← Back
Special Inspection Agency
KHACHATURIAN ENGINEERING
Special Inspection Agency
MANHATTAN · 1
1 building
2
Total Filings
1
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off1100%
By project type
Alteration1
Most active buildings
All buildings →
11 AVENUE CMANHATTAN · latest 11/30/2021
1 projects
Key relationships
Everyone →
Filing representatives
Contractors
1 projects
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00607899 ↗11 AVENUE C
MANHATTAN
AlterationSigned-off11/08/202111/30/2021
Contractor 1 ARBOR LLC
Installation of mechanical equipment as per plans.
Counts cover all 1 projects (1 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
KHACHATURIAN ENGINEERING ASSOCIATES102/28/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
1 ARBOR LLC102/28/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
350 EAST HOUSTON LLC102/28/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JAM CONSULTANTS, INC.102/28/2022
1 DOB NOW project, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 1Signed off 1
1 project
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00607899 ↗11 AVENUE C
MANHATTAN
AlterationSigned-off11/08/202111/30/2021
Contractor 1 ARBOR LLC
Installation of mechanical equipment as per plans.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
11 AVENUE C ↗202/28/2022
▾Special Inspection Requirements — 18
DateRequirementBuildingInspectorRole
03/01/2022Ventilation and air distribution system11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022Electrical motors and elevators11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022Maintenance information11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022Shutoff dampers11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022HVAC-R and service water piping design and insulation11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022HVAC-R and service water heating equipment11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022HVAC-R and service water heating system controls11 AVENUE CARMEN KHACHATURIANenergy_progress
03/01/2022Mechanical Systems11 AVENUE CARMEN KHACHATURIANspecial
03/01/2022Final11 AVENUE CARMEN KHACHATURIANprogress
02/28/2022Mechanical Systems11 AVENUE CARMEN KHACHATURIANspecial
02/28/2022Final11 AVENUE CARMEN KHACHATURIANprogress
02/28/2022HVAC-R and service water piping design and insulation11 AVENUE CARMEN KHACHATURIANenergy_progress
02/28/2022Electrical motors and elevators11 AVENUE CARMEN KHACHATURIANenergy_progress
02/28/2022Shutoff dampers11 AVENUE CARMEN KHACHATURIANenergy_progress
02/28/2022Ventilation and air distribution system11 AVENUE CARMEN KHACHATURIANenergy_progress
02/28/2022Maintenance information11 AVENUE CARMEN KHACHATURIANenergy_progress
02/28/2022HVAC-R and service water heating equipment11 AVENUE CARMEN KHACHATURIANenergy_progress
02/28/2022HVAC-R and service water heating system controls11 AVENUE CARMEN KHACHATURIANenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00607899-I1 · 11 AVENUE CRequest digital key ↗
09/03/2026M00607899-P1 · 11 AVENUE CRequest digital key ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M00607899-P1 · 11 AVENUE COpen ↗
09/01/2026M00607899-P1 · 11 AVENUE COpen ↗
09/01/2026M00607899-P1 · 11 AVENUE COpen ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/03/2026M00607899-I1 · 11 AVENUE COpen ↗
09/03/2026M00607899-P1 · 11 AVENUE COpen ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00607899-P1 · 11 AVENUE COpen ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos2
▸DOB NOWOER: Notice to Proceed1
09/03/2026M00607899-I1 · 11 AVENUE COpen ↗
▸DOB NOWOER: Notice of Satisfaction1
09/03/2026M00607899-I1 · 11 AVENUE COpen ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00607899-I1 · 11 AVENUE COpen ↗