Special Inspection Agency
DCAS
Special Inspection Agency
5 jobs with open permitsMANHATTAN · 9BRONX · 2STATEN ISLAND · 1
5 buildings
14
Total Filings
12
Jobs on File
5
Buildings Worked
5
Jobs w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Jobs by first filing month12 jobs all-time
0134Jul '19 · 2Sep '19 · 2May '20 · 1Jul '21 · 3Sep '21 · 1Oct '21 · 1May '25 · 1Jul '25 · 1202020212022202320242025
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit542%
Signed off758%
By job type
Alteration12
Most active buildings
All buildings →
1 CENTRE STREETMANHATTAN · 3 open · latest 10/27/2025
4 jobs
111 CENTRE STREETMANHATTAN · 1 open · latest 01/25/2026
3 jobs
2 LAFAYETTE STREETMANHATTAN · 1 open · latest 08/11/2023
2 jobs
350 MARCONI STREETBRONX · latest 01/13/2021
2 jobs
130 STUYVESANT PLACESTATEN ISLAND · latest 07/16/2020
1 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
M00560149 ↗111 CENTRE STREET
MANHATTAN
AlterationSigned-off07/26/202101/25/2026Demo walls (CMU and sheetrock), remove doors, phone cabins, cabinets and closets, ceiling system, prepare floors for new flooring, demo bath…
M01197372 ↗1 CENTRE STREET
MANHATTAN
AlterationPermit Issued05/22/202510/27/2025Remove and install interior partitions, floors and ceilings. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01251230 ↗1 CENTRE STREET
MANHATTAN
AlterationPermit Issued07/24/202509/19/2025Remove and install new chilled water lines from central mechanical room (chiller room) to new Data Center. Provide new backup 30-ton compute…
M00179700 ↗2 LAFAYETTE STREET
MANHATTAN
AlterationSigned-off07/03/201908/11/2023INSTALLATION OF SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00196627 ↗2 LAFAYETTE STREET
MANHATTAN
AlterationPermit Issued07/24/201906/17/2023Installation of new mechanical system on the 12th floor west.
M00602085 ↗1 CENTRE STREET
MANHATTAN
AlterationPermit Issued09/29/202106/17/2023Demolition of existing ductwork. Installation of new ductwork based on new architectural layout. New bathroom exhaust fan.
Counts cover all 12 jobs (12 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
12 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 12Open permit 5Signed off 7
12 jobs
JobAddressTypeStatusFiledLatest permitDescription
M00560149 ↗111 CENTRE STREET
MANHATTAN
AlterationSigned-off07/26/202101/25/2026Demo walls (CMU and sheetrock), remove doors, phone cabins, cabinets and closets, ceiling system, prepare floors for new flooring, demo bath…
M01197372 ↗1 CENTRE STREET
MANHATTAN
AlterationPermit Issued05/22/202510/27/2025Remove and install interior partitions, floors and ceilings. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01251230 ↗1 CENTRE STREET
MANHATTAN
AlterationPermit Issued07/24/202509/19/2025Remove and install new chilled water lines from central mechanical room (chiller room) to new Data Center. Provide new backup 30-ton compute…
M00179700 ↗2 LAFAYETTE STREET
MANHATTAN
AlterationSigned-off07/03/201908/11/2023INSTALLATION OF SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00196627 ↗2 LAFAYETTE STREET
MANHATTAN
AlterationPermit Issued07/24/201906/17/2023Installation of new mechanical system on the 12th floor west.
M00602085 ↗1 CENTRE STREET
MANHATTAN
AlterationPermit Issued09/29/202106/17/2023Demolition of existing ductwork. Installation of new ductwork based on new architectural layout. New bathroom exhaust fan.
M00601580 ↗1 CENTRE STREET
MANHATTAN
AlterationSigned-off10/01/202111/28/2022Installation of new toilet, shower, lavatory, and pantry sink.
M00560460 ↗111 CENTRE STREET
MANHATTAN
AlterationSigned-off07/28/202104/20/2022PAA application filed to install ADA bathroom ( 1 toilet & 1 lavatory) & floor drain, Kid's bathroom ( 2 toilets & 2 lavatories) & floor dra…
M00564796 ↗111 CENTRE STREET
MANHATTAN
AlterationPermit Issued07/28/202109/07/2021Demolition of existing ductwork. Installation of three (3) new VAV boxes, exhaust fan, and new ductwork.
X00202084 ↗350 MARCONI STREET
BRONX
AlterationSigned-off09/06/201901/13/2021Modification to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy.
S00345901 ↗130 STUYVESANT PLACE
STATEN ISLAND
AlterationSigned-off05/01/202007/16/2020Modification of existing air distribution system for new layout of rooms located on the 8th floor. Three existing VAV boxes serve this area.…
X00211770 ↗350 MARCONI STREET
BRONX
AlterationSigned-off09/06/201902/07/2020Modification to Mechanical Systems as per plans filed herewith. No change in use egress or occupancy.
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
BALA CONSULTING ENGINEERS208/25/2020
RUBEN HERRANZ RODRIGUEZ210/29/2021
THE LIRO GROUP107/03/2019
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
PEN ENTERPRISES INC409/29/2021
PAULKA PLUMBING & HTG COR310/29/2021
AWL INDUSTRIES INC207/24/2025
CONTRACT & HOSPITALITY207/24/2025
B&B CONTRACTING GRP LLC109/06/2019
RACANELLI CONSTRUCTION CO108/25/2020
WDF INC107/24/2025
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
NYC DEPARTMENT OF CITYWIDE ADMINIST110/01/2021
Click a row for this entity's own jobs, plans and documents at that building.
BuildingFilingsMost Recent
1 CENTRE STREET ↗407/24/2025
111 CENTRE STREET ↗410/29/2021
350 MARCONI STREET ↗308/25/2020
130 STUYVESANT PLACE ↗105/01/2020
2 LAFAYETTE STREET ↗207/24/2019
▾Special Inspection Requirements — 48
DateRequirementBuildingInspectorRole
07/03/2025Final1 CENTRE STREETDavid Cardenasprogress
07/03/2025Mechanical Systems1 CENTRE STREETDavid Cardenasspecial
06/20/2025Final1 CENTRE STREETDavid Cardenasprogress
06/20/2025Mechanical Systems1 CENTRE STREETDavid Cardenasspecial
10/29/2021Fire-Resistant Penetrations and Joints111 CENTRE STREETJOSEPH WAGNER P.Especial
10/22/2021Fire-Resistant Penetrations and Joints111 CENTRE STREETJOSEPH WAGNER P.Especial
09/29/2021Energy Code Compliance Inspections1 CENTRE STREETSanjay Chaudharyprogress
09/28/2021Ventilation and air distribution system1 CENTRE STREETSanjay Chaudharyenergy_progress
09/28/2021Duct leakage testing, insulation and design1 CENTRE STREETSanjay Chaudharyenergy_progress
09/28/2021Maintenance information1 CENTRE STREETSanjay Chaudharyenergy_progress
09/28/2021Final1 CENTRE STREETSanjay Chaudharyprogress
09/28/2021Mechanical Systems1 CENTRE STREETJOSEPH WAGNER P.Especial
09/28/2021Fire-Resistant Penetrations and Joints1 CENTRE STREETJOSEPH WAGNER P.Especial
07/19/2021Fire-Resistant Penetrations and Joints111 CENTRE STREETJOSEPH WAGNER P.Especial
08/26/2020HVAC and service water heating system controls 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/26/2020HVAC and service water heating equipment 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/26/2020HVAC insulation and sealing 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/26/2020Final350 MARCONI STREETJOSEPH WAGNER P.Eprogress
08/26/2020Energy Code Compliance Inspections350 MARCONI STREETJOSEPH WAGNER P.Eprogress
08/26/2020Maintenance information350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/26/2020Mechanical Systems350 MARCONI STREETJOSEPH WAGNER P.Especial
08/14/2020Energy Code Compliance Inspections350 MARCONI STREETJOSEPH WAGNER P.Eprogress
08/14/2020HVAC and service water heating equipment 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/14/2020Maintenance information350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/14/2020HVAC and service water heating system controls 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/14/2020Final350 MARCONI STREETJOSEPH WAGNER P.Eprogress
08/14/2020Mechanical Systems350 MARCONI STREETJOSEPH WAGNER P.Especial
08/14/2020HVAC insulation and sealing 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
05/01/2020Mechanical Systems130 STUYVESANT PLACEJOSEPH WAGNER P.Especial
05/01/2020Final130 STUYVESANT PLACESanjay Chaudharyprogress
05/01/2020HVAC insulation and sealing 130 STUYVESANT PLACESanjay Chaudharyenergy_progress
08/15/2019HVAC and service water heating system controls 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/15/2019HVAC and service water heating equipment 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/15/2019HVAC insulation and sealing 350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/15/2019Maintenance information350 MARCONI STREETJOSEPH WAGNER P.Eenergy_progress
08/15/2019Final350 MARCONI STREETJOSEPH WAGNER P.Eprogress
08/15/2019Mechanical Systems350 MARCONI STREETJOSEPH WAGNER P.Especial
07/19/2019Mechanical Systems2 LAFAYETTE STREETJOSEPH WAGNER P.Especial
07/19/2019Final2 LAFAYETTE STREETSanjay Chaudharyprogress
07/19/2019Electrical motors2 LAFAYETTE STREETSanjay Chaudharyenergy_progress
07/19/2019Maintenance information2 LAFAYETTE STREETSanjay Chaudharyenergy_progress
07/19/2019HVAC insulation and sealing2 LAFAYETTE STREETSanjay Chaudharyenergy_progress
07/19/2019HVAC and service water heating system controls2 LAFAYETTE STREETSanjay Chaudharyenergy_progress
07/19/2019Shutoff dampers2 LAFAYETTE STREETSanjay Chaudharyenergy_progress
07/19/2019HVAC and service water heating equipment2 LAFAYETTE STREETSanjay Chaudharyenergy_progress
06/13/2019Fire-Resistant Penetrations and Joints2 LAFAYETTE STREETJOSEPH WAGNER P.Especial
06/13/2019Post-installed Anchors2 LAFAYETTE STREETEUGENE BIFULCOspecial
06/12/2019Sprinkler Systems2 LAFAYETTE STREETEUGENE BIFULCOspecial
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch12
09/03/2026M00560149-I1Request digital key ↗
09/03/2026M00564796-I1Request digital key ↗
09/03/2026M00602085-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00196627-I1Request digital key ↗
08/26/2026X00211770-I1Request digital key ↗
08/26/2026S00345901-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026M00179700-I1Request digital key ↗
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/15/2026M00601580-I1Open ↗
08/13/2026M00196627-I1Open ↗
08/13/2026M00602085-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026M01251230-I1Open ↗
09/23/2026M01197372-S3Open ↗
09/02/2026X00202084-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026M00601580-I1Open ↗
08/26/2026X00211770-I1Open ↗
08/26/2026X00202084-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M01251230-I1Open ↗
09/23/2026M01197372-S3Open ↗
09/05/2026M00179700-I1Open ↗
Showing 3 of 17 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
08/22/2026M01197372-S2Open ↗
08/22/2026M01197372-S1Open ↗
08/22/2026M01197372-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026M00601580-I1Open ↗
08/13/2026M01251230-I1Open ↗
08/13/2026S00345901-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/15/2026M00601580-I1Open ↗
08/13/2026X00211770-I1Open ↗
08/13/2026M00179700-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026X00211770-I1Open ↗
Showing 1 of 2 on file for this type
▸Other Documents4
▸DOB NOWProof of Historic Building3
08/13/2026M01251230-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment1
09/01/2026M00560460-I1Open ↗