| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01186327 ↗ | 264 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/26/2025 | 09/23/2026 | Temporary standpipe application filed in conjunction to application #B01186327-I1. |
| B01127732 ↗ | 362 LIVINGSTON STREET BROOKLYN | New Building | Permit Issued | 11/04/2024 | 09/22/2026 | Temporary standpipe application filed in conjunction with new building application # B01127732-I1 |
| B00781447 ↗ | 362 LIVINGSTON STREET BROOKLYN | New Building | Permit Issued | 09/28/2022 | 09/21/2026 | Underground plumbing work for NB. Full plumbing plans to be filed separately |
| B00656247 ↗ | 263 PROSPECT AVENUE BROOKLYN | New Building | Permit Issued | 01/27/2022 | 09/16/2026 | Super structure for NB filing as per plans. |
| B00814498 ↗ | 362 LIVINGSTON STREET BROOKLYN | New Building | Permit Issued | 01/26/2023 | 09/15/2026 | Underground plumbing work for NB. Full plumbing plans to be filed separately |
| B01172199 ↗ | 264 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/19/2025 | 09/04/2026 | Underpinning filed in conjunction to application B01172199-S1 |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01186327 ↗ | 264 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/26/2025 | 09/23/2026 | Temporary standpipe application filed in conjunction to application #B01186327-I1. |
| B01127732 ↗ | 362 LIVINGSTON STREET BROOKLYN | New Building | Permit Issued | 11/04/2024 | 09/22/2026 | Temporary standpipe application filed in conjunction with new building application # B01127732-I1 |
| B00781447 ↗ | 362 LIVINGSTON STREET BROOKLYN | New Building | Permit Issued | 09/28/2022 | 09/21/2026 | Underground plumbing work for NB. Full plumbing plans to be filed separately |
| B00656247 ↗ | 263 PROSPECT AVENUE BROOKLYN | New Building | Permit Issued | 01/27/2022 | 09/16/2026 | Super structure for NB filing as per plans. |
| B00814498 ↗ | 362 LIVINGSTON STREET BROOKLYN | New Building | Permit Issued | 01/26/2023 | 09/15/2026 | Underground plumbing work for NB. Full plumbing plans to be filed separately |
| B01172199 ↗ | 264 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/19/2025 | 09/04/2026 | Underpinning filed in conjunction to application B01172199-S1 |
| M01340266 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Permit Issued | 02/03/2026 | 09/01/2026 | Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site. |
| Q01220686 ↗ | 153-02 HILLSIDE AVENUE QUEENS | New Building | Permit Issued | 08/22/2025 | 08/14/2026 | SUPPORT OF EXCAVATION (SOE) AS PER PLANS FILED |
| B00969604 ↗ | 927 41 STREET BROOKLYN | New Building | Permit Issued | 01/05/2024 | 07/24/2026 | Underpinning filed in conjunction with NB # B00969604-I1 |
| Q01047345 ↗ | 90-32 QUEENS BOULEVARD QUEENS | New Building | Permit Issued | 07/17/2024 | 07/23/2026 | Install combined wet standpipe and sprinkler system as per plans filed. Filed in conjunction with NB #Q01047345. |
| B01186301 ↗ | 264 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/26/2025 | 07/01/2026 | Temporary standpipe application filed in conjunction to application #B01186301-I1 |
| B01178945 ↗ | 290 BERGEN STREET BROOKLYN | New Building | Permit Issued | 02/24/2025 | 06/30/2026 | Temporary standpipe application filed in conjunction to application #B01178945-I1 |
| X00658182 ↗ | 2522 PARK AVENUE BRONX | New Building | Permit Issued | 04/01/2022 | 06/23/2026 | Underground plumbing and civil work for NB application X00658182-I1 |
| B01379311 ↗ | 100 3 AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2026 | 04/30/2026 | UNDERPINNING WORK FILED TO STABILIZE EXISTING STRUCTURE |
| B01350177 ↗ | 176 3 AVENUE BROOKLYN | New Building | Filed — no permit on record | 03/19/2026 | — | — |
| B01002579 ↗ | 29 WYTHE AVENUE BROOKLYN | Alteration | Permit Issued | 02/12/2024 | 03/09/2026 | Support of Excavation application filed in conjunction with NB GC, job number: B01005488-I1. |
| B00698115 ↗ | 2201 BEVERLY ROAD BROOKLYN | New Building | Permit Issued | 03/21/2022 | 12/24/2025 | STRUCTURAL FILED IN CONJUNCTION WITH NB # B00698115-I1 |
| M00903198 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/08/2023 | 12/23/2025 | Support of excavation as per plans. |
| B00698117 ↗ | 2359 BEDFORD AVENUE BROOKLYN | New Building | Permit Issued | 03/22/2022 | 12/19/2025 | STRUCTURE FILED IN CONJUNCTION WITH NB # B00698117-I1 |
| B00698118 ↗ | 2363 BEDFORD AVENUE BROOKLYN | New Building | Permit Issued | 03/21/2022 | 11/12/2025 | STRUCTURE FILED IN CONJUNCTION WITH NB # B00698118-I1 |
| B00722009 ↗ | 2363 BEDFORD AVENUE BROOKLYN | New Building | Permit Issued | 04/21/2022 | 11/12/2025 | STRUCTURE FILED IN CONJUNCTON WITH NB # B00722009-I1 |
| B00668047 ↗ | 33 4 STREET BROOKLYN | New Building | Permit Issued | 03/03/2022 | 09/03/2025 | TEMP STANDPIPE IN CONJUCTION WITH NEW BUILDING JOB NUMBER #B00668047-i1 |
| M00686955 ↗ | FREDERICK DOUGLASS BOULEVARD MANHATTAN | New Building | Permit Issued | 02/28/2022 | 08/05/2025 | SOE herewith filed in conjunction with NB job number M00686955-I1 |
| M01198865 ↗ | 255 WEST 34 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/25/2025 | — | — |
| Q00876748 ↗ | 38-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 05/26/2023 | 03/20/2025 | S.O.E. application filed in conjunction with NB # Q00872004 , FO# Q00876732. Work as per plans. |
| Q00887573 ↗ | 38-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/17/2023 | 03/20/2025 | UNDERPINNING. FILED IN CONJUNCTION WITH NB # Q00872004 ,Q00876732 & Q00876748. WORK AS PER PLANS. |
| Q00876732 ↗ | 38-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/27/2023 | 03/19/2025 | Foundation work, filed in conjunction with NB Q00872004. Work as per plans. |
| B00564411 ↗ | 570 FULTON STREET BROOKLYN | New Building | Permit Issued | 08/30/2021 | 11/15/2024 | Temporary standpipe application in conjunction to NB B00564411-I1 |
| Q00683048 ↗ | 39 AVENUE QUEENS | New Building | Permit Issued | 03/11/2022 | 06/02/2024 | Temporary standpipe application in conjunction with new building |
| Q00660436 ↗ | 2-24 26TH AVENUE QUEENS | New Building | Permit Issued | 02/03/2022 | 04/03/2024 | temporary standpipe filed in conjunction with NB. |
| Q00684765 ↗ | 32-03 39 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/10/2022 | 03/29/2024 | Temporary standpipe application in conjunction with vertical addition |
| B00717640 ↗ | 2363 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 04/14/2022 | 12/21/2023 | Foundation filed in conjunction with New Building GC B00722009-I1 |
| B00717638 ↗ | 2363 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 04/14/2022 | 12/08/2023 | SOE filed in conjunction with New Building GC # B00722009-I1 |
| X00680369 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 03/01/2022 | 10/20/2023 | Filed herewith foundation application in conjunction with NB#X00633905 |
| X00732116 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 05/10/2022 | 10/17/2023 | FO in conjunction with NB X00633905 |
| B00822033 ↗ | 931 CARROLL STREET BROOKLYN | Alteration | Signed-off | 02/13/2023 | 05/08/2023 | SOE work type hereby filed in conjunction with NB job number: 321080833 |
| X00564681 ↗ | 289 EAST 161 STREET BRONX | Alteration | Signed-off | 08/05/2021 | 05/04/2023 | Proposed SOE and Underpinning in Conjuction with New Building Job Number# 210181060. |
| B00589362 ↗ | 1807 66 STREET BROOKLYN | Alteration | Signed-off | 09/09/2021 | 06/23/2022 | TO FILE AN SOE APPLICATION IN CONJUNCTION WITH NB APPLICATION # 321600120 |
| Name | Jobs together | Most recent |
|---|---|---|
| FNA ENGINEERING SERVICES PC | 26 | 08/25/2026 |
| A&D ENGINEERING, PLLC | 16 | 08/25/2026 |
| NY BUILDING ASSOCIATES INC | 12 | 08/25/2026 |
| SEVERUD ASSOCIATES | 11 | 08/25/2026 |
| HAMISH WHITEFIELD ARCHITECTS P.C. | 9 | 08/25/2026 |
| S. WIEDER ARCHITECT P.C. | 5 | 08/06/2026 |
| TITAN ENGINEERS PC | 4 | 08/06/2026 |
| WEXLER ASSOCIATES | 3 | 07/23/2026 |
| HOWARD I SHAPIRO & ASSOCIATES | 2 | 08/25/2026 |
| VENTROP ENGINEERING CONSULTING GROU | 2 | 07/17/2026 |
| AKA STUDIO LLC | 1 | 07/07/2026 |
| AKF ENGINEERS, LLP | 1 | 03/11/2026 |
| BICALURO ASSOCIATES PC | 1 | 07/23/2026 |
| COSENTINI ASSOCIATES | 1 | 06/24/2026 |
| DESIMONE CONSULTING ENGINEERS | 1 | 07/07/2026 |
| FISCHER MAKOOI ARCHITECTS PLLC | 1 | 06/18/2026 |
| GKV ARCHITECTS | 1 | 07/17/2026 |
| HILL WEST ARCHITECTS | 1 | 07/23/2026 |
| HM LOKE CONSULTING ENGINEERING PC | 1 | 03/25/2025 |
| IMC ARCHITECTURE DPC | 1 | 03/18/2026 |
| K S K CONSTRUCTION GROUP | 1 | 07/07/2026 |
| MEHANDES ENGINEERING | 1 | 08/06/2026 |
| MJE PROFESSIONAL SERVICES | 1 | 06/18/2026 |
| MSA CONSULTING GROUP LLC | 1 | 07/07/2026 |
| ONSE | 1 | 03/11/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| DEVELOPING NY STATE LLC | 12 | 08/25/2026 |
| PRIME PIPING & HEATING IN | 12 | 08/25/2026 |
| MANHATTAN MANAGEMENT | 6 | 06/02/2026 |
| TRISTATE FIRE SPRINK INC | 6 | 08/06/2026 |
| SAFETY FIRE SPRINKLER COR | 4 | 08/25/2026 |
| NY DEVELOPERS & MANAGEMEN | 3 | 06/18/2026 |
| RFP CONSTRUCTION INC | 3 | 09/04/2024 |
| BEST MECHANICAL SVCS INC | 2 | 06/18/2026 |
| MILL BROOK FIRE PROTECTIO | 2 | 07/17/2026 |
| MPI PLUMBING CORP | 2 | 06/02/2026 |
| ACS SYSTEM ASSOCIATES INC | 1 | 07/07/2026 |
| ALLIANCE PLUMBING CORP | 1 | 03/11/2026 |
| ARC ELECTRICAL & MECH CON | 1 | 07/23/2026 |
| BEDROCK PLUMBING & HEATING INC | 1 | 06/24/2026 |
| BRUCHE MECHANICAL CORP | 1 | 06/17/2026 |
| CAULDWELL WINGATE CO LLC | 1 | 08/25/2026 |
| CHAMPION COMBUSTION CORP | 1 | 07/07/2026 |
| CONSIGLI CONSTRUCTION CO | 1 | 03/11/2026 |
| EAI INC EXEC ABATMNT IND | 1 | 07/07/2026 |
| ETHOS PLUMBING CORP | 1 | 07/17/2026 |
| F.S. SITE CORP | 1 | 07/23/2026 |
| FOLXCO LLC | 1 | 07/18/2023 |
| GREAT CITY MECHANICAL INC | 1 | 07/07/2026 |
| HALCYON CONST MGMT LLC | 1 | 03/18/2026 |
| HIRSCHI GROUP LLC | 1 | 08/06/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| DEVELOPING NY STATE | 12 | 08/25/2026 |
| DCO QOZB 38-15 QB, LLC | 3 | 09/04/2024 |
| 153 Hillside Avenue LLC | 1 | 06/24/2026 |
| 9032 QUEENS LLC | 1 | 07/17/2026 |
| BILL WOLF PETROLEUM CORP | 1 | 04/23/2026 |
| FSA CAPITAL LLC | 1 | 08/24/2022 |
| JIH BUILDERS GROUP LLC | 1 | 08/06/2026 |
| NEW YORK PRESBYTERIAN HOSPITAL | 1 | 03/11/2026 |
| NYC DEPARTMENT OF DESIGN AND CONSTR | 1 | 06/11/2026 |
| SPEARHEAD CONTRACTING LLC | 1 | 04/13/2026 |
| STREKTE | 1 | 07/18/2023 |
| Soriano Realty | 1 | 07/23/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| ADVANCED BUILDERS SERVICES | 19 | 08/25/2026 |
| SPEEDY EXPEDITING INC | 7 | 08/06/2026 |
| JM ZONING, LLC. | 4 | 07/17/2026 |
| GERALD J. CALIENDO R.A., P.C. | 3 | 09/04/2024 |
| CORE CONSULTANTS NYC | 2 | 03/18/2026 |
| MARIN ARCHITECTS, P.C. | 2 | 10/27/2023 |
| MUNICIPAL EXPEDITING INC | 2 | 06/11/2026 |
| BAC Developers Group | 1 | 06/18/2026 |
| DOMANI CONSULTING | 1 | 08/24/2022 |
| ENTHINK ENGINEERING LLC | 1 | 07/23/2026 |
| HOWARD I. SHAPIRO & ASSOCIATES | 1 | 03/11/2026 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/26/2026 | Subgrade Inspections | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 08/26/2026 | Concrete - Cast-In-Place | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 08/26/2026 | Final | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 08/26/2026 | Footing and Foundation | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 08/26/2026 | Footing and Foundation | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 08/26/2026 | Final | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 08/26/2026 | Final | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 08/26/2026 | Footing and Foundation | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 08/26/2026 | Concrete - Cast-In-Place | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 08/26/2026 | Deep Foundation Elements | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 08/26/2026 | Subgrade Inspections | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 08/26/2026 | Concrete - Cast-In-Place | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 08/26/2026 | Subgrade Inspections | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 07/30/2026 | Concrete - Cast-In-Place | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 07/30/2026 | Footing and Foundation | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 07/30/2026 | Final | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 07/30/2026 | Subgrade Inspections | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 07/30/2026 | Footing and Foundation | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 07/30/2026 | Final | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | progress |
| 07/30/2026 | Subgrade Inspections | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 07/30/2026 | Deep Foundation Elements | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 07/30/2026 | Concrete - Cast-In-Place | 362 LIVINGSTON STREET | Ahmed Abdelmohsen | special |
| 07/17/2026 | Excavations - Sheeting, Shoring, and Bracing | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | special |
| 06/30/2026 | Footing and Foundation | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | progress |
| 06/30/2026 | Final | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | progress |
| 06/30/2026 | Underpinning | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | special |
| 06/30/2026 | Structural Stability – Alterations of existing buildings | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | special |
| 06/22/2026 | Footing and Foundation | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | progress |
| 06/22/2026 | Final | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | progress |
| 06/22/2026 | Underpinning | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | special |
| 06/22/2026 | Structural Stability – Alterations of existing buildings | 153-02 HILLSIDE AVENUE | Ahmed Abdelmohsen | special |
| 06/18/2026 | Excavations - Sheeting, Shoring, and Bracing | 145-125 WHITE STREET | Ahmed Abdelmohsen | special |
| 06/11/2026 | Wall Panels, Curtain Walls, and Veneers | 2-24 26TH AVENUE | SOORJBALLY HARILALL | special |
| 06/11/2026 | Energy Code Compliance Inspections | 2-24 26TH AVENUE | Soorjbally Harilall | progress |
| 06/11/2026 | Fire-Resistance Rated Construction | 2-24 26TH AVENUE | Soorjbally Harilall | progress |
| 06/11/2026 | Lowest Floor Elevation | 2-24 26TH AVENUE | Soorjbally Harilall | progress |
| 06/11/2026 | Preliminary | 2-24 26TH AVENUE | Soorjbally Harilall | progress |
| 06/11/2026 | Fenestration air leakage | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Lighting controls | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Fenestration and door U-factor and product ratings | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Metering | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Air barrier — testing | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Interior lighting power | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Protection of exposed foundation insulation | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Exterior lighting power | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Insulation placement and R values | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Maintenance information | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Air barrier - visual inspection | 2-24 26TH AVENUE | — | energy_progress |
| 06/11/2026 | Lighting in dwelling units | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |
| 06/11/2026 | Fenestration areas | 2-24 26TH AVENUE | Soorjbally Harilall | energy_progress |