| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01239812 ↗ | 426 TROUTMAN STREET BROOKLYN | Alteration CO | Permit Issued | 06/25/2025 | 11/12/2025 | INSTALLATION OF STEEL FRAMES AND METAL DECK WITH CONCRETE SLAB FOR EXISTING 1 STORY BUILDING. |
| Q01179496 ↗ | 178-02 HILLSIDE AVENUE QUEENS | Alteration | Signed-off | 03/10/2025 | 10/28/2025 | SCOPE OF WORK INCLUDES INTERIOR BUILD OUT OF COMMERICAL SPACE IN THE CELLAR AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01145352 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 01/16/2025 | 04/29/2025 | TENANT FIT OUT TO EXISTING COMMERCIAL SPACE, WORK INCLUDE GENERAL CONSTUCTION, NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| M01194834 ↗ | 800 2 AVENUE MANHATTAN | Alteration | Signed-off | 03/17/2025 | 04/25/2025 | INSTALLATION OF SPRINKLER PROTECTION FOR 6TH FLOOR EXISTING TENANT SPACE |
| Q00258196 ↗ | 73-12 37 AVENUE QUEENS | Alteration | Permit Issued | 11/22/2019 | 10/04/2024 | HEREWITH FILING FOR MODIFICATION TO EXISTING HVAC SYSTEM WITH DUCT WORK IN RENOVATION SPACE ON 1ST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS … |
| Q01018582 ↗ | 134-37 35TH AVENUE QUEENS | Alteration | Permit Issued | 03/14/2024 | 09/27/2024 | installation of plumbing system for the proposed space |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01239812 ↗ | 426 TROUTMAN STREET BROOKLYN | Alteration CO | Permit Issued | 06/25/2025 | 11/12/2025 | INSTALLATION OF STEEL FRAMES AND METAL DECK WITH CONCRETE SLAB FOR EXISTING 1 STORY BUILDING. |
| Q01179496 ↗ | 178-02 HILLSIDE AVENUE QUEENS | Alteration | Signed-off | 03/10/2025 | 10/28/2025 | SCOPE OF WORK INCLUDES INTERIOR BUILD OUT OF COMMERICAL SPACE IN THE CELLAR AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01145352 ↗ | 28 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 01/16/2025 | 04/29/2025 | TENANT FIT OUT TO EXISTING COMMERCIAL SPACE, WORK INCLUDE GENERAL CONSTUCTION, NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| M01194834 ↗ | 800 2 AVENUE MANHATTAN | Alteration | Signed-off | 03/17/2025 | 04/25/2025 | INSTALLATION OF SPRINKLER PROTECTION FOR 6TH FLOOR EXISTING TENANT SPACE |
| Q00258196 ↗ | 73-12 37 AVENUE QUEENS | Alteration | Permit Issued | 11/22/2019 | 10/04/2024 | HEREWITH FILING FOR MODIFICATION TO EXISTING HVAC SYSTEM WITH DUCT WORK IN RENOVATION SPACE ON 1ST FLOOR AND ROOF. NO CHANGE IN USE, EGRESS … |
| Q01018582 ↗ | 134-37 35TH AVENUE QUEENS | Alteration | Permit Issued | 03/14/2024 | 09/27/2024 | installation of plumbing system for the proposed space |
| M00698779 ↗ | 359 WEST 48 STREET MANHATTAN | Alteration | Permit Issued | 11/30/2022 | 08/23/2024 | INSTALLATION OF MECHANICAL SYSTEMS AND AC UNITS AS PER PLANS FILED HEREWITH. |
| Q00997749 ↗ | 42-33 MAIN STREET QUEENS | Alteration | Signed-off | 02/09/2024 | 04/12/2024 | INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER SYSTEM IN UNIT #1C ON GROUND FLOOR WITH MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHAGN… |
| Q00975101 ↗ | 52-16 34 STREET QUEENS | Alteration | Signed-off | 01/23/2024 | 03/22/2024 | INSTALLATION OF NEW EMERGENCY GENERATOR ON 2ND FLOOR ROOF. |
| Q01019952 ↗ | 134-37 35TH AVENUE QUEENS | Alteration | Filed — no permit on record | 03/14/2024 | — | — |
| Q00996376 ↗ | 42-33 MAIN STREET QUEENS | Alteration | Signed-off | 02/09/2024 | 02/14/2024 | INSTALLATION OF MECHANICAL EQUIPMENT, HVAC, AND VENTILATION SYSTEM IN UNIT #1C ON GROUND FLOOR WITH MECHANICAL WORK AS PER PLAN FILED HEREWI… |
| Q00737332 ↗ | 79-17 ALBION AVENUE QUEENS | Alteration | Signed-off | 05/25/2022 | 09/15/2023 | HEREWITH FILING FOR THE INSTALLATION OF NEW EMERGENCY GENERATOR. |
| M00868554 ↗ | 404 EAST 73 STREET MANHATTAN | Alteration | Permit Issued | 08/01/2023 | 09/07/2023 | HEREWITH FILING FOR GAS USAGE FOR THE GAS PIPING, EQUIPMENT AND APPLIANCES |
| X00317756 ↗ | 4720 PARK AVENUE BRONX | Alteration | Signed-off | 03/09/2020 | 02/15/2023 | HEREWITH FILLING FOR NEW INSTALLATION OF HVAC SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00754725 ↗ | 523 8 AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2022 | 01/31/2023 | HEREWITH FILING FOR THE NEW INSTALLATION OF NEW AC UNITS. |
| Q00806257 ↗ | 22-18 41 STREET QUEENS | Alteration | Signed-off | 01/03/2023 | 01/11/2023 | HEREWITH FILING FOR THE LEGALIZATION OF GAS USAGE FOR COMBINATION HOT WATER COILS/HEATING BOILERS IN TENANT SPACE. |
| Q00639738 ↗ | 13336 37 AVENUE QUEENS | Alteration | Signed-off | 02/23/2022 | 10/27/2022 | HEREWITH FILING FOR INSTALLATION OF NEW HVAC UNITS WITH DUCT WORK IN TENANT SPACE ON PARTIAL CELLAR, 1ST AND MEZZANINE FLOORS. NO CHANGE IN … |
| X00340910 ↗ | 4720 PARK AVENUE BRONX | Alteration | Signed-off | 10/10/2022 | 10/19/2022 | INSTALLATION OF INTEGRAL FUEL OIL TANK FOR THE EMERGENCY GENERATOR. |
| B00591227 ↗ | 139 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 09/17/2021 | 09/13/2022 | REMOVAL, RELOCATION AND INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING ON THE 1ST FLOOR RETAIL SPACE uNIT 104) TO ACCOMMODATE THE PROPOS… |
| Q00737365 ↗ | 79-17 ALBION AVENUE QUEENS | Alteration | Signed-off | 05/25/2022 | 06/17/2022 | INSTALLATION OF ONE 300 GALLON FUEL STORAGE TANK, ONE 300 GALLON BELLY TANK AND ASSOCIATED FUEL OIL PIPINGS. |
| Q00639777 ↗ | 13336 37 AVENUE QUEENS | Alteration | Signed-off | 02/23/2022 | 05/20/2022 | HEREWITH FILING FOR INSTALLATION OF NEW SPRINKLER WORK IN TENANT SPACE ON PARTIAL CELLAR, 1ST AND MEZZANINE FLOORS. NO CHANGE IN USE, EGRESS… |
| M00580514 ↗ | 342 WEST 71 STREET MANHATTAN | Alteration | Permit Issued | 09/13/2021 | 12/15/2021 | Sprinkler plans filed to solve violation received on 6/23/2021(OACH/ECB violation number:39043300P) . To Provide drip valve, siamese connect… |
| M00497540 ↗ | 148 MADISON STREET MANHATTAN | Alteration | Signed-off | 04/06/2021 | 11/22/2021 | HEREWITH FILING TO INSTALL NEW SPRINKLER BOOSTER PUMP AND JOCKEY PUMP FOR EXISTING SPRINKLER SYSTEM. |
| Q00531919 ↗ | 39-16 PRINCE STREET QUEENS | Alteration | Signed-off | 07/13/2021 | 08/20/2021 | INSTALL NEW PLUMBING FIXTURES AND ASSOCIATED PIPING ON 1ST FLOOR EXISTING RESTAURANT SPACE. NO CHANGE IN ARCHITECTURAL LAYOUT. |
| M00399435 ↗ | 130 WEST 42 STREET MANHATTAN | Alteration | Signed-off | 09/25/2020 | 08/19/2021 | Installation of new HVAC system and related ductwork/piping for restaurant renovation as per plans filed herewith. No change in use, egress … |
| Q00476303 ↗ | 20-07 127 STREET QUEENS | Alteration | Signed-off | 02/26/2021 | 05/12/2021 | INSTALLATION OF MECHANICAL HEATING AND COOLING SYSTEM. |
| Q00237523 ↗ | 86-18 60 ROAD QUEENS | Alteration | Signed-off | 10/16/2019 | 12/13/2019 | HEREWITH FILING FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM ON 1ST AND 2ND FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Name | Jobs together | Most recent |
|---|---|---|
| ADG ARCHITECTURE AND DESIGN PC | 2 | 05/04/2026 |
| LU NING ARCHITECTURE, PLLC | 1 | 07/24/2025 |
| SKYLINE ENGINEERING, LLC | 1 | 11/30/2022 |
| Z & T ENGINEERING, P.C. | 1 | 05/04/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| DC BUILDING SERVICES INC | 4 | 07/24/2025 |
| RRP PLUMBING CORP | 2 | 06/03/2022 |
| ADVANCED P,MECH & SPR COR | 1 | 09/13/2021 |
| AMM GEN'L CONTRACTING.INC | 1 | 09/17/2021 |
| AVALANCHE BUILDER LLC | 1 | 01/12/2023 |
| BADGER MANAGEMENT INC | 1 | 11/30/2022 |
| BEN'S HOME IMPROVEMENT IN | 1 | 01/13/2026 |
| BROADTRADE SERVICE GROUP | 1 | 07/24/2025 |
| DAVID CONSTRUCTING NY, IN | 1 | 02/26/2021 |
| DLC DEVELOPMENT CORP | 1 | 01/23/2024 |
| EASTERN ELITE INC | 1 | 05/25/2022 |
| ELITE ILLUSION CONSTRUCT | 1 | 03/03/2023 |
| FRANK MOORE | 1 | 01/23/2024 |
| GO PRO FIRE PROTECTION C | 1 | 01/13/2026 |
| HUNG YIP CONTRACTORS INC | 1 | 05/14/2024 |
| JACK PICCINI, INC | 1 | 10/28/2022 |
| JMZ CONSTRUCTION INC | 1 | 05/04/2026 |
| KIT RENOVATION CORP | 1 | 07/13/2022 |
| MEDRA EXHAUST SYSTEMS COR | 1 | 03/03/2023 |
| MJ GENERAL MECHANICAL LLC | 1 | 01/13/2026 |
| NEW YORK HEATING CORP | 1 | 05/25/2022 |
| NT FIRST DECORATION INC | 1 | 09/29/2021 |
| PERFECTAIRE CO INC | 1 | 05/04/2026 |
| POWER AIR COND. CORP | 1 | 01/13/2026 |
| SCG AMERICA CONST. INC | 1 | 07/24/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| Fultonex Management | 3 | 06/03/2022 |
| BROADTRADE GROUP | 2 | 11/07/2023 |
| ARCADIA | 1 | 05/14/2024 |
| AVALANCHE BUILDER LLC | 1 | 10/28/2022 |
| BANK OF CHINA LLC | 1 | 05/14/2024 |
| CBRE | 1 | 07/24/2025 |
| CUSHMAN & WAKEFIELD | 1 | 09/17/2021 |
| GCM STEEL PRODUCTS INC. | 1 | 05/04/2026 |
| KINGS CAPITAL | 1 | 11/30/2022 |
| Lihua Mo LLC | 1 | 06/02/2025 |
| MAHARAJ A FOOD INC. | 1 | 03/03/2023 |
| PIERMONT PROPERTIES | 1 | 01/13/2026 |
| RIVERSIDE STUDIOS LLC | 1 | 09/13/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| ADG | 2 | 05/04/2026 |
| GILLMAN CONSULTING INC | 1 | 09/29/2021 |
| JAM CONSULTANTS, INC. | 1 | 09/17/2021 |
| LU NING ARCHITECTURE, PLLC | 1 | 07/24/2025 |
| MBE CODE & ZONING LLC | 1 | 11/30/2022 |
| Building | Filings | Most Recent |
|---|---|---|
| 178-02 HILLSIDE AVENUE ↗ | 5 | 01/13/2026 |
| 426 TROUTMAN STREET ↗ | 1 | 09/11/2025 |
| 28 LIBERTY STREET ↗ | 3 | 07/24/2025 |
| 800 2 AVENUE ↗ | 2 | 06/02/2025 |
| 134-37 35TH AVENUE ↗ | 7 | 01/22/2025 |
| 42-33 MAIN STREET ↗ | 4 | 05/14/2024 |
| 52-16 34 STREET ↗ | 2 | 01/23/2024 |
| 404 EAST 73 STREET ↗ | 2 | 11/07/2023 |
| 22-18 41 STREET ↗ | 2 | 04/06/2023 |
| 4720 PARK AVENUE ↗ | 4 | 01/12/2023 |
| 359 WEST 48 STREET ↗ | 1 | 11/30/2022 |
| 523 8 AVENUE ↗ | 1 | 07/13/2022 |
| 13336 37 AVENUE ↗ | 3 | 06/03/2022 |
| 79-17 ALBION AVENUE ↗ | 2 | 05/25/2022 |
| 130 WEST 42 STREET ↗ | 3 | 09/29/2021 |
| 139 FLATBUSH AVENUE ↗ | 1 | 09/17/2021 |
| 342 WEST 71 STREET ↗ | 1 | 09/13/2021 |
| 39-16 PRINCE STREET ↗ | 1 | 07/13/2021 |
| 148 MADISON STREET ↗ | 1 | 04/06/2021 |
| 20-07 127 STREET ↗ | 1 | 02/26/2021 |
| 86-18 60 ROAD ↗ | 3 | 10/23/2020 |
| 73-12 37 AVENUE ↗ | 1 | 11/22/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 02/05/2026 | Fire-Resistant Penetrations and Joints | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 02/05/2026 | Heating Systems | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 02/05/2026 | Tenant Protection Plan Compliance | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 02/05/2026 | Mechanical Systems | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 02/05/2026 | Exhaust and Vent Systems in Plenums and Ducts | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 02/05/2026 | Energy Code Compliance Inspections | 178-02 HILLSIDE AVENUE | ERIC CHANG | progress |
| 02/05/2026 | Final | 178-02 HILLSIDE AVENUE | ERIC CHANG | progress |
| 02/05/2026 | Maintenance information | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 02/05/2026 | HVAC-R and service water piping design and insulation | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 02/05/2026 | HVAC-R and service water heating system controls | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 02/05/2026 | HVAC-R and service water heating equipment | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 01/12/2026 | HVAC-R and service water heating system controls | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 01/12/2026 | HVAC-R and service water heating equipment | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 01/12/2026 | HVAC-R and service water piping design and insulation | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 01/12/2026 | Maintenance information | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 01/12/2026 | Final | 178-02 HILLSIDE AVENUE | ERIC CHANG | progress |
| 01/12/2026 | Energy Code Compliance Inspections | 178-02 HILLSIDE AVENUE | ERIC CHANG | progress |
| 01/12/2026 | Tenant Protection Plan Compliance | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 01/12/2026 | Mechanical Systems | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 01/12/2026 | Heating Systems | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 01/12/2026 | Fire-Resistant Penetrations and Joints | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 01/12/2026 | Exhaust and Vent Systems in Plenums and Ducts | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 12/09/2025 | Tenant Protection Plan Compliance | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 12/09/2025 | HVAC-R and service water heating system controls | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 12/09/2025 | Maintenance information | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 12/09/2025 | HVAC-R and service water piping design and insulation | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 12/09/2025 | HVAC-R and service water heating equipment | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 12/09/2025 | Fire-Resistant Penetrations and Joints | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 11/26/2025 | HVAC-R and service water heating system controls | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 11/26/2025 | Fire-Resistant Penetrations and Joints | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 11/26/2025 | HVAC-R and service water piping design and insulation | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 11/26/2025 | Maintenance information | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 11/26/2025 | HVAC-R and service water heating equipment | 178-02 HILLSIDE AVENUE | ERIC CHANG | energy_progress |
| 11/26/2025 | Tenant Protection Plan Compliance | 178-02 HILLSIDE AVENUE | ERIC CHANG | special |
| 09/11/2025 | Fire-Resistant Penetrations and Joints | 426 TROUTMAN STREET | ERIC CHANG | special |
| 09/11/2025 | Heating Systems | 426 TROUTMAN STREET | ERIC CHANG | special |
| 09/11/2025 | Energy Code Compliance Inspections | 426 TROUTMAN STREET | ERIC CHANG | progress |
| 09/11/2025 | Maintenance information | 426 TROUTMAN STREET | ERIC CHANG | energy_progress |
| 09/11/2025 | HVAC-R and service water heating system controls | 426 TROUTMAN STREET | ERIC CHANG | energy_progress |
| 09/11/2025 | HVAC-R and service water heating equipment | 426 TROUTMAN STREET | ERIC CHANG | energy_progress |
| 09/11/2025 | HVAC-R and service water piping design and insulation | 426 TROUTMAN STREET | ERIC CHANG | energy_progress |
| 09/10/2025 | Final | 426 TROUTMAN STREET | ERIC CHANG | progress |
| 09/10/2025 | Mechanical Systems | 426 TROUTMAN STREET | ERIC CHANG | special |
| 07/24/2025 | HVAC-R and service water heating system controls | 28 LIBERTY STREET | ERIC CHANG | energy_progress |
| 07/24/2025 | Energy Code Compliance Inspections | 28 LIBERTY STREET | ERIC CHANG | progress |
| 07/24/2025 | Tenant Protection Plan Compliance | 28 LIBERTY STREET | ERIC CHANG | special |
| 07/24/2025 | Post-installed Anchors | 28 LIBERTY STREET | ERIC CHANG | special |
| 07/24/2025 | Fire-Resistant Penetrations and Joints | 28 LIBERTY STREET | ERIC CHANG | special |
| 07/24/2025 | Sprinkler Systems | 28 LIBERTY STREET | ERIC CHANG | special |
| 07/24/2025 | HVAC-R and service water piping design and insulation | 28 LIBERTY STREET | ERIC CHANG | energy_progress |