| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01432906 ↗ | 422 EAST 72 STREET MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 09/23/2026 | NON-STRUCTURAL DEMOLITION & RENOVATION OF APARTMENT 37B ON 37TH FLOOR. GEN. CONSTRUCTION WORK INCLUDES KITCHEN, (2) BATHROOMS, 1 POWDER RM &… |
| M01329056 ↗ | 45 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 12/05/2025 | 09/02/2026 | Replace Plumbing fixtures at existing rough-in, as per plans submitted. No change to use, egress or occupancy. |
| M01351828 ↗ | 15 WEST 12 STREET MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 07/29/2026 | PLUMBING APPLICATION OF APT 4F/G. REPLACE PLUMBING FIXTURES WITH EXISTING ROUGH-IN AS PER PLANS SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUP… |
| B01259310 ↗ | 854 EAST 37 STREET BROOKLYN | Alteration | Permit Issued | 07/22/2025 | 04/30/2026 | INTERIOR RENOVATION OF EXISTING 1 FAMILY DWELLING ON CELLAR, 1ST & 2ND FLOORS. GENERAL CONSTRUCTION. ALL WORK AS PER PLANS SUBMITTED. NO CHA… |
| M01387689 ↗ | 205 EAST HOUSTON STREET MANHATTAN | Alteration | Permit Issued | 04/17/2026 | 04/27/2026 | PROPOSED INTERIOR RENOVATION WITHIN A DESIGNATED PARTIAL AREA OF THE GROUND FLOOR OF AN EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANG… |
| M01351705 ↗ | 40 WEST 67 STREET MANHATTAN | Alteration | Permit Issued | 03/31/2026 | 04/23/2026 | NON-STRUCTURAL DEMOLITION & RENOVATION OF APARTMENT 9C ON 9TH FLOOR. GEN. CONSTRUCTION WORK INCLUDES KITCHEN AND MINOR PARTITION WORK. REPLA… |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M01432906 ↗ | 422 EAST 72 STREET MANHATTAN | Alteration | Permit Issued | 07/20/2026 | 09/23/2026 | NON-STRUCTURAL DEMOLITION & RENOVATION OF APARTMENT 37B ON 37TH FLOOR. GEN. CONSTRUCTION WORK INCLUDES KITCHEN, (2) BATHROOMS, 1 POWDER RM &… |
| M01329056 ↗ | 45 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 12/05/2025 | 09/02/2026 | Replace Plumbing fixtures at existing rough-in, as per plans submitted. No change to use, egress or occupancy. |
| M01351828 ↗ | 15 WEST 12 STREET MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 07/29/2026 | PLUMBING APPLICATION OF APT 4F/G. REPLACE PLUMBING FIXTURES WITH EXISTING ROUGH-IN AS PER PLANS SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUP… |
| B01259310 ↗ | 854 EAST 37 STREET BROOKLYN | Alteration | Permit Issued | 07/22/2025 | 04/30/2026 | INTERIOR RENOVATION OF EXISTING 1 FAMILY DWELLING ON CELLAR, 1ST & 2ND FLOORS. GENERAL CONSTRUCTION. ALL WORK AS PER PLANS SUBMITTED. NO CHA… |
| M01387689 ↗ | 205 EAST HOUSTON STREET MANHATTAN | Alteration | Permit Issued | 04/17/2026 | 04/27/2026 | PROPOSED INTERIOR RENOVATION WITHIN A DESIGNATED PARTIAL AREA OF THE GROUND FLOOR OF AN EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANG… |
| M01351705 ↗ | 40 WEST 67 STREET MANHATTAN | Alteration | Permit Issued | 03/31/2026 | 04/23/2026 | NON-STRUCTURAL DEMOLITION & RENOVATION OF APARTMENT 9C ON 9TH FLOOR. GEN. CONSTRUCTION WORK INCLUDES KITCHEN AND MINOR PARTITION WORK. REPLA… |
| B00891328 ↗ | 263 AINSLIE STREET BROOKLYN | Alteration CO | Permit Issued | 07/14/2023 | 04/09/2026 | GEN. CONSTRUCTION OF EXIST. 2-FAMILY HOUSE ON BASEMENT FLOOR AND FIRST FL. ALL WORK AS PER PLAN SUBMITTED. REMOVE (2) CAR GARAGES UNDER EXIS… |
| B01344022 ↗ | 407 3 STREET BROOKLYN | Alteration | Permit Issued | 02/05/2026 | 03/30/2026 | PLUMBING WORK OF AN EXISTING 4 STORY BUILDING W/ CELLAR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 4 FAMILY DWELLING TO REMAIN. NO CHANGE TO … |
| M01199964 ↗ | 179 LUDLOW STREET MANHATTAN | Alteration | Permit Issued | 04/02/2025 | 03/16/2026 | SUBSEUQENT FILING STRUCTURAL WORK FOR THE PROPSED OPENINGS AT 1ST FLOOR. INSTALL STEEL HEADER BEAMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01331700 ↗ | 205 EAST HOUSTON STREET MANHATTAN | Alteration | Filed — no permit on record | 12/22/2025 | — | — |
| B01214268 ↗ | 689 MYRTLE AVENUE BROOKLYN | Alteration | Signed-off | 04/29/2025 | 12/01/2025 | Plumbing work for Apartment 4I on 4th Floor. Work includes renovation of Existing Kitchen, Bathroom and Laundry Room, Replace plumbing fixt… |
| M01199979 ↗ | 205 EAST HOUSTON STREET MANHATTAN | Alteration | Signed-off | 04/04/2025 | 08/27/2025 | SUBSEUQENT FILING STRUCTURAL WORK FOR THE PROPSED OPENINGS ON 1ST FLOOR. INSTALL STEEL HEADER BEAMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01178515 ↗ | 1640 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2025 | 02/18/2025 | INTERIOR RENOVATION OF AN EATING AND DRINKING ESTABLISHMENT ON GROUND FL AND SECOND FL. ADD NEW TAKEOUT WINDOW. GENERAL CONSTRUCTION ONLY AS… |
| B01021475 ↗ | 689 6 AVENUE BROOKLYN | Alteration | Signed-off | 03/25/2024 | 02/10/2025 | INTERIOR RENOVATION OF AN EXISTING 2 FAMILY DWELLING ON 2ND AND 3RD FLOOR ONLY. GENERAL CONSTRUCTION WORK TYPE. EXISTING MIXED USE BUILDING … |
| M01117849 ↗ | 103 MADISON STREET MANHATTAN | Alteration | Filed — no permit on record | 10/11/2024 | — | — |
| Q01025033 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 04/01/2024 | 05/23/2024 | UNIT 10B. HEREWITH FILING FOR INSTALLATION OF NON-LOAD BEARING PARTITIONS AND MODIFICATION TO EXISTING HVAC SYSTEM |
| Q01025046 ↗ | 138-35 39 AVENUE QUEENS | Alteration | Signed-off | 04/01/2024 | 05/20/2024 | UNIT 10B. HEREWITH FILING FOR INSTALLATION OF PLUMBING FIXTURES AND MODIFICATION TO EXISTING SPRINKLER SYSTEM. |
| Q00979451 ↗ | 166-03 23 AVENUE QUEENS | Alteration | Signed-off | 12/29/2023 | 02/15/2024 | Interior Renovation of Existing 1-family dwelling. General Construction on Cellar, 1st and 2nd floor. A new attached accessory non-commerci… |
| B00894727 ↗ | 842 EAST 37 STREET BROOKLYN | Alteration | Signed-off | 08/21/2023 | 12/26/2023 | INTERIOR RENOVATION OF EXISTING 1 FAMILY DWELLING ON CELLAR, 1ST & 2ND FLOORS. GENERAL CONSTRUCTION. ALL WORK AS PER PLANS SUBMITTED. NO CHA… |
| B00776560 ↗ | 26 MARCY AVENUE BROOKLYN | Alteration CO | Permit Issued | 07/19/2022 | 11/28/2023 | INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. GENERAL CONSTRUCTION. ALL WORK AS PER PLAN SUBMITTED. CHANGE OF OCCUPANCY A… |
| B00939165 ↗ | 263 AINSLIE STREET BROOKLYN | Alteration | Permit Issued | 09/25/2023 | 10/11/2023 | FILING MECHANICAL SYSTEM. ALL WORK AS PER PLAN SUBMITTED. NO BULK CHANGE PROPOSED UNDER THIS APPLICATION |
| B00790430 ↗ | 20 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 08/25/2022 | 10/10/2023 | SPRINKLER WORK TYPE FOR INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. ALL WORK AS PER PLAN SUBMITTED. NO CHANGE IN USE, E… |
| B00790432 ↗ | 26 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 08/25/2022 | 10/10/2023 | SPRINKLER WORK TYPE FOR INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. ALL WORK AS PER PLAN SUBMITTED. CHANGE OF OCCUPANCY… |
| B00790436 ↗ | 24 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 08/25/2022 | 10/10/2023 | SPRINKLER WORK TYPE FOR INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. ALL WORK AS PER PLAN SUBMITTED. NO CHANGE IN USE, E… |
| Q08002336 ↗ | 31-45 41 STREET QUEENS | Alteration | Signed-off | 09/14/2022 | 08/01/2023 | PLUMBING APPLICATION FOR THE INTERIOR RENOVATION OF EXISTING BASEMENT & 1ST FLOOR. EXISTING 1 FAMILY DWELLING TO REMAIN. NO CHANGE TO USE, E… |
| M08015800 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/07/2023 | 07/01/2023 | FILING APPLICATION FOR APARTMENT 8BC ON THE 8TH FLOOR. WORK INCLUDES REMOVAL OF PARTITIONS (NON-LOAD BEARING), MINOR INTERIOR RENOVATIONS AS… |
| Q00878696 ↗ | 132-27 41 ROAD QUEENS | Alteration | Signed-off | 05/22/2023 | 06/12/2023 | PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPA… |
| M00880170 ↗ | 772 BROADWAY MANHATTAN | Alteration | Signed-off | 06/01/2023 | 06/10/2023 | FILING APPLICATION FOR APARTMENT 17S ON 17TH FLOOR. WORK INCLUDES INTERIOR RENOVATIONS OF KITCHEN AND 2 BATHROOMS ONLY. REPLACE PLUMBING FIX… |
| Q00878669 ↗ | 132-27 41 ROAD QUEENS | Alteration | Signed-off | 05/22/2023 | 06/02/2023 | INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY. |
| Q00855613 ↗ | 13618 MAPLE AVE QUEENS | Alteration | Signed-off | 04/13/2023 | 05/17/2023 | INTERIOR RENOVATION OF MEDICAL OFFICE. PLUMBING & SPRINKLER WORK TYPE. NO CHANGE IN USE OR OCCUPANCY. |
| Q00855564 ↗ | 13618 MAPLE AVE QUEENS | Alteration | Signed-off | 04/13/2023 | 05/08/2023 | INTERIOR RENOVATION OF MEDICAL OFFICE. GC WORK TYPE UNDER THIS APPLICATION. GENERAL CONSTRUCTION AND NEW PARTITIONS. NO CHANGE IN USE OR OCC… |
| B00666031 ↗ | 2923 FILLMORE AVENUE BROOKLYN | Alteration | Signed-off | 01/27/2022 | 04/17/2023 | INTERIOR RENOVATION OF EXISTING CELLAR TO SECOND FLOOR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 1 FAMILY DWELLING TO REMAIN. NO CHANGE TO U… |
| Q00844386 ↗ | 132-27 41 ROAD QUEENS | Alteration | Filed — no permit on record | 03/16/2023 | — | — |
| B00573540 ↗ | 9 ST FELIX STREET BROOKLYN | Alteration | Signed-off | 08/12/2021 | 02/02/2023 | plumbing work type for existing 2 family dwelling, work on 1st floor to 3rd floor only. Existing 2 family dwellings to remain, no change to … |
| B00801669 ↗ | 26 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 12/20/2022 | 01/31/2023 | MINOR INTERIOR DEMOLITION AND RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. GENERAL CONSTRUCTION. ALL WORK AS PER PLAN SUBMITTED. … |
| B00774951 ↗ | 24 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 07/15/2022 | 12/17/2022 | GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE FOR INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. ALL WORK AS PER PLAN SUBM… |
| M00741857 ↗ | 45 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 07/08/2022 | 12/02/2022 | INTERIOR ALTERATION. MINOR PARTITION AND PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| B00774426 ↗ | 20 MARCY AVENUE BROOKLYN | Alteration | Signed-off | 07/15/2022 | 12/01/2022 | GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE FOR INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON GROUND FLOOR. ALL WORK AS PER PLAN SUBM… |
| B08016372 ↗ | 2432 84 STREET BROOKLYN | Alteration | Signed-off | 10/07/2022 | 11/07/2022 | INTERIOR RENOVATION OF EXISTING CELLAR TO REAR FIRST FLOOR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 4 FAMILY DWELLING TO REMAIN. NO CHANGE … |
| M08015556 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2022 | 10/27/2022 | FILING APPLICATION FOR APARTMENT 12K ON 12TH FLOOR. WORK INCLUDES INSTALLATION OF TWO NEW THROUGH-WALL HVAC UNITS. NO CHANGE IN USE, EGRESS … |
| B00766909 ↗ | 5521 8TH AVENUE BROOKLYN | Alteration | Signed-off | 07/01/2022 | 10/03/2022 | PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. CONSTRUCTION & MECHANICAL WORK TYPE FILED UNDER SEPARATE APPLICATIO… |
| B00766658 ↗ | 5521 8TH AVENUE BROOKLYN | Alteration | Signed-off | 06/30/2022 | 09/15/2022 | INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT, GENERAL CONSTRUCTION & MECHANICAL WORK. PLUMBING & SPRINKLER WORK TYPE FILED U… |
| M00793102 ↗ | 134 CHARLES STREET MANHATTAN | Alteration | Signed-off | 08/19/2022 | 08/23/2022 | INTERIOR RENOVATION OF EXISTING MIXED USED BLDG ON FIRST & CELLAR FLOOR. GENERAL CONSTRUCTION OF EXISTING OFFICE UNDER CO# 121937725F. ALL W… |
| B00776493 ↗ | 75 SMITH STREET BROOKLYN | Alteration | Signed-off | 07/19/2022 | 08/12/2022 | INTERIOR RENOVATION OF UNIT 8D. MINOR PARTITION ALTERATION & PAINT WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00489799 ↗ | 112 2 PLACE BROOKLYN | Alteration | Signed-off | 04/23/2021 | 08/03/2022 | INTERIOR RENOVATION OF AN EXISTING 3 STORY BUILDING W/ BASEMENT AND CELLAR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 4 FAMILY DWELLING TO RE… |
| B00519156 ↗ | 9 ST FELIX STREET BROOKLYN | Alteration | Signed-off | 05/11/2021 | 07/28/2022 | INTERIOR RENOVATION OF EXISTING BASEMENT FLOOR AND CELLAR FLOOR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 2 FAMILY DWELLING TO REMAIN. NO CH… |
| M00661561 ↗ | 367 WEST 120 STREET MANHATTAN | Alteration | Signed-off | 02/18/2022 | 06/04/2022 | INTERIOR RENOVATION OF EXISTING CELLAR TO PARLOR FLOOR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 3 FAMILY DWELLING TO REMAIN. NO CHANGE TO U… |
| M00639936 ↗ | 400 BROOME STREET MANHATTAN | Alteration | Signed-off | 12/28/2021 | 05/06/2022 | INTERIOR RENOVATION OF AN EXISTING STORE ON GROUND FL, GENERAL CONSTRUCTION AND PLUMBING WORK, NEW PARTITIONS AND PAINT AS PER PLAN FILED HE… |
| Q00651934 ↗ | 47-14 DITMARS BOULEVARD QUEENS | Alteration | Signed-off | 01/25/2022 | 03/17/2022 | INTERIOR RENOVATION OF BASEMENT TO 2ND FLOOR AND REAR YARD OF EXISTING 2 STORIES & BASEMENT HOUSE. EXISTING 2-FAMILY DWELLING UNIT TO REMAI… |
| M00590937 ↗ | 25 SUTTON PLACE SOUTH MANHATTAN | Alteration | Signed-off | 11/04/2021 | 03/15/2022 | FILING APPLICATION FOR THE COMBINATION OF APARTMENTS 8C AND 8D ON THE 8TH FLOOR AS PER TPPN 3/97. WORK INCLUDES INTERIOR RENOVATIONS, REMOVA… |
| Q00631860 ↗ | 42-02 BELL BOULEVARD QUEENS | Alteration | Signed-off | 11/29/2021 | 12/23/2021 | INTERIOR RENOVATION ON EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00402612 ↗ | 806 BROADWAY MANHATTAN | Alteration | Signed-off | 09/23/2020 | 10/15/2021 | replacement and relocation of HVAC units |
| B00573761 ↗ | 9 ST FELIX STREET BROOKLYN | Alteration | Filed — no permit on record | 08/12/2021 | — | — |
| Q00540105 ↗ | 132-32 MAPLE AVENUE QUEENS | Alteration | Signed-off | 06/17/2021 | 07/22/2021 | FILING APPLICATION FOR MINOR ALTERATION OF AN INTERIOR MEDICAL OFFICE ON GROUND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| B00487902 ↗ | 778 QUINCY STREET BROOKLYN | Alteration | Permit Issued | 04/13/2021 | 06/07/2021 | INTERIOR RENOVATION OF CELLAR AND GARDEN FLOOR OF AN EXISTING 3 STORY 2 FAMILY DWELLING UNIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00408366 ↗ | 215 WEST 90 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/16/2020 | — | — |
| Q00326927 ↗ | 146-19 61 ROAD QUEENS | Alteration | Signed-off | 03/05/2020 | 07/02/2020 | New bathroom plumbing fixtures at all floors. And new kitchen plumbing fixtures 1st and 2nd floor |
| M00328826 ↗ | 4 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 03/10/2020 | 06/05/2020 | GENERAL SPRINKLER WORK TAKING PLACE ON THE 4TH FLOOR, AS INDICATED ON PLANS FILED HEREWITH. (8) EXISTING SPRINKLER HEADS AND ASSOCIATED PIPI… |
| M00273837 ↗ | 4 COLUMBUS CIRCLE MANHATTAN | Alteration | Permit Issued | 12/13/2019 | 05/27/2020 | General mechanical work taking place on the 5th floor, as indicated on plans filed herewith. |
| M00328823 ↗ | 4 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 03/10/2020 | 05/27/2020 | General mechanical work taking place on the 4th floor, as indicated on plan filed herewith. |
| M00271366 ↗ | 784 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/24/2019 | 02/20/2020 | MECHANICAL WORK FOR NEW SPLIT SYSTEM IN UNIT 1A, 1B, 1C & 1D. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00268461 ↗ | 1918 86 STREET BROOKLYN | Alteration | Signed-off | 12/03/2019 | 12/11/2019 | INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. PLUMBING AND MECHANICAL WORK TYPE FILED UNDER DOB NOW. |
| M00195456 ↗ | 551 10 AVENUE MANHATTAN | Alteration | Signed-off | 07/19/2019 | 10/02/2019 | Modify Existing Sprinkler system as per plan filed herewith. NO change in use, egress or occupancy. |
| M00207604 ↗ | 551 10 AVENUE MANHATTAN | Alteration | Signed-off | 08/08/2019 | 09/13/2019 | Proposed mechanical work includes (2) water source heat pump units. Ventilation is provided to the space using fresh air fan ducted directly… |
| Name | Jobs together | Most recent |
|---|---|---|
| WJY ELECTRIC INC. | 3 | 03/10/2020 |
| LAM ENGINEER PC | 2 | 06/20/2025 |
| KCE CONSULTING ENGINEERING PLLC | 1 | 07/30/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| WJ CONTRACTING CORP | 11 | 04/17/2026 |
| S & T CONSTRUCTION INC | 4 | 04/21/2026 |
| NEW YORK CONSTRUCTION ASS | 3 | 05/22/2020 |
| ORBIT SPRINKLER CORP | 3 | 08/25/2022 |
| AMERICAN STANDARD P&H COR | 2 | 02/12/2026 |
| MPS PLUMBING & HEATING IN | 2 | 09/27/2024 |
| TRUEBLUE CONSTRUCTION LLC | 2 | 02/12/2026 |
| 786 A&S.CONSTRUCTION CORP | 1 | 04/13/2021 |
| A T CONCEPT INC | 1 | 07/08/2022 |
| AAA TOTAL PLUMBING, INC | 1 | 02/16/2023 |
| ABDUL CONSTRUCTION INC | 1 | 04/23/2021 |
| AMERICAN STANDARD PLUMBIN | 1 | 07/01/2022 |
| BULLS EYE CONTRACTOR INC | 1 | 08/17/2023 |
| CATMAN PLUMBING INC | 1 | 01/12/2021 |
| CUBE BUILDERS GROUP NY | 1 | 10/11/2022 |
| DECO BUILDING GROUP CORP | 1 | 11/29/2021 |
| DIAMOND ERA CONSTR. INC | 1 | 08/05/2022 |
| DPH PLUMBING & HTG CORP | 1 | 08/17/2023 |
| EMPIRE PLUMBING INC | 1 | 07/19/2019 |
| G-NET CONSTRUCTION CORP | 1 | 08/08/2019 |
| GLOBAL DESIGN CONCEPT COR | 1 | 07/20/2026 |
| H INTERIOR DESIGN CONSTRU | 1 | 09/27/2024 |
| HAMILTON AIR COMPANY, INC | 1 | 10/18/2022 |
| HH BUILDING SERVICES INC | 1 | 06/30/2022 |
| HIM & WILMAN HOME IMPROVE | 1 | 03/31/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| PATOMA INC | 7 | 05/07/2024 |
| ALLIED PARTNERS | 2 | 10/26/2023 |
| NUSUN TOWERS | 2 | 08/04/2023 |
| 134 CHARLES LLC | 1 | 02/21/2023 |
| 407 AR LLC | 1 | 02/12/2026 |
| ADIR PARTNERS LLC | 1 | 07/30/2024 |
| EXTELL DEVELOPMENT | 1 | 07/19/2019 |
| FORKOSH CONSTRUCTION CO INC | 1 | 12/28/2021 |
| LIFECARE | 1 | 09/16/2021 |
| ORSID REALTY CORP | 1 | 10/16/2020 |
| QUEENS WELL CARE LLC | 1 | 06/28/2023 |
| RELIABLE PROPERTY MANAGEMENT LLC | 1 | 03/16/2025 |
| RUDD REALTY | 1 | 03/31/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| EVAN CHAN ARCHITECT P.C. | 27 | 07/20/2025 |
| BMB BUILDING CONSULTING INC. | 2 | 06/20/2025 |
| JAM CONSULTANTS, INC. | 2 | 09/27/2024 |
| METROPOLIS GROUP INC | 2 | 10/26/2023 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/17/2026 | Fire-Resistant Penetrations and Joints | 422 EAST 72 STREET | Evan Chan | special |
| 07/17/2026 | Tenant Protection Plan Compliance | 422 EAST 72 STREET | Evan Chan | special |
| 07/17/2026 | Final | 422 EAST 72 STREET | Evan Chan | progress |
| 07/17/2026 | Energy Code Compliance Inspections | 422 EAST 72 STREET | Evan Chan | progress |
| 07/17/2026 | Fire-Resistance Rated Construction | 422 EAST 72 STREET | Evan Chan | progress |
| 07/17/2026 | Lighting controls | 422 EAST 72 STREET | Evan Chan | energy_progress |
| 07/17/2026 | Interior lighting power | 422 EAST 72 STREET | Evan Chan | energy_progress |
| 07/17/2026 | Lighting in dwelling units | 422 EAST 72 STREET | Evan Chan | energy_progress |
| 07/17/2026 | Tenant Protection Plan Compliance | 422 EAST 72 STREET | Evan Chan | special |
| 04/15/2026 | Interior lighting power | 205 EAST HOUSTON STREET | Evan Chan | energy_progress |
| 04/15/2026 | Final | 205 EAST HOUSTON STREET | Evan Chan | progress |
| 04/15/2026 | Fire-Resistance Rated Construction | 205 EAST HOUSTON STREET | Evan Chan | progress |
| 04/15/2026 | Energy Code Compliance Inspections | 205 EAST HOUSTON STREET | Evan Chan | progress |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | 205 EAST HOUSTON STREET | Evan Chan | special |
| 04/06/2026 | Tenant Protection Plan Compliance | 689 MYRTLE AVENUE | Evan Chan | special |
| 03/11/2026 | Tenant Protection Plan Compliance | 689 MYRTLE AVENUE | Evan Chan | special |
| 02/26/2026 | Tenant Protection Plan Compliance | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/26/2026 | Lighting in dwelling units | 45 SUTTON PLACE SOUTH | Evan Chan | energy_progress |
| 02/26/2026 | Interior lighting power | 45 SUTTON PLACE SOUTH | Evan Chan | energy_progress |
| 02/26/2026 | Lighting controls | 45 SUTTON PLACE SOUTH | Evan Chan | energy_progress |
| 02/26/2026 | Final | 45 SUTTON PLACE SOUTH | Evan Chan | progress |
| 02/26/2026 | Energy Code Compliance Inspections | 45 SUTTON PLACE SOUTH | Evan Chan | progress |
| 02/26/2026 | Fire-Resistance Rated Construction | 45 SUTTON PLACE SOUTH | Evan Chan | progress |
| 02/26/2026 | Fire-Resistant Penetrations and Joints | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/26/2026 | Tenant Protection Plan Compliance | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/26/2026 | Mechanical Systems | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/12/2026 | Interior lighting power | 45 SUTTON PLACE SOUTH | Evan Chan | energy_progress |
| 02/12/2026 | Fire-Resistant Penetrations and Joints | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/12/2026 | Mechanical Systems | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/12/2026 | Tenant Protection Plan Compliance | 45 SUTTON PLACE SOUTH | Evan Chan | special |
| 02/12/2026 | Energy Code Compliance Inspections | 45 SUTTON PLACE SOUTH | Evan Chan | progress |
| 02/12/2026 | Final | 45 SUTTON PLACE SOUTH | Evan Chan | progress |
| 02/12/2026 | Fire-Resistance Rated Construction | 45 SUTTON PLACE SOUTH | Evan Chan | progress |
| 02/12/2026 | Lighting controls | 45 SUTTON PLACE SOUTH | Evan Chan | energy_progress |
| 02/12/2026 | Lighting in dwelling units | 45 SUTTON PLACE SOUTH | Evan Chan | energy_progress |
| 01/29/2026 | Tenant Protection Plan Compliance | 689 MYRTLE AVENUE | Evan Chan | special |
| 01/27/2026 | Tenant Protection Plan Compliance | 15 WEST 12 STREET | Evan Chan | special |
| 01/27/2026 | Fire-Resistance Rated Construction | 40 WEST 67 STREET | Evan Chan | progress |
| 01/27/2026 | Energy Code Compliance Inspections | 40 WEST 67 STREET | Evan Chan | progress |
| 01/27/2026 | Final | 40 WEST 67 STREET | Evan Chan | progress |
| 01/27/2026 | Tenant Protection Plan Compliance | 40 WEST 67 STREET | Evan Chan | special |
| 01/27/2026 | Fire-Resistant Penetrations and Joints | 40 WEST 67 STREET | Evan Chan | special |
| 01/27/2026 | Lighting in dwelling units | 40 WEST 67 STREET | Evan Chan | energy_progress |
| 01/27/2026 | Lighting controls | 40 WEST 67 STREET | Evan Chan | energy_progress |
| 01/27/2026 | Interior lighting power | 40 WEST 67 STREET | Evan Chan | energy_progress |
| 01/08/2026 | Duct leakage testing, insulation and design | 407 3 STREET | Evan Chan | energy_progress |
| 01/08/2026 | HVAC-R and service water piping design and insulation | 407 3 STREET | Evan Chan | energy_progress |
| 01/08/2026 | HVAC-R and service water heating system controls | 407 3 STREET | Evan Chan | energy_progress |
| 01/08/2026 | HVAC-R and service water heating equipment | 407 3 STREET | Evan Chan | energy_progress |
| 01/08/2026 | Interior lighting power | 407 3 STREET | Evan Chan | energy_progress |