← Back
Special Inspection Agency
JATTUSO ARCHITECTURE PLLC
Special Inspection Agency
3 projects with open permitsMANHATTAN · 7BROOKLYN · 1
7 buildings
9
Total Filings
8
Projects on File
7
Buildings Worked
3
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month8 projects all-time
0123Aug '20 · 1Jun '21 · 1Jul '21 · 2Jul '23 · 1Jul '24 · 1Aug '24 · 1Jun '25 · 120212022202320242025
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit338%
Signed off562%
By project type
Alteration8
Most active buildings
All buildings →
331 EAST 115 STREETMANHATTAN · latest 08/10/2021
2 projects
222 CENTRAL PARK SOUTHMANHATTAN · 1 open · latest 01/06/2026
1 projects
33 WEST 89 STREETMANHATTAN · 1 open · latest 11/13/2025
1 projects
411 WEST END AVENUEMANHATTAN · latest 09/10/2024
1 projects
453 FDR DRIVEMANHATTAN · 1 open · latest 08/18/2023
1 projects
125 MAIDEN LANEMANHATTAN · latest 02/10/2022
1 projects
Key relationships
Everyone →
Filing representatives
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01227178 ↗222 CENTRAL PARK SOUTH
MANHATTAN
AlterationPermit Issued06/12/202501/06/2026PLUMBING MODIFICATIONS ASSOCIATED WITH INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01091285 ↗33 WEST 89 STREET
MANHATTAN
AlterationPermit Issued08/06/202411/13/2025
Contractor CLARKES EMPIRE
Installation of new sheetrock throughout the ceiling and walls from the first floor to the fourth floor. New sheetrock in the boiler room. …
M01068455 ↗411 WEST END AVENUE
MANHATTAN
AlterationSigned-off07/23/202409/10/2024FILING HEREWITH FOR THE RENOVATIONS TO THE KITCHEN AND MASTER SUITE AND UPGRADED FINISHES THROUGHOUT. THERE IS NO CHANGE OF USE, OCCUPANCY O…
M00903906 ↗453 FDR DRIVE
MANHATTAN
AlterationPermit Issued07/18/202308/18/2023Fling herewith for the renovation of apt E205 .Modifications to existing plumbing system
B00381078 ↗119 SKILLMAN AVENUE
BROOKLYN
AlterationSigned-off08/18/202003/22/2023INSTALLATION,RELOCATION, AND THE REPLACEMENT OF PLUMBING FIXTURES AND RELATED PIPING
M00524818 ↗125 MAIDEN LANE
MANHATTAN
AlterationSigned-off06/07/202102/10/2022
Contractor CONPERM CORP
General construction work to include interior renovations as shown on plans. No change in use, egress, and occupancy.
Counts cover all 8 projects (8 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JATTUSO ARCHITECTURE708/10/2026
GOLDMAN COPELAND ASSOCIATES107/08/2021
HIGH LINE ENGINEERING PC108/10/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
A&A PLUMBING CORP107/08/2021
AC SOLUTION SERVICES LLC108/10/2026
CLARKES EMPIRE INC108/06/2024
COBALT MECHANICAL INC105/11/2023
CONPERM CORP106/07/2021
DFE CONTRACTOR LLC107/19/2023
FOLOR INC107/08/2021
L & N CONSTRUCTION INTERI107/23/2024
OCEAN PACIFIC INTERIORS *108/06/2024
REIDBUILD CONSULTANCY LLC108/10/2026
SIGNORE & SONS PLBG CORP107/19/2023
UNIPIPE PLBG&HTG CORP108/10/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
E.B. Mahoney Builders108/10/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CONVERSANO ASSOCIATES, INC.308/10/2026
WILLIAM VITACCO ASSOCIATES307/08/2021
8 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 8Open permit 3Signed off 5
8 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01227178 ↗222 CENTRAL PARK SOUTH
MANHATTAN
AlterationPermit Issued06/12/202501/06/2026PLUMBING MODIFICATIONS ASSOCIATED WITH INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01091285 ↗33 WEST 89 STREET
MANHATTAN
AlterationPermit Issued08/06/202411/13/2025
Contractor CLARKES EMPIRE
Installation of new sheetrock throughout the ceiling and walls from the first floor to the fourth floor. New sheetrock in the boiler room. …
M01068455 ↗411 WEST END AVENUE
MANHATTAN
AlterationSigned-off07/23/202409/10/2024FILING HEREWITH FOR THE RENOVATIONS TO THE KITCHEN AND MASTER SUITE AND UPGRADED FINISHES THROUGHOUT. THERE IS NO CHANGE OF USE, OCCUPANCY O…
M00903906 ↗453 FDR DRIVE
MANHATTAN
AlterationPermit Issued07/18/202308/18/2023Fling herewith for the renovation of apt E205 .Modifications to existing plumbing system
B00381078 ↗119 SKILLMAN AVENUE
BROOKLYN
AlterationSigned-off08/18/202003/22/2023INSTALLATION,RELOCATION, AND THE REPLACEMENT OF PLUMBING FIXTURES AND RELATED PIPING
M00524818 ↗125 MAIDEN LANE
MANHATTAN
AlterationSigned-off06/07/202102/10/2022
Contractor CONPERM CORP
General construction work to include interior renovations as shown on plans. No change in use, egress, and occupancy.
M00545311 ↗331 EAST 115 STREET
MANHATTAN
AlterationSigned-off07/08/202108/10/2021plumbing work for existing office renovation.
M00545300 ↗331 EAST 115 STREET
MANHATTAN
AlterationSigned-off07/08/202107/27/2021
Contractor FOLOR INC
interior renovation to existing office space. no change to use, egress or occupancy
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
222 CENTRAL PARK SOUTH ↗106/12/2025
33 WEST 89 STREET ↗108/06/2024
411 WEST END AVENUE ↗107/23/2024
453 FDR DRIVE ↗107/18/2023
119 SKILLMAN AVENUE ↗205/11/2023
331 EAST 115 STREET ↗207/08/2021
125 MAIDEN LANE ↗106/07/2021
▾Special Inspection Requirements — 20
DateRequirementBuildingInspectorRole
05/16/2025Fire-Resistant Penetrations and Joints222 CENTRAL PARK SOUTHJoseph Jattusospecial
05/16/2025Final222 CENTRAL PARK SOUTHJoseph Jattusoprogress
07/01/2024Fire-Resistant Penetrations and Joints411 WEST END AVENUEJoseph Jattusospecial
07/01/2024Lighting in dwelling units411 WEST END AVENUEJoseph Jattusoenergy_progress
06/18/2024Final411 WEST END AVENUEJoseph Jattusoprogress
07/13/2023Fire-Resistant Penetrations and Joints453 FDR DRIVEJoseph Jattusospecial
07/13/2023Final453 FDR DRIVEJoseph Jattusoprogress
07/13/2023Energy Code Compliance Inspections453 FDR DRIVEJoseph Jattusoprogress
07/13/2023Lighting in dwelling units453 FDR DRIVEJoseph Jattusoenergy_progress
05/16/2023Fire-Resistant Penetrations and Joints119 SKILLMAN AVENUEJoseph Jattusospecial
05/04/2023Fire-Resistant Penetrations and Joints119 SKILLMAN AVENUEJoseph Jattusospecial
06/29/2021Fire-Resistant Penetrations and Joints331 EAST 115 STREETJoseph Jattusospecial
06/29/2021Interior lighting power331 EAST 115 STREETJoseph Jattusoenergy_progress
06/29/2021Lighting controls331 EAST 115 STREETJoseph Jattusoenergy_progress
06/29/2021Final331 EAST 115 STREETJoseph Jattusoprogress
06/29/2021Fire-Resistant Penetrations and Joints331 EAST 115 STREETJoseph Jattusospecial
05/19/2021Fire-Resistance Rated Construction125 MAIDEN LANEJoseph Jattusoprogress
05/19/2021Energy Code Compliance Inspections125 MAIDEN LANEJoseph Jattusoprogress
05/19/2021Final125 MAIDEN LANEJoseph Jattusoprogress
05/19/2021Fire-Resistant Penetrations and Joints125 MAIDEN LANEJoseph Jattusospecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
09/03/2026M00524818-I1 · 125 MAIDEN LANERequest digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026M01227178-I1 · 222 CENTRAL PARK SOUTHOpen ↗
08/13/2026M01068455-I1 · 411 WEST END AVENUEOpen ↗
08/13/2026M01091285-I1 · 33 WEST 89 STREETOpen ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026M00903906-S1 · 453 FDR DRIVEOpen ↗
08/29/2026M00903906-I1 · 453 FDR DRIVEOpen ↗
08/26/2026M01068455-I1 · 411 WEST END AVENUEOpen ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M01068455-I1 · 411 WEST END AVENUEOpen ↗
09/01/2026M01068455-I1 · 411 WEST END AVENUEOpen ↗
08/29/2026M01227178-I1 · 222 CENTRAL PARK SOUTHOpen ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00381078-P1 · 119 SKILLMAN AVENUEOpen ↗
09/01/2026M01068455-I1 · 411 WEST END AVENUEOpen ↗
08/29/2026M01227178-I1 · 222 CENTRAL PARK SOUTHOpen ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/29/2026M00903906-S1 · 453 FDR DRIVEOpen ↗
08/29/2026M00903906-I1 · 453 FDR DRIVEOpen ↗
08/26/2026M01068455-I1 · 411 WEST END AVENUEOpen ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00545300-I1 · 331 EAST 115 STREETOpen ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M00545300-I1 · 331 EAST 115 STREETOpen ↗
08/13/2026M00545311-I1 · 331 EAST 115 STREETOpen ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M01227178-I1 · 222 CENTRAL PARK SOUTHOpen ↗