← Back
Special Inspection Agency
HC PEC
Special Inspection Agency
MANHATTAN · 2
1 building
4
Total Filings
2
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
170 CENTRAL PARK WESTMANHATTAN · latest 01/30/2025
2 projects
Key relationships
Everyone →
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01008328 ↗170 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off01/29/202501/30/2025
Design HC PEC
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC …
M01008332 ↗170 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off01/29/202501/30/2025
Design HC PEC
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALT, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUIL…
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PJP INSTALLERS INC206/18/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
A1 EXPEDITING SERVICE CORP.106/18/2025
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01008328 ↗170 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off01/29/202501/30/2025
Design HC PEC
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC …
M01008332 ↗170 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off01/29/202501/30/2025
Design HC PEC
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALT, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUIL…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
170 CENTRAL PARK WEST ↗406/18/2025
▾Special Inspection Requirements — 3
DateRequirementBuildingInspectorRole
06/23/2025Post-installed Anchors170 CENTRAL PARK WESTARAMIS HERNANDEZspecial
02/20/2025Post-installed Anchors170 CENTRAL PARK WESTARAMIS HERNANDEZspecial
01/16/2025Post-installed Anchors170 CENTRAL PARK WESTARAMIS HERNANDEZspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M01008328-P1 · 170 CENTRAL PARK WESTOpen ↗
08/13/2026M01008332-I1 · 170 CENTRAL PARK WESTOpen ↗
08/13/2026M01008328-I1 · 170 CENTRAL PARK WESTOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01008332-I1 · 170 CENTRAL PARK WESTOpen ↗
08/27/2026M01008328-P1 · 170 CENTRAL PARK WESTOpen ↗
08/22/2026M01008328-I1 · 170 CENTRAL PARK WESTOpen ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M01008332-I1 · 170 CENTRAL PARK WESTOpen ↗
08/13/2026M01008328-P1 · 170 CENTRAL PARK WESTOpen ↗
08/13/2026M01008328-P2 · 170 CENTRAL PARK WESTOpen ↗
Showing 3 of 4 on file for this type