← Back
Special Inspection Agency
FUSION ARCHITECTURE, PLLC
Special Inspection Agency
QUEENS · 2
1 building
3
Total Filings
2
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
161-05 119 AVENUEQUEENS · latest 04/16/2021
2 projects
Key relationships
Everyone →
Owners
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00299484 ↗161-05 119 AVENUE
QUEENS
AlterationSigned-off02/14/202004/16/2021PLUMBING WORK FOR CONVERSION OF EXISTING 2-FAMILY DWELLING TO 1-FAMILY DWELLING.
Q00299489 ↗161-05 119 AVENUE
QUEENS
AlterationSigned-off02/14/202003/04/2021INSTALL NEW HVAC SYSTEM AND EXHAUST VENTS IN 1-FAMILY DWELLING
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
FOUR BROTHERS GENERAL CON102/14/2020
PRIME PIPING & HEATING IN105/12/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
QSAC, Inc205/12/2021
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00299484 ↗161-05 119 AVENUE
QUEENS
AlterationSigned-off02/14/202004/16/2021PLUMBING WORK FOR CONVERSION OF EXISTING 2-FAMILY DWELLING TO 1-FAMILY DWELLING.
Q00299489 ↗161-05 119 AVENUE
QUEENS
AlterationSigned-off02/14/202003/04/2021INSTALL NEW HVAC SYSTEM AND EXHAUST VENTS IN 1-FAMILY DWELLING
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
161-05 119 AVENUE ↗305/12/2021
▾Special Inspection Requirements — 1
DateRequirementBuildingInspectorRole
04/28/2021Fire-Resistant Penetrations and Joints161-05 119 AVENUEROBERT LAWRENCEspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
▸DOB NOWPlans/Sketch - Mechanical Systems1
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00299484-P1 · 161-05 119 AVENUEOpen ↗
08/28/2026Q00299484-I1 · 161-05 119 AVENUEOpen ↗
08/13/2026Q00299489-I1 · 161-05 119 AVENUEOpen ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q00299484-P1 · 161-05 119 AVENUEOpen ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026Q00299484-P1 · 161-05 119 AVENUEOpen ↗
08/15/2026Q00299484-I1 · 161-05 119 AVENUEOpen ↗
08/13/2026Q00299489-I1 · 161-05 119 AVENUEOpen ↗