← Back
Special Inspection Agency
BROADWAY INSPECTIONS
Special Inspection Agency
30 jobs with open permitsMANHATTAN · 37BRONX · 4BROOKLYN · 3
33 buildings
67
Total Filings
47
Jobs on File
33
Buildings Worked
30
Jobs w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Jobs by first filing month47 jobs all-time
0246Nov '20 · 1Feb '22 · 1Oct '22 · 1Feb '23 · 1Mar '23 · 1Jun '23 · 1Jan '24 · 1Feb '24 · 1Jun '24 · 1Feb '25 · 1Mar '25 · 5Apr '25 · 1Jun '25 · 4Aug '25 · 1Sep '25 · 1Oct '25 · 3Nov '25 · 2Jan '26 · 2Feb '26 · 5Mar '26 · 2Apr '26 · 1May '26 · 4Jun '26 · 3Jul '26 · 1Aug '26 · 1Sep '26 · 1202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit3064%
Signed off1430%
Filed only36%
By job type
Alteration46
Alteration CO1
Most active buildings
All buildings →
45 WEST 44 STREETMANHATTAN · 4 open · latest 04/14/2026
6 jobs
145 CENTRAL PARK WESTMANHATTAN · 5 open · latest 09/08/2026
5 jobs
99 PARK AVENUEMANHATTAN · 4 open · latest 06/17/2026
4 jobs
126 WEST 126 STREETMANHATTAN · latest 01/15/2026
2 jobs
2935 VETERANS ROAD WESTSTATEN ISLAND · latest 12/30/2025
2 jobs
48 BEACH STREETMANHATTAN · 1 open · latest 07/22/2026
1 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
M01303920 ↗404 EAST 66 STREET
MANHATTAN
AlterationSigned-off11/05/202509/29/2026No change to use, occupancy, or egress. Renovate existing bathroom. Replace interior wall and floor finishes. Install waterproofing. Refra…
M01428025 ↗377 GREENWICH STREET
MANHATTAN
AlterationPermit Issued07/31/202609/22/2026Herewith filing for boiler replacement as shown on plans filed. No change in use, egress, or occupancy under this application
M01440639 ↗888 7 AVENUE
MANHATTAN
AlterationPermit Issued09/09/202609/22/2026RELOCATION OF (1) EXISTING SPRINKLER HEAD IN IT ROOM ON 30TH FL AS PER PLANS
M01415888 ↗39 BEDFORD STREET
MANHATTAN
AlterationPermit Issued06/12/202609/14/2026PROPOSED PLUMBING WORK IN CONNECTION WITH THE RENOVATION OF APARTMENT 4S (4th FLOOR), AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS O…
M01191101 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202509/08/2026Interior renov. apt 12E, 11EE on 11th, 12th flrs. Combin. of apts 12E & 11EE via conv. stair to include new stair. Related apps M01191335, M…
M01191238 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202509/08/2026This alteration application is being filed for the exterior work on 11th & 12th floors. New thru wall outdoor air intake and condensing unit…
Counts cover all 47 jobs (47 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
47 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 47Open permit 30Signed off 14Filed only 3
Any typeAlteration 46Alteration CO 1
47 jobs
JobAddressTypeStatusFiledLatest permitDescription
M01303920 ↗404 EAST 66 STREET
MANHATTAN
AlterationSigned-off11/05/202509/29/2026No change to use, occupancy, or egress. Renovate existing bathroom. Replace interior wall and floor finishes. Install waterproofing. Refra…
M01428025 ↗377 GREENWICH STREET
MANHATTAN
AlterationPermit Issued07/31/202609/22/2026Herewith filing for boiler replacement as shown on plans filed. No change in use, egress, or occupancy under this application
M01440639 ↗888 7 AVENUE
MANHATTAN
AlterationPermit Issued09/09/202609/22/2026RELOCATION OF (1) EXISTING SPRINKLER HEAD IN IT ROOM ON 30TH FL AS PER PLANS
M01415888 ↗39 BEDFORD STREET
MANHATTAN
AlterationPermit Issued06/12/202609/14/2026PROPOSED PLUMBING WORK IN CONNECTION WITH THE RENOVATION OF APARTMENT 4S (4th FLOOR), AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS O…
M01191101 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202509/08/2026Interior renov. apt 12E, 11EE on 11th, 12th flrs. Combin. of apts 12E & 11EE via conv. stair to include new stair. Related apps M01191335, M…
M01191238 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202509/08/2026This alteration application is being filed for the exterior work on 11th & 12th floors. New thru wall outdoor air intake and condensing unit…
M01191314 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202508/31/2026Filing herewith plumbing work for the renovation of apts 11EE & 12E at the address noted. In conjunction with GC application #'s M00191101, …
B01402699 ↗128 5 AVENUE
BROOKLYN
AlterationPermit Issued05/29/202608/20/2026SP HEADS FILED IN CONJUNCTION WITH GC/MH AND PL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01416730 ↗422 2 AVENUE
MANHATTAN
AlterationPermit Issued06/25/202608/20/2026INTERIOR RENOVATION OF EXISTING DWELLING UNIT APT 3T ON THE 3RD FLOOR, WITH NEW PARTITIONS, MILLWORK, FIXTURES AND OTHER INTERIOR FINISHES. …
M01419433 ↗32 WEST 95 STREET
MANHATTAN
AlterationPermit Issued08/03/202608/07/2026Herewith filing for interior renovation of multi family home. No Change in Use, Egress of occupancy. Subsequent Plumbing and Mechanical work…
M01381068 ↗48 BEACH STREET
MANHATTAN
AlterationPermit Issued05/29/202607/22/2026INSTALLATION OF NEW SPLIT SYSTEM AIR COOLED HVAC UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01382574 ↗360 MADISON AVENUE
MANHATTAN
AlterationPermit Issued04/28/202607/22/2026REMOVE AND INSTALL HVAC EQUIPMENT, A/C UNITS, DUCTWORK AND PIPING IN 15TH & 16TH FLOOR OFFICE SAPCE AS SHOWN ON DRAWINGS. NO CHANGE TO USE, …
B01390098 ↗9 ARGYLE ROAD
BROOKLYN
AlterationPermit Issued05/04/202607/08/2026PROPOSED INTERIOR RENOVATION AT EXISTING APARTMENT 4B ON THE 4TH FLOOR OF 9 ARYGLE ROAD, BROOKLYN. MINOR PARTITIONS AND FINISH WORK AS PER P…
M01335501 ↗99 PARK AVENUE
MANHATTAN
AlterationPermit Issued02/04/202606/17/2026MODIFICATION TO EXISTING PLUMBING SYSTEMS AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01335507 ↗99 PARK AVENUE
MANHATTAN
AlterationPermit Issued02/04/202606/09/2026MODIFICATION TO EXISTING SPRINKLER SYSTEM, INSTALLATION OF TEMPORARY LOOP AND PRE-ACTION SPRINKLER HEADS AS SHOWN ON DRAWINGS. NO CHANGE TO …
M01397636 ↗45 WEST 45 STREET
MANHATTAN
AlterationFiled — no permit on record06/05/2026——
M01388221 ↗37 WEST 94 STREET
MANHATTAN
AlterationPermit Issued05/13/202606/03/2026Herewith filing for new plumbing fixture and replacement of gas range. No change in Use, Egress or Occupancy.
M01191335 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202505/14/2026HEREWITH FILING STRUCTURAL APPLICATION AS PER PLANS SUBMITTED. In conjunction with GC application #'s M01191101, M01191238. NO CHANGE IN USE…
M01335496 ↗99 PARK AVENUE
MANHATTAN
AlterationPermit Issued02/04/202605/12/2026REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01335497 ↗99 PARK AVENUE
MANHATTAN
AlterationPermit Issued02/04/202605/12/2026REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, CONDENSING AC UNITS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO …
M01201236 ↗45 WEST 44 STREET
MANHATTAN
AlterationPermit Issued04/10/202504/14/2026RENOVATION OF THE CELLAR LEVEL FITNESS, PUBLIC RESTROOMS, FIRST FLOOR LOBBY RENOVATION AND RECEPTION AREAS. NO CHANGE IN USE, EGRESS OR OCCU…
M01350593 ↗462 PARK AVENUE SOUTH
MANHATTAN
AlterationPermit Issued03/12/202604/09/2026REMOVAL AND INSTALLATION OF SPRINKLER HEADS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01282861 ↗133 WEST 22 STREET
MANHATTAN
AlterationPermit Issued09/26/202503/30/2026GC/STR WORK INCLUDES, BUT NOT LIMITED TO, MINOR CONCRETE REPAIR, REPLACEMENT OF CMU BLOCKS AND FIREPROOFING OF STEEL BEAMS IN CELLAR + SUB-…
M01363868 ↗1111 AVENUE OF THE AMER
MANHATTAN
AlterationPermit Issued03/16/202603/24/2026PROPOSED HVAC IMPROVEMENTS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01191268 ↗145 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued03/24/202503/11/2026HEREWITH FILING MECHANICAL APPLICATION FOR INSTALLATION OF HVAC EQUIPMENT AS PER PLANS SUBMITTED. In conjunction with the GC application #'s…
X01358368 ↗193 WEST 237 STREET
BRONX
AlterationPermit Issued02/25/202603/09/2026connection to the existing gas piping on the Roof to reconnect to the new RTU unit. Existing gas piping is being replaced with new 2 gas pi…
M01308158 ↗126 WEST 126 STREET
MANHATTAN
AlterationFiled — no permit on record01/15/2026——
M01308177 ↗126 WEST 126 STREET
MANHATTAN
AlterationFiled — no permit on record01/15/2026——
S01297776 ↗2935 VETERANS ROAD WEST
STATEN ISLAND
AlterationSigned-off10/27/202512/30/2025RENOVATION OF EXISTING SPACE. INSTALL NEW PARTITIONS, WALL/FLOOR FINISHES AND CEILING TILES. REPLACE EXISTING STOREFRONT. INSTALL NEW PLUMBI…
S01297777 ↗2935 VETERANS ROAD WEST
STATEN ISLAND
AlterationSigned-off10/28/202512/30/2025Filling for approval of MS work type in conjunction with GC application S01297776-I1
M01232343 ↗45 WEST 44 STREET
MANHATTAN
AlterationPermit Issued06/05/202512/15/2025Modification to existing HVAC system as per plans. no change in use, egress or occupancy. (existing restaurant renovation) Relocation of so…
M01290441 ↗516 WEST 20 STREET
MANHATTAN
AlterationPermit Issued11/07/202512/02/2025Mechanical work at 5th and 6th floors as shown on plans.
M01296955 ↗45 WEST 44 STREET
MANHATTAN
AlterationPermit Issued10/21/202511/13/2025FILING FOR INTERIOR DEMO OF 4TH FLOOR SPACE RELATED TO ALT 1 APPLICATION # M01268316-I1.
M01063091 ↗36 GRAMERCY PARK EAST
MANHATTAN
AlterationSigned-off06/25/202410/27/2025PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01234066 ↗45 WEST 44 STREET
MANHATTAN
AlterationPermit Issued08/07/202508/13/2025modification to existing sprinkler system as per plans. no change in use, egress or occupancy. (existing restaurant renovation)
M01220702 ↗100 11 AVENUE
MANHATTAN
AlterationSigned-off06/11/202508/01/2025REMOVAL OF (3) SP HEADS AND ASSOC BRANCH PIPING
M01229698 ↗45 WEST 44 STREET
MANHATTAN
AlterationSigned-off06/03/202506/16/2025REMOVAL & INSTALLATION OF INTERIOR NON-LOAD BEARING WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (RENOVATION OF EXISTING RESTAURANT AREA) +…
M01232359 ↗45 WEST 44 STREET
MANHATTAN
AlterationSigned-off06/05/202506/13/2025Modification to existing plumbing system as per plans. no change in use, egress or occupancy. (existing restaurant renovation)
M08018619 ↗1514 BROADWAY
MANHATTAN
AlterationSigned-off10/13/202205/30/2025INSTALLATION OF FACADE CURTAIN WALL SYSTEM AND INTERIOR GLASS PARTITIONS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X08035721 ↗1638 ANTHONY AVENUE
BRONX
AlterationSigned-off02/02/202302/24/2025RELATED MECHANICAL AND GC WORK TO EX. DAYCARE CENTER AS PER PLANS ON CEL, 001-002, + ROF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01166239 ↗2600 NETHERLAND AVENUE
BRONX
AlterationSigned-off02/10/202502/18/2025INTERIOR FIT-OUT TO EXISTING FITNESS FACILITY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00991541 ↗501 EAST FORDHAM ROAD
BRONX
AlterationSigned-off02/14/202401/13/2025DEMO OF EXISTING UNITS, COOLING TOWER AND INSTALL OF NEW WATER HEAT PUMP UNITS, NEW AIR-COOLED DRY COOLER, NEW CHILLED WATER COIL AND WATER …
M00657784 ↗100 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off02/16/202201/19/2024MODIFICATION TO MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE OCCUPANCY OR EGRESS.
S00982394 ↗791 VAN DUZER STREET
STATEN ISLAND
AlterationPermit Issued01/03/202401/09/2024INSTALL NEW COMMERCIAL EXHAUST HOOD, DUCT, AND FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00828832 ↗5102 13 AVENUE
BROOKLYN
Alteration COPermit Issued03/31/202308/31/2023CHANGE TO EGRESS AS SHOWN ON DRAWINGS. NO CHANGE TO USE OR OCCUPANCY
M00840598 ↗1176 YORK AVENUE
MANHATTAN
AlterationSigned-off06/21/202308/02/2023REPLACEMENT OF EX. PL FIX WITH NEW AND ASSOC. BRANCH PIPING AS PER PLANS IN PANERA BREAD CAFE AT HOSPITAL. NO CHANGE IN USE, EGRESS OR OCCUP…
M00374199 ↗1441 BROADWAY
MANHATTAN
AlterationSigned-off11/03/202011/09/2020Mechanical work on the 16th floor (Wellspring - build out) as indicated on drawings.
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
STEVEN PAUL HAMMER702/25/2026
HOWARD L ZIMMERMAN ARCH & ENG DPC506/26/2025
DYAMI ARCHITECTURE PC310/21/2025
IMEG Consulting Corp.302/04/2026
OLA CONSULTING ENGINEERS, PC301/15/2026
THE SWITZER GROUP305/06/2026
LG ARCHITECTURAL DESIGN, PLLC208/03/2026
WJE ENGINEERS & ARCHITECTS, P.C.212/15/2025
AMA CONSULTING ENGINEERS, PC104/30/2026
ASHRAF CORP101/03/2024
B2 ENGINEERING PC106/26/2025
CAMERON ENGINEERING102/04/2026
CAPRON DESIGN LLC111/10/2025
CASE ENGINEERING, INC.101/29/2024
CURTAIN WALL DESIGN CONSULTING102/16/2023
DESIGN FORUM ENGINEERING101/29/2024
FABIANO DESIGNS102/10/2025
GEA CONSULTING ENGINEERS107/31/2026
GO BANG STUDIO105/04/2026
GOLDMAN COPELAND ASSOCIATES109/09/2026
LORING CONSULTING ENGINEERS, INC.103/12/2026
Li Architecture Studio LLC106/25/2026
MARK GOULD ARCHITECT109/01/2026
MG ENGINEERING D.P.C.106/05/2026
NELSON AND POPE103/16/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
FIOCCHI GROUP LLC406/26/2025
HUNTER ROBERTS CONSTRUCTI410/21/2025
ALBA GROUP INC305/06/2026
PAR PLUMBING CO., INC304/30/2026
CONSTRUCTOMICS LLC203/12/2026
LHS INTERNATIONAL INC205/29/2026
OVERALL RENOVATION INC208/03/2026
REBOSIO CONSTRUCTION SVC210/28/2025
A & E CONSTRUCTION OF NY106/25/2026
A & M WARSHAW PLBG & HTG106/05/2025
A&A PLUMBING CORP102/04/2026
ALCHEMY DEVELOPMENT101/29/2024
ALED TECHNOLOGIES INC103/16/2026
ALL AMERICAN CONSTRUCTION102/16/2023
ALWYN SZALA111/10/2025
AMERICAN STANDARD PLUMBING105/29/2026
AMW PLUMBING INC106/01/2026
AP PLUMBING & HVAC LLC106/25/2024
ASCO SPRINKLER CO.,INC111/10/2025
BEDROCK MECHANICAL INC109/09/2026
CLS PROJECT SOLUTIONS INC109/09/2026
DEPENDABLE MECH CORP102/25/2026
EDGECOMBE PLBG & HTG INC109/01/2026
EMPIRE STATE PLBG & HTG C107/31/2026
FINE FINISHES CONSTR. LLC111/10/2025
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
KSNY ENTERPRISES LTD and KSSNY INC510/21/2025
METROPOLITAN BANK202/04/2026
TACONIC MANAGEMENT CO LLC201/15/2026
44-45 Broadway Leasing Co, LLC102/16/2023
5TH MIDTOWN LLC104/30/2026
COLLIERS103/12/2026
EIB RIVERDALE CROSSING LLC102/25/2026
FirstService Residential106/11/2025
GENERAL LEASING & MANAGEMENT CORP.111/10/2025
GPG MANAGEMENT109/01/2026
GREENWICH HOTEL107/31/2026
IMPACT MGMT105/04/2026
MCB 5102-13TH AVE BROOKLYN LLC105/06/2026
NEW YORK PRESBYTERIAN HOSPITAL101/29/2024
RUPPERT HOUSING CO INC.105/29/2026
Stream Realty Partners106/05/2026
THE DURST ORGANIZATION103/16/2026
VETERANS CENTER MANAGER LLC110/27/2025
VORNADO REALTY TRUST109/09/2026
WILLIAM MACKLOWE COMPANY105/29/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
METROPOLIS GROUP INC606/05/2026
CONSTRUCTION PERMIT SERVICES509/09/2026
J. CALLAHAN CONSULTING, INC.506/26/2025
GILLMAN CONSULTING INC406/05/2025
A1 EXPEDITING SERVICE CORP.301/15/2026
A. Trilli208/03/2026
CLARKE CONSTRUCTION CONSULTANTS105/29/2026
Chelnitsky Consulting LLC110/27/2025
GREEN LIGHT EXPEDITING LLC110/21/2025
J.A. EXPEDITING, LLC105/29/2026
JAM CONSULTANTS, INC.102/25/2026
MUNICIPAL BUILDING CONSULTANTS109/01/2026
OUTSOURCE CONSULTANTS, INC.107/31/2026
RAMPULLA ASSOCIATES ARCHITECTS105/04/2026
RPO INC.102/16/2023
STONECORE LLC106/25/2024
WILLIAM VITACCO ASSOCIATES111/10/2025
▾Special Inspection Requirements — 150
DateRequirementBuildingInspectorRole
09/01/2026Fire-Resistant Penetrations and Joints39 BEDFORD STREETSalvatore Chiarellispecial
09/01/2026Energy Code Compliance Inspections39 BEDFORD STREETSalvatore Chiarelliprogress
09/01/2026Final39 BEDFORD STREETSalvatore Chiarelliprogress
09/01/2026Lighting in dwelling units39 BEDFORD STREETSalvatore Chiarellienergy_progress
08/04/2026Fire-Resistant Penetrations and Joints888 7 AVENUESalvatore Chiarellispecial
08/04/2026Final888 7 AVENUESalvatore Chiarelliprogress
08/03/2026Lighting in dwelling units32 WEST 95 STREETSalvatore Chiarellienergy_progress
07/29/2026Energy Code Compliance Inspections377 GREENWICH STREETDavid Glickmanprogress
07/29/2026Tenant Protection Plan Compliance377 GREENWICH STREETSalvatore Chiarellispecial
07/29/2026Fire-Resistant Penetrations and Joints377 GREENWICH STREETDavid Glickmanspecial
07/29/2026HVAC-R and service water piping design and insulation377 GREENWICH STREETDavid Glickmanenergy_progress
07/29/2026Maintenance information377 GREENWICH STREETDavid Glickmanenergy_progress
07/29/2026HVAC-R and service water heating system controls377 GREENWICH STREETDavid Glickmanenergy_progress
07/29/2026HVAC-R and service water heating equipment377 GREENWICH STREETDavid Glickmanenergy_progress
07/18/2026Fire-Resistant Penetrations and Joints32 WEST 95 STREETSalvatore Chiarellispecial
07/16/2026HVAC-R and service water heating system controls377 GREENWICH STREETDavid Glickmanenergy_progress
07/16/2026HVAC-R and service water piping design and insulation377 GREENWICH STREETDavid Glickmanenergy_progress
07/16/2026Maintenance information377 GREENWICH STREETDavid Glickmanenergy_progress
07/16/2026HVAC-R and service water heating equipment377 GREENWICH STREETDavid Glickmanenergy_progress
07/16/2026Heating Systems377 GREENWICH STREETDavid Glickmanspecial
07/15/2026Mechanical Systems377 GREENWICH STREETDavid Glickmanspecial
07/15/2026Final377 GREENWICH STREETDavid Glickmanprogress
07/15/2026Tenant Protection Plan Compliance377 GREENWICH STREETSalvatore Chiarellispecial
06/18/2026Final32 WEST 95 STREETSalvatore Chiarelliprogress
05/29/2026Tenant Protection Plan Compliance128 5 AVENUESalvatore Chiarellispecial
05/28/2026Tenant Protection Plan Compliance128 5 AVENUESalvatore Chiarellispecial
05/21/2026Fire-Resistance Rated Construction5102 13 AVENUESalvatore Chiarelliprogress
05/21/2026Construction Operations Influencing Adjacent Structures5102 13 AVENUEANDREW RENFROEspecial
05/21/2026Fire-Resistant Penetrations and Joints5102 13 AVENUESalvatore Chiarellispecial
05/21/2026Structural Stability – Alterations of existing buildings5102 13 AVENUEANDREW RENFROEspecial
05/16/2026Tenant Protection Plan Compliance128 5 AVENUESalvatore Chiarellispecial
05/16/2026Sprinkler Systems128 5 AVENUEVladimir Kaushanskyspecial
05/14/2026Interior lighting power128 5 AVENUEVladimir Kaushanskyenergy_progress
05/14/2026Lighting controls128 5 AVENUEVladimir Kaushanskyenergy_progress
05/14/2026Final128 5 AVENUEVladimir Kaushanskyprogress
05/14/2026Mechanical Systems128 5 AVENUEVladimir Kaushanskyspecial
05/07/2026HVAC-R and service water heating equipment45 WEST 45 STREETSalvatore Chiarellienergy_progress
05/07/2026Duct leakage testing, insulation and design45 WEST 45 STREETSalvatore Chiarellienergy_progress
05/07/2026Permanent certificate45 WEST 45 STREETSalvatore Chiarellienergy_progress
05/07/2026HVAC-R and service water piping design and insulation45 WEST 45 STREETSalvatore Chiarellienergy_progress
05/07/2026HVAC-R and service water heating system controls45 WEST 45 STREETSalvatore Chiarellienergy_progress
05/05/2026Mechanical Systems45 WEST 45 STREETSalvatore Chiarellispecial
05/05/2026Post-installed Anchors45 WEST 45 STREETSalvatore Chiarellispecial
05/05/2026Final45 WEST 45 STREETSalvatore Chiarelliprogress
05/05/2026Energy Code Compliance Inspections45 WEST 45 STREETSalvatore Chiarelliprogress
04/21/2026Final9 ARGYLE ROADGRACE MILLSprogress
04/21/2026Fire-Resistance Rated Construction9 ARGYLE ROADGRACE MILLSprogress
04/21/2026Fire-Resistant Penetrations and Joints9 ARGYLE ROADSalvatore Chiarellispecial
04/16/2026Fire-Resistant Penetrations and Joints37 WEST 94 STREETSalvatore Chiarellispecial
04/16/2026Final37 WEST 94 STREETLEMUEL GUIDOSprogress
Latest 50 of 150.
▾Documents — 485 on file (BIS + DOB NOW)
▸Plans & Drawings84
▸DOB NOWPlans/Sketch81
09/15/2026M01440639-I1Request digital key ↗
09/06/2026M01363868-I1Request digital key ↗
09/02/2026M00657784-I1Request digital key ↗
Showing 3 of 81 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00374199-P1Request digital key ↗
09/04/2026M00374199-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸Applications & Permits20
▸DOB NOWLPC Approval/Permit19
08/23/2026M01191238-I1Open ↗
08/17/2026M01388221-S1Open ↗
08/17/2026M01388221-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications268
▸DOB NOWSpecial Inspector Seal & Signature94
09/28/2026M01063091-I1Open ↗
09/28/2026X01358368-I1Open ↗
09/28/2026X01358368-I1Open ↗
Showing 3 of 94 on file for this type
▸DOB NOWProgress Inspector Seal & Signature89
09/28/2026M01063091-I1Open ↗
09/23/2026M01415888-P1Open ↗
09/23/2026M01440639-S1Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature85
09/15/2026M01440639-S1Open ↗
09/15/2026M01440639-S2Open ↗
09/15/2026M01415888-P1Open ↗
Showing 3 of 85 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026M01220702-I1Open ↗
▸Environmental & Asbestos82
▸DOB NOWDEP ACP-5: Asbestos Assessment Report55
09/15/2026M01440639-S1Open ↗
09/15/2026M01440639-S2Open ↗
09/15/2026M01415888-P1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWOER: Notice to Proceed12
08/21/2026M01290441-P1Open ↗
08/19/2026M01335496-I1Open ↗
08/19/2026M01335501-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/21/2026M01290441-P1Open ↗
08/13/2026S01297777-I1Open ↗
08/13/2026S01297776-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/23/2026M01191335-I1Open ↗
08/21/2026M01303920-I1Open ↗
08/13/2026M01191238-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00657784-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026X00991541-I1Open ↗
Showing 1 of 5 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building8
08/23/2026M01191238-I1Open ↗
08/13/2026M01191101-I1Open ↗
08/13/2026M01191101-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDHCR Document3
08/13/2026M01063091-S2Open ↗
08/13/2026M01063091-S1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWSupporting Document1
08/13/2026S01297776-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type