILED INCONJUCTION WITH NEW BUILDING. |
| X00431998 ↗ | 941 INTERVALE AVENUE BRONX | Alteration | Permit Issued | 01/07/2021 | 09/04/2025 | INSTALLATION OF PLUMBING SYSTEM IN CONJUNCTION WITH ALT1 APPLICATION #210180935 |
| Q00460026 ↗ | 56-14 MYRTLE AVENUE QUEENS | Alteration | Signed-off | 01/27/2021 | 07/22/2025 | Modify existing sprinkler system at Cellar and First floor. |
| M00205198 ↗ | 708 3 AVENUE MANHATTAN | Alteration | Signed-off | 11/26/2019 | 04/03/2025 | installation of sprinkler on the cellar, 1st, 5th, 6th, 10th, 13th, 15th, 16th, 17th, 19th, 23rd, 32nd, 33rd, 34th, 37th and 38th floor as i… |
| X00494341 ↗ | 976 TINTON AVENUE BRONX | Alteration | Permit Issued | 04/07/2021 | 03/13/2025 | INSTALLATION OF WATER BASEBOARD HEATING SYSTEM AND ALL ASSOCIATED DUCTS AND PIPING. |
| M00602954 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Permit Issued | 10/22/2021 | 11/14/2024 | Mechanical work on the SC1 and SC2 level and the 1st and 2nd floor as indicated on drawings |
| M00602926 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Permit Issued | 10/18/2021 | 11/13/2024 | Architectural work on the SC1 and the SC2 level and the 1st and 2nd floor as indicated on drawings |
| S00335108 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/19/2020 | 10/11/2024 | INSTALLATION OF GAS PIPING AND FIXTURES AS INDICATED ON PLANS |
| M00438681 ↗ | 29 EAST 11 STREET MANHATTAN | Alteration | Signed-off | 04/20/2021 | 07/30/2024 | PLUMBING APPLICATION IN CONJUCTION WITH ALT-1 APPLICATION 140940551. |
| X00443411 ↗ | 976 TINTON AVENUE BRONX | Alteration | Signed-off | 01/07/2021 | 06/18/2024 | INSTALLATION OF PLUMBING AND SPRINKLER SYSTEM IN CONJUNCTION WITH ALT1 APPLICATION #210180926. |
| M00438692 ↗ | 29 EAST 11 STREET MANHATTAN | Alteration | Signed-off | 04/20/2021 | 04/04/2024 | SPRINKLER FILING FOR ALL FLOORS, CEL, BAS, 001-004. IN CONJUNCTION WITH ALT-1 140940551. |
| M00438687 ↗ | 29 EAST 11 STREET MANHATTAN | Alteration | Signed-off | 04/20/2021 | 01/23/2024 | MECHANICAL WORK IN CONJUNCTION WITH ALT-1 140940551. |
| B00495212 ↗ | 57 MARCUS GARVEY BLVD BROOKLYN | New Building | Permit Issued | 04/07/2021 | 11/08/2023 | Structural work associated with the construction of the new building |
| S00297285 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 01/16/2020 | 10/11/2023 | INSTALLATION OF CO GENERATOR SYSTEM. |
| S00323444 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/05/2020 | 10/11/2023 | STRUCTURAL/FOUNDATION WORK AS INDICATED ON PLANS FOR CO GEN BUILDING |
| X00439220 ↗ | 941 INTERVALE AVENUE BRONX | Alteration | Permit Issued | 01/07/2021 | 10/10/2023 | INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEMS IN CONJUNCTION WITH ALT1 APPLICATION #210180935. |
| X00334066 ↗ | 750 EAST 179 STREET BRONX | Alteration | Permit Issued | 05/05/2020 | 09/12/2023 | INSTALLATION OF 2 GAS BOILERS AT FIRST FLOOR WITH ASSOCIATED MECHANICAL PIPING.. NO CHANGE IN USE EGRESS, OR OCCUPANCY UNDER THIS FILING. |
| M00392676 ↗ | 452 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 01/20/2021 | 08/21/2023 | THIS APPLICATION IS FILED FOR PROPOSED SPRINKLER SYSTEM FOR PARTIAL CEL, 001,002 FLOORS AS PER SUBMITTED PLANS. |
| M00520241 ↗ | 170 EAST 123 STREET MANHATTAN | Alteration | Permit Issued | 05/12/2021 | 08/18/2023 | Installation of new sprinkler system in conjunction with Alt. CO application M00516492-I1 |
| M00516492 ↗ | 170 EAST 123 STREET MANHATTAN | Alteration CO | Permit Issued | 05/12/2021 | 08/14/2023 | THIS ALTERATION TYPE I APPLICATION IS BEING FILED FOR THE RENOVATION AND CHANGE OF USE FROM THE STORAGE TO CHURCH AND HOMELESS SHELTER. |
| M00433835 ↗ | 11 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 04/05/2021 | 07/06/2023 | Mechanical changes on the 9th Floor, 9th Floor Mezz, Penthouse, & Roof as indicated on drawings. Related work filed under M00433854, M004338… |
| M00472146 ↗ | 11 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 03/29/2021 | 05/30/2023 | Architectural changes on the 9th Floor, 9th Floor Mezz, & Penthouse as indicated on drawings. Related applications filed under DOBNOW# M0043… |
| M00532918 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/16/2021 | 04/19/2023 | Sprinkler work on part of the 18th floor and 16th floor (Marshall Wace) as indicated on drawings. |
| M00557837 ↗ | 708 3 AVENUE MANHATTAN | Alteration | Permit Issued | 07/29/2021 | 04/14/2023 | Interior demolition of non load bearing partitions on the 1st floor as indicated on drawings. |
| M00554905 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2021 | 04/05/2023 | Minor architectural work on parts of 8th and 9th floors including roof terraces. |
| M00404987 ↗ | 11 WEST 67 STREET MANHATTAN | Alteration | Signed-off | 10/26/2020 | 03/22/2023 | Interior structural removal of part of 9th Floor Mezzanine slab, removal of stair and installation of new stair from 9th Floor to 9th Floor … |
| M00348323 ↗ | 170 EAST 123 STREET MANHATTAN | Alteration | Signed-off | 05/11/2020 | 03/16/2023 | Installation of new gas service for hot water heating and rooftop units, installation of new sprinkler service, installation of new domestic… |
| X00830054 ↗ | 503 WEST 259 STREET BRONX | Alteration | Signed-off | 02/22/2023 | 03/01/2023 | INSTALLING BATHROOMS FIXTURES AT 3RD FL AND RE ROUTING EXISTING GAS LINE TO 4TH FL ROOF TO HVAC UNITS(FILED AND APPROVED UNDER ALT#220652791… |
| X00302692 ↗ | 730 OAKLAND PLACE BRONX | Alteration | Permit Issued | 05/05/2020 | 02/09/2023 | INSTALLATION OF 2 GAS BOILERS AT FIRST FLOOR WITH ASSOCIATED MECHANICAL PIPING.. NO CHANGE IN USE EGRESS, OR OCCUPANCY UNDER THIS FILING. |
| X00432014 ↗ | 941 INTERVALE AVENUE BRONX | Alteration | Signed-off | 01/07/2021 | 02/09/2023 | INSTALLATION OF (2) NEW BOILERS AT CELLAR FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION. |
| X00317066 ↗ | 730 OAKLAND PLACE BRONX | Alteration | Permit Issued | 05/05/2020 | 01/30/2023 | INSTALLATION OF GAS PIPING FOR NEW BOILERS, FILED ON SEPARATE APPLICATION AND DOMESTIC HW STORAGE TANKS.NO CHANGE IN USE, EGRESS OR OCCUPANC… |
| X00335826 ↗ | 740 EAST 178 STREET BRONX | Alteration | Signed-off | 05/05/2020 | 01/20/2023 | SUBSEQUENT FILING TO ADD ADDITIONAL BOILER DEVICE NUMBER THAT WAS LEFT OFF OF INITIAL FILING. ALL COSTS WERE PART OF INITIAL FILING. |
| M00554930 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 11/29/2021 | 12/24/2022 | Minor structural work on parts of 8th and 9th floors. |
| B00266432 ↗ | 4915 10 AVENUE BROOKLYN | Alteration | Signed-off | 12/02/2019 | 11/21/2022 | INSTALLATION OF COGENERATION SYSTEM, INSTALLATION OF (2) NEW GAS FIRED COGEN RECIP, GAS PIPING INSTALLATIONS. NO CHANGE IN USE, EGRESS OR OC… |
| M00554944 ↗ | 330 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 11/24/2021 | 11/16/2022 | Minor mechanical work on parts of 8th and 9th floors. |
| B00540916 ↗ | 55 POPLAR STREET BROOKLYN | Alteration | Signed-off | 07/01/2021 | 09/29/2022 | MECHANICAL WORK ON APT 4FAS PER PLANS FILED HEREWITH. REALTED TO GC APPLICATION B00534554. |
| M00576434 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/13/2021 | 08/29/2022 | Sprinkler work on part of 43rd floor (QVT) as indicated on drawings. |
| B00355209 ↗ | 540 FULTON STREET BROOKLYN | Alteration | Permit Issued | 06/18/2020 | 08/24/2022 | Modification to existing vault as per plans filed herewith. Filed in connection with NB#321185828. |
| M00496195 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 04/16/2021 | 07/25/2022 | construction work on the 11th and 12th floor (Ferguson) as indicated on drawings |
| M00496209 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 04/16/2021 | 07/25/2022 | Mechanical work on the 11th and 12th floor (Ferguson) as indicated on drawings. |
| M00564598 ↗ | 770 BROADWAY MANHATTAN | Alteration | Signed-off | 08/19/2021 | 07/15/2022 | Sprinkler demolition and installation of temporary sprinkler protection on parts of cellar and 1st floor. |
| M00527005 ↗ | 1498 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/01/2021 | 07/05/2022 | removal and disposal of 1 res gas cook equip, 1res sink, and 1 bathtub cap all piping at 3rd floor, Install 1 washing machine and 1 laundry … |
| M00603847 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 10/29/2021 | 06/29/2022 | General construction on the 1st floor and mezzanine (Capital One) as indicated on drawings |
| M00603895 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/08/2021 | 06/29/2022 | Mechanical work on the mezzanine level and 1st floor (Capital One) as indicated on drawings |
| M00604213 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/03/2021 | 06/29/2022 | Structural work on the mezzanine level and 1st floor (Capital One) as indicated on drawings |
| M00496070 ↗ | 770 BROADWAY MANHATTAN | Alteration | Signed-off | 05/25/2021 | 06/21/2022 | Mechanical work associated with the replacement of chiller in the sub-cellar as indicated on drawings. |
| M00479066 ↗ | 708 3 AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2021 | 06/08/2022 | Architectural changes as indicated on drawings |
| Q00365370 ↗ | 1-34 BEACH 133 STREET QUEENS | Alteration | Signed-off | 07/10/2020 | 06/07/2022 | Install sprinkler system in 3 story One Family Dwelling in conjunction with ALT I Application # 421462269 |
| Q00604676 ↗ | 36-01 47 AVENUE QUEENS | Alteration | Signed-off | 05/24/2022 | 06/02/2022 | Mechanical work on the 1st floor and roof (Door Dash) as indicated on drawings |
| M00598657 ↗ | 194 WEST 4 STREET MANHATTAN | Alteration | Signed-off | 11/16/2021 | 05/03/2022 | Filing minor renovation to bathroom and kitchen fixtures at apartment 7E as per plans uploaded. No Change in use, egress,or occupancy under… |
| M00368929 ↗ | 55 WEST 8 STREET MANHATTAN | Alteration | Signed-off | 07/15/2020 | 05/02/2022 | relocate gas meters at hallways to cellar and install new gas risers at cellar through 6th floor indicated on drawings filed herewith. No ch… |
| M00600173 ↗ | 888 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/26/2021 | 04/11/2022 | Architectural work on part of28th floor (Joho) as indicated on drawings. |
| Q00461322 ↗ | 56-14 MYRTLE AVENUE QUEENS | Alteration | Signed-off | 01/28/2021 | 03/22/2022 | Interior and exterior renovation for existing retail store. |
| S00576514 ↗ | 1200 SOUTH AVENUE STATEN ISLAND | Alteration | Signed-off | 08/26/2021 | 03/17/2022 | Structural work on the 1st floor (UFT) as indicated on drawings |
| M00494422 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 09/15/2021 | 03/10/2022 | Sprinkler work on the 18th and 19th floor (Moroccan Consulate) as indicated on drawings. |
| M00564586 ↗ | 770 BROADWAY MANHATTAN | Alteration | Signed-off | 08/19/2021 | 03/10/2022 | Interior demolition of nonloadbearing partitions and related work on parts of cellar, 1st and 2nd floors. |
| M00564590 ↗ | 770 BROADWAY MANHATTAN | Alteration | Signed-off | 08/19/2021 | 03/10/2022 | Interior mechanical demolition on parts of cellar and 1st floor. |
| M00603906 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/08/2021 | 02/18/2022 | Sprinkler work on the mezzanine level and 1st floor (Capital One) as indicated on drawings |
| M00345433 ↗ | 304 EAST 44 STREET MANHATTAN | Alteration | Signed-off | 06/03/2020 | 02/17/2022 | Modification to existing sprinkler system to accommodate architectural work on the 6th floor. No change to use, egress or occupancy under th… |
| B00641563 ↗ | 193 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 01/06/2022 | 02/09/2022 | STRUCTURAL FILING, IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION B00641547-I1 TO COMPLY AND REMOVE ECB VIOLATION 35135868K ISSUED FOR… |
| M00517417 ↗ | 14 HENDERSON PLACE MANHATTAN | Alteration | Signed-off | 05/27/2021 | 02/08/2022 | Additions & modifications to existing HVAC system and related piping. Related applications filed under GC#M00517399-I1 & PL#M00517429-I1. No… |
| M00412431 ↗ | 340 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 01/20/2021 | 02/03/2022 | Plumbing work type filed in conjunction with ALT-2 for general renovation of ext'g apartment 9-N, no changes in use, egress or occupancy |
| X00334097 ↗ | 750 EAST 179 STREET BRONX | Alteration | Permit Issued | 05/05/2020 | 02/03/2022 | INSTALLATION OF GAS PIPING FOR NEW BOILERS, FILED ON SEPARATE APPLICATION AND DOMESTIC HW STORAGE TANKS.NO CHANGE IN USE, EGRESS OR OCCUPANC… |
| M00494396 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 09/15/2021 | 02/01/2022 | Mechanical work on the 18th and 19th floor (Moroccan Consulate) as indicated on drawings |
| S00289678 ↗ | 274 DAVIS AVENUE STATEN ISLAND | Alteration | Signed-off | 01/08/2020 | 01/25/2022 | Install, replace and relocate plumbing fixtures at cellar, 1st and 2nd floors |
| M00387908 ↗ | 90 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 12/17/2020 | 01/21/2022 | Modification to existing Mechanical System as shown on plans filed herewith at apartment 8A on the 8th floor. No change in use, egress or oc… |
| M00517399 ↗ | 14 HENDERSON PLACE MANHATTAN | Alteration | Signed-off | 05/27/2021 | 01/21/2022 | Interior renovation and non-structural demolition as shown on plans. Related MEP applications filed under MS #M00517417-I1 & PL#M00517429-I1… |
| M00620242 ↗ | 393 7 AVENUE MANHATTAN | Alteration | Signed-off | 01/04/2022 | 01/20/2022 | Sprinkler work on the 2nd and 18th floor (AMC) as indicated on drawings |
| M00620216 ↗ | 393 7 AVENUE MANHATTAN | Alteration | Signed-off | 01/11/2022 | 01/12/2022 | Mechanical work on the 2nd and 18th floor (AMC) as indicated on drawings |
| M00620189 ↗ | 393 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/22/2021 | 01/04/2022 | Architectural work on the 2nd and 18th floor (AMC) as indicated on drawings. EN lighting drawings will be submitted under M00 620 216-I1 |
| M00201520 ↗ | 355 WEST 41 STREET MANHATTAN | Alteration | Signed-off | 08/07/2019 | 12/31/2021 | Install steel beams and channels at cellar and 1st floor to shore up floors 1st and 2nd floors Install steel shoring posts up from cellar th… |
| M00607818 ↗ | 7 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 11/04/2021 | 12/28/2021 | Sprinkler work on the 44th floor tenant (43rd floor C.O.) as indicated on drawings |
| M00343792 ↗ | 304 EAST 44 STREET MANHATTAN | Alteration | Signed-off | 06/03/2020 | 12/20/2021 | HVAC system associated with 6th floor renovation. No change to use, egress, or occupancy. |
| M00532473 ↗ | 350 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/16/2021 | 12/10/2021 | Architectural work on part of the 18th and 16th floor (Marshall Wace) as indicated on drawings |
| M00605509 ↗ | 640 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/29/2021 | 12/06/2021 | Sprinkler work on the 8th floor (Turnkey-Prospect Park/VNO office) as indicated on drawings |
| M00605445 ↗ | 640 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/24/2021 | 11/30/2021 | General construction on the 8th floor (turnkey-Prospect RIdge/VNO office) as indicated on drawings |
| M00605458 ↗ | 640 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/29/2021 | 11/30/2021 | Mechanical work on the 8th floor (Turnkey-Prospect Ridge/VNO office) as indicated on drawings |
| M00422568 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 01/07/2021 | 11/22/2021 | Sprinkler alterations on the 1st through 26th floors and cellar level; related work as per plans. |
| M00589910 ↗ | 3924 BROADWAY MANHATTAN | Alteration | Signed-off | 09/16/2021 | 11/19/2021 | foundation work for commercial space enlargement |
| S00364645 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Signed-off | 07/06/2020 | 11/17/2021 | MODIFY AN AUTOMATIC SPRINKLER SYSTEM AS INDICATED ON PLANS. THIS IS A VOLUNATRY SYSTEM AND NOT REQUIRED BY CODE. NO CHANGE IN USE EGRESS O… |
| M00543419 ↗ | 608 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/11/2021 | 11/16/2021 | Sprinkler changes on the 8th floor (suite 808) as indicated on drawings. |
| M00589228 ↗ | 90 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2021 | 11/16/2021 | Sprinkler wok on part of the 24th floor as indicated on drawings. |
| M00601536 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2021 | 11/15/2021 | Sprinkler work on the basement level (Stefano Ricci-LL storage project) as indicated on drawings |
| M00608745 ↗ | 7 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 11/04/2021 | 11/15/2021 | Structural work on the 44th floor tenant (43rd floor C.O.) as indicated on drawings. |
| M00532799 ↗ | 1290 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/08/2021 | 11/10/2021 | Sprinkler work on the cellar, 11th, 13th, 17th, 20th floor (LL26) as indicated on drawings |
| B00627648 ↗ | 732 39 STREET BROOKLYN | Alteration | Filed — no permit on record | 11/09/2021 | — | — |
| M00520066 ↗ | 983 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/22/2021 | 11/09/2021 | FILING HEREWITH FOR THE INSTALLATION OF HEATING , AIR CONDITININGAND VENTILATION SYSTEMS |
| M00607746 ↗ | 7 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 11/04/2021 | 11/09/2021 | Mechanical work on the 44th floor tenant (43rd floor C.O.) as indicated on drawings |
| X00603916 ↗ | 1409 METROPOLITAN OVAL BRONX | Alteration | Signed-off | 10/20/2021 | 11/09/2021 | FILING FOR THE INSTALLATION OF NEW ROOF TOP DUNNAGE RELATED TO THE INSTALLATION PROPOSED ROOFTOP REFRIGERATION UNITS AS SHOWN ON PLANS SUBMI… |
| M00447457 ↗ | 983 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/07/2021 | 11/08/2021 | FILING HEREWITH FOR THE INTERIOR RENOVATION OF APARTMENT 3D. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00476616 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/02/2021 | 11/05/2021 | Mechanical work on the 20th through 40th floors for interior mechanical riser work as indicated on drawings |
| M00476636 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/02/2021 | 11/05/2021 | Structural work on the 21st -37th & 39th floors for interior mechanical riser work as indicated on drawings. |
| M00613179 ↗ | 150 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/03/2021 | 11/05/2021 | Sprinkler work on the mezzanine, 2nd thru 32nd floor, 35th thru 39th floors and the roof (LL26/04) as indicated on drawings |
| M00607724 ↗ | 7 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 11/02/2021 | 11/04/2021 | Architectural work on the 44th floor tenant (43rd floor C.O.) as indicated on drawings |
| M00203256 ↗ | 237 EAST 31 STREET MANHATTAN | Alteration | Signed-off | 10/21/2019 | 11/03/2021 | SUBSEQUENT DOCUMENT FOR MECHANICAL WORK IN CONJUNCTION WITH ALTERATION 2 APPLICATION#123777582 |
| M00476600 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/29/2021 | 11/01/2021 | Construction work on the 20th through 40th floors for interior mechanical riser work as indicated on drawings |
| M00494374 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/18/2021 | 11/01/2021 | Construction work on the 18th and 19th floor (Moroccan Consulate) as indicated on drawings |
| M00556961 ↗ | 510 WEST 22ND STREET MANHATTAN | Alteration | Signed-off | 09/27/2021 | 10/28/2021 | Sprinkler work on 7th floor as indicated on drawings. |
| M00594195 ↗ | 123 EAST 70 STREET MANHATTAN | Alteration | Signed-off | 10/21/2021 | 10/28/2021 | Sprinkler changes in cellar as indicated on drawings. |
| Name | Jobs together | Most recent |
|---|---|---|
| GOLDMAN COPELAND ASSOCIATES | 77 | 03/22/2024 |
| BECKER ENGINEERING, P.C. | 58 | 06/02/2023 |
| M JUST ARCHITECTURE PC | 23 | 05/06/2026 |
| ROBERT DERECTOR ASSOCIATES | 21 | 03/28/2023 |
| MG ENGINEERING D.P.C. | 16 | 06/30/2026 |
| STEVEN PAUL HAMMER | 13 | 09/22/2022 |
| SEVERUD ASSOCIATES | 12 | 06/10/2022 |
| AMA CONSULTING ENGINEERS, PC | 9 | 05/22/2023 |
| CARL GUINTA ASSOCIATES | 7 | 04/19/2022 |
| WSP | 7 | 10/19/2021 |
| JOHN D CALCAGNILE ARCHITECT | 5 | 04/06/2022 |
| RANDALL P. COLLINS ARCHITECT, PC | 5 | 02/09/2022 |
| Spectorgroup Architecture LLP | 5 | 03/31/2022 |
| GILSANZ MURRAY STEFICEK LLP | 4 | 01/23/2023 |
| JACK GREEN ASSOCIATES | 4 | 02/19/2021 |
| OCV ARCHITECTS | 4 | 08/01/2025 |
| SPG ARCHITECTS, LLP | 4 | 09/12/2022 |
| ABS ENGINEERING, PLLC | 3 | 08/06/2024 |
| FOGARTY FINGER ARCHITECTURE PLLC | 3 | 12/13/2022 |
| MSP ENGINEERING INC. P.C. | 3 | 03/10/2023 |
| TPG ARCHITECTURE, LLP | 3 | 11/24/2021 |
| AK ENGINEERING, PC | 2 | 06/01/2022 |
| ASDA ARCHITECTURE + DESIGN | 2 | 07/13/2021 |
| BICALURO ASSOCIATES PC | 2 | 06/03/2020 |
| BRICOLAGE DESIGNS | 2 | 03/20/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| SIRINA FIRE PROT CORP | 28 | 11/15/2022 |
| SKYLINE FIRE SPRINKLER CO | 22 | 06/20/2022 |
| CLUNE CONSTRUCTION CO LP | 15 | 12/13/2022 |
| AMBASSADOR CONSTRUCTION C | 14 | 04/05/2022 |
| JOHN GALLIN & SON, INC | 14 | 09/22/2022 |
| JRM CONSTRUCTION MGMT LLC | 14 | 07/07/2022 |
| PAR FIRE PROTECTION LLC | 10 | 08/22/2022 |
| ABCO-PEERLESS SPRKLR CORP | 9 | 06/01/2022 |
| AEGIS ENERGY SERVICES LLC | 9 | 06/15/2022 |
| PHASE 3 INTERIORS LLC | 9 | 07/14/2021 |
| PAR PLUMBING CO., INC | 7 | 12/06/2022 |
| TRI-STAR CONSTRUCTION COR | 7 | 05/22/2023 |
| STRUCTURE TONE, LLC | 6 | 01/23/2023 |
| ENOBRAC PLUMBING, INC | 5 | 05/18/2022 |
| UNITY CONSTRUCTION GROUP | 5 | 10/18/2023 |
| AUSTIN PLBG & HTG CO.INC | 4 | 12/06/2022 |
| D REIS CONTRACTING CORP | 4 | 11/16/2023 |
| JT MAGEN & COMPANY INC | 4 | 02/22/2022 |
| L&K PARTNERS, INC | 4 | 03/28/2023 |
| V B CONSTRUCTION LLC | 4 | 03/10/2023 |
| ALLSTATE SPRINKLER CORP | 3 | 07/08/2020 |
| BIG APPLE SEWER & DRAIN I | 3 | 10/08/2021 |
| E.M.P. FIRE SPRINKLER LLC | 3 | 07/08/2025 |
| ELJIN CONSTRUC OF NEW YOR | 3 | 09/12/2022 |
| ESSENTIAL DESIGN + BUILD | 3 | 01/24/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| VORNADO REALTY TRUST | 135 | 03/22/2024 |
| KATO KAGAKU CO LTC | 12 | 10/18/2023 |
| MARX REALTY | 10 | 06/30/2026 |
| 31 CAPITAL LLC | 5 | 06/01/2022 |
| LEVY PROPERTIES | 5 | 05/06/2026 |
| IVY REALTY | 4 | 10/15/2020 |
| WITHERS BERGMAN, LLP (THE DES ARTIS | 4 | 11/16/2023 |
| 608 COMPANY, LLC | 3 | 06/21/2021 |
| CBRE | 3 | 02/25/2022 |
| CENTERS HEALTH CARE | 3 | 06/02/2023 |
| HARBOR GROUP MANAGEMENT | 3 | 09/20/2022 |
| ORPHEUS MANAGEMENT CORP. | 3 | 12/17/2021 |
| TRINITY HUDSON HOLDINGS | 3 | 03/17/2022 |
| ATCO PROPERTIES & MGMT | 2 | 01/24/2024 |
| CHRYSEDA ASSOCIATES | 2 | 03/20/2026 |
| CLEARROCK PROPERTIES LLC | 2 | 11/22/2019 |
| FSI | 2 | 07/27/2023 |
| ISJ MANAGEMENT CORP. | 2 | 10/25/2021 |
| JAMESTOWN LP | 2 | 07/16/2020 |
| KOEPPEL ROSEN LLC | 2 | 02/19/2021 |
| RXR REALTY | 2 | 02/03/2020 |
| RYBAK DEVELOPMENT CORP | 2 | 06/08/2021 |
| SAPOL CONSTRUCTION LLC | 2 | 03/20/2026 |
| SAR ACADEMY ORGANIZATION | 2 | 05/01/2023 |
| UNION PLAZA REALTY LP | 2 | 06/24/2020 |
| Name | Jobs together | Most recent |
|---|---|---|
| ARCHETYPE CONSULTANTS, INC. | 107 | 03/22/2024 |
| JUST ARCHITECTURE | 10 | 05/06/2026 |
| DOMANI CONSULTING | 3 | 03/20/2026 |
| GRAND EXPEDITERS NYC | 3 | 07/11/2022 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 09/24/2021 |
| ADVANCED BUILDERS SERVICES | 2 | 09/14/2023 |
| AEC CONSULTING & EXPEDITING, INC | 2 | 09/05/2023 |
| BRICOLAGE DESIGNS | 2 | 03/20/2026 |
| CONVERSANO ASSOCIATES, INC. | 2 | 11/08/2022 |
| WILLIAM VITACCO ASSOCIATES | 2 | 09/12/2022 |
| GREEN LIGHT EXPEDITING LLC | 1 | 11/16/2021 |
| JAM CONSULTANTS, INC. | 1 | 08/19/2021 |
| LEWSAN CONSULTANTS | 1 | 01/25/2022 |
| LGML GROUP | 1 | 09/14/2023 |
| OCV ARCHITECTS | 1 | 08/01/2025 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/01/2026 | Fire-Resistant Penetrations and Joints | 708 3 AVENUE | Ryan Hansen | special |
| 07/01/2026 | Sprinkler Systems | 708 3 AVENUE | Ryan Hansen | special |
| 07/15/2025 | Fire-Resistant Penetrations and Joints | 976 TINTON AVENUE | John Becker | special |
| 07/15/2025 | Sprinkler Systems | 976 TINTON AVENUE | John Becker | special |
| 07/15/2025 | Fire-Resistance Rated Construction | 976 TINTON AVENUE | John Becker | progress |
| 03/26/2025 | Sprinkler Systems | 708 3 AVENUE | John Becker | special |
| 03/26/2025 | Fire-Resistant Penetrations and Joints | 708 3 AVENUE | John Becker | special |
| 02/07/2025 | Fire-Resistant Penetrations and Joints | 170 EAST 123 STREET | John Becker | special |
| 02/07/2025 | Fire-Resistance Rated Construction | 170 EAST 123 STREET | John Becker | progress |
| 02/07/2025 | Energy Code Compliance Inspections | 170 EAST 123 STREET | John Becker | progress |
| 02/07/2025 | Fenestration air leakage | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/07/2025 | Insulation placement and R values | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/07/2025 | Air barrier — testing | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/07/2025 | Air barrier - visual inspection | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/07/2025 | Fenestration and door U-factor and product ratings | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/07/2025 | Fenestration areas | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Insulation placement and R values | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Air barrier - visual inspection | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Air barrier — testing | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Fenestration areas | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Fenestration and door U-factor and product ratings | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Fenestration air leakage | 170 EAST 123 STREET | John Becker | energy_progress |
| 02/04/2025 | Fire-Resistance Rated Construction | 170 EAST 123 STREET | John Becker | progress |
| 02/04/2025 | Energy Code Compliance Inspections | 170 EAST 123 STREET | John Becker | progress |
| 02/04/2025 | Fire-Resistant Penetrations and Joints | 170 EAST 123 STREET | John Becker | special |
| 01/06/2025 | Fire-Resistant Penetrations and Joints | 976 TINTON AVENUE | John Becker | special |
| 01/06/2025 | Sprinkler Systems | 976 TINTON AVENUE | John Becker | special |
| 01/06/2025 | Fire-Resistance Rated Construction | 976 TINTON AVENUE | John Becker | progress |
| 12/24/2024 | Fenestration and door U-factor and product ratings | 170 EAST 123 STREET | John Becker | energy_progress |
| 12/24/2024 | Fenestration air leakage | 170 EAST 123 STREET | John Becker | energy_progress |
| 12/24/2024 | Insulation placement and R values | 170 EAST 123 STREET | John Becker | energy_progress |
| 12/24/2024 | Fenestration areas | 170 EAST 123 STREET | John Becker | energy_progress |
| 12/24/2024 | Air barrier - visual inspection | 170 EAST 123 STREET | John Becker | energy_progress |
| 12/24/2024 | Air barrier — testing | 170 EAST 123 STREET | John Becker | energy_progress |
| 12/24/2024 | Fire-Resistance Rated Construction | 170 EAST 123 STREET | John Becker | progress |
| 12/24/2024 | Energy Code Compliance Inspections | 170 EAST 123 STREET | John Becker | progress |
| 12/24/2024 | Fire-Resistant Penetrations and Joints | 170 EAST 123 STREET | John Becker | special |
| 11/13/2024 | Air barrier — testing | 170 EAST 123 STREET | John Becker | energy_progress |
| 11/13/2024 | Fenestration areas | 170 EAST 123 STREET | John Becker | energy_progress |
| 11/13/2024 | Insulation placement and R values | 170 EAST 123 STREET | John Becker | energy_progress |
| 11/13/2024 | Fenestration and door U-factor and product ratings | 170 EAST 123 STREET | John Becker | energy_progress |
| 11/13/2024 | Air barrier - visual inspection | 170 EAST 123 STREET | John Becker | energy_progress |
| 11/13/2024 | Fenestration air leakage | 170 EAST 123 STREET | John Becker | energy_progress |
| 11/13/2024 | Fire-Resistance Rated Construction | 170 EAST 123 STREET | John Becker | progress |
| 11/13/2024 | Energy Code Compliance Inspections | 170 EAST 123 STREET | John Becker | progress |
| 11/13/2024 | Fire-Resistant Penetrations and Joints | 170 EAST 123 STREET | John Becker | special |
| 11/06/2024 | HVAC insulation and sealing | 941 INTERVALE AVENUE | John Becker | energy_progress |
| 11/06/2024 | Maintenance information | 941 INTERVALE AVENUE | John Becker | energy_progress |
| 11/06/2024 | Electrical motors | 941 INTERVALE AVENUE | John Becker | energy_progress |
| 11/06/2024 | HVAC and service water heating system controls | 941 INTERVALE AVENUE | John Becker | energy_progress |