← Back
Special Inspection Agency
MG ARCHITECTURE URBANISM
Special Inspection Agency
2 projects with open permitsMANHATTAN · 8QUEENS · 1
5 buildings
29
Total Filings
9
Projects on File
5
Buildings Worked
2
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month9 projects all-time
0123Jun '20 · 2Apr '21 · 1Oct '21 · 1Mar '22 · 1Sep '22 · 1Apr '23 · 1Jan '24 · 1Jun '24 · 12021202220232024
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit222%
Signed off667%
Filed only111%
By project type
Alteration8
Alteration CO1
Most active buildings
All buildings →
55 EAST 59 STREETMANHATTAN · 2 open · latest 06/26/2026
3 projects
35 WEST 36TH STMANHATTAN · latest 09/28/2022
2 projects
2091 BROADWAYMANHATTAN · latest 06/30/2021
2 projects
5 EAST 22 STREETMANHATTAN · latest 02/07/2024
1 projects
142-41 ROOSEVELT AVENUEQUEENS · latest 02/18/2022
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00839604 ↗55 EAST 59 STREET
MANHATTAN
AlterationPermit Issued04/07/202306/26/2026INTERIOR FIT-OUT OF DELI (EATING AND DRINKING ESTABLISHMENT) ON THE FIRST FLOOR, CELLAR, & MEZZANINE AS PER PLANS FILED HEREWITH. NO CHANGE …
M00945950 ↗55 EAST 59 STREET
MANHATTAN
Alteration COPermit Issued06/03/202408/25/2025Mechancial work as shown on plans
M00983297 ↗5 EAST 22 STREET
MANHATTAN
AlterationSigned-off01/16/202402/07/2024PLUMBING WORK IN APT. 11S. WORK INCLUDE REPLACE SINK AND DISHWASHER, REPLACE BATHROOM FIXTURES, REPLACEALL BRANCH PIPING TO THE RISER, INSTA…
M08008048 ↗35 WEST 36TH ST
MANHATTAN
AlterationSigned-off09/22/202209/28/2022
Contractor MXP LLC
INTERIOR RENOVATIONS OF OFFICE SPACE ON THE FOURTH FLOOR (4E) WITH MILLWORKS AND PARTITION WALL WORK.
M00706765 ↗35 WEST 36TH ST
MANHATTAN
AlterationSigned-off03/28/202204/13/2022
Contractor MXP LLC
INTERIOR RENOVATIONS OF OFFICE SPACE ON THE THIRD FLOOR WITH MILLWORKS, PLUMBING, AND PARTITION WALL WORK.
Q00613200 ↗142-41 ROOSEVELT AVENUE
QUEENS
AlterationSigned-off10/19/202102/18/2022INTERIOR RENOVATION OF EXISTING SUPERMARKET SPACE ON FIRST FLOOR AND EXISTING STORAGE SPACE ON CELLAR. INSTALLATION OF INTERIOR PARTITIONS, …
Counts cover all 9 projects (9 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DKA CONSULTING P.C.406/10/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MXP LLC301/16/2024
AVON PLBG & HTG INC204/23/2026
FRESH AIRE MECHANICAL INC206/10/2026
I DO PLUMBING & HTG INC206/10/2026
JW CONTRACTOR INC206/10/2026
AMERICAN STANDARD P&H COR101/16/2024
ARIANA CONTRACTING INC103/28/2022
HI-TECH C.P.M. CORP101/27/2024
JTJ STUDIO CORP106/24/2024
MUHAN SPACE CORP104/23/2026
POWER PLUMBING & HEATING106/13/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
RUTGERS PRESBYTERIAN CHURCH206/24/2024
EMERICK GROSS REAL ESTATE,LP101/27/2024
FRIEDLAND PROPERTIES106/10/2026
HIDROCK PROPERTIES INC.103/28/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
WILLIAM VITACCO ASSOCIATES106/10/2026
9 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 9Open permit 2Signed off 6Filed only 1
Any typeAlteration 8Alteration CO 1
9 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00839604 ↗55 EAST 59 STREET
MANHATTAN
AlterationPermit Issued04/07/202306/26/2026INTERIOR FIT-OUT OF DELI (EATING AND DRINKING ESTABLISHMENT) ON THE FIRST FLOOR, CELLAR, & MEZZANINE AS PER PLANS FILED HEREWITH. NO CHANGE …
M00945950 ↗55 EAST 59 STREET
MANHATTAN
Alteration COPermit Issued06/03/202408/25/2025Mechancial work as shown on plans
M00983297 ↗5 EAST 22 STREET
MANHATTAN
AlterationSigned-off01/16/202402/07/2024PLUMBING WORK IN APT. 11S. WORK INCLUDE REPLACE SINK AND DISHWASHER, REPLACE BATHROOM FIXTURES, REPLACEALL BRANCH PIPING TO THE RISER, INSTA…
M08008048 ↗35 WEST 36TH ST
MANHATTAN
AlterationSigned-off09/22/202209/28/2022
Contractor MXP LLC
INTERIOR RENOVATIONS OF OFFICE SPACE ON THE FOURTH FLOOR (4E) WITH MILLWORKS AND PARTITION WALL WORK.
M00706765 ↗35 WEST 36TH ST
MANHATTAN
AlterationSigned-off03/28/202204/13/2022
Contractor MXP LLC
INTERIOR RENOVATIONS OF OFFICE SPACE ON THE THIRD FLOOR WITH MILLWORKS, PLUMBING, AND PARTITION WALL WORK.
Q00613200 ↗142-41 ROOSEVELT AVENUE
QUEENS
AlterationSigned-off10/19/202102/18/2022INTERIOR RENOVATION OF EXISTING SUPERMARKET SPACE ON FIRST FLOOR AND EXISTING STORAGE SPACE ON CELLAR. INSTALLATION OF INTERIOR PARTITIONS, …
M00348778 ↗2091 BROADWAY
MANHATTAN
AlterationSigned-off06/01/202006/30/2021NEW INSTALLATION/MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY …
M00496553 ↗55 EAST 59 STREET
MANHATTAN
AlterationFiled — no permit on record04/05/2021——
M00348801 ↗2091 BROADWAY
MANHATTAN
AlterationSigned-off06/08/202006/10/2020
Contractor JTJ STUDIO CORP
INSTALLATION OF NEW MECHANICAL EXHAUST SYSTEM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH …
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
55 EAST 59 STREET ↗1306/10/2026
2091 BROADWAY ↗506/24/2024
142-41 ROOSEVELT AVENUE ↗701/27/2024
5 EAST 22 STREET ↗201/16/2024
35 WEST 36TH ST ↗209/22/2022
▾Special Inspection Requirements — 116
DateRequirementBuildingInspectorRole
06/11/2026Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
06/08/2026Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
04/23/2026Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
04/23/2026Sprinkler Systems55 EAST 59 STREETDamon Amadiospecial
04/23/2026Energy Code Compliance Inspections55 EAST 59 STREETDamon Amadioprogress
04/23/2026HVAC-R and service water heating system controls55 EAST 59 STREETDamon Amadioenergy_progress
04/23/2026Maintenance information55 EAST 59 STREETDamon Amadioenergy_progress
04/23/2026HVAC-R and service water heating equipment55 EAST 59 STREETDamon Amadioenergy_progress
04/23/2026HVAC-R and service water piping design and insulation55 EAST 59 STREETDamon Amadioenergy_progress
04/21/2026Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
04/21/2026Sprinkler Systems55 EAST 59 STREETDamon Amadiospecial
04/21/2026Energy Code Compliance Inspections55 EAST 59 STREETDamon Amadioprogress
04/21/2026HVAC-R and service water piping design and insulation55 EAST 59 STREETDamon Amadioenergy_progress
04/21/2026HVAC-R and service water heating equipment55 EAST 59 STREETDamon Amadioenergy_progress
04/21/2026HVAC-R and service water heating system controls55 EAST 59 STREETDamon Amadioenergy_progress
04/21/2026Maintenance information55 EAST 59 STREETDamon Amadioenergy_progress
12/03/2025Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
06/26/2025Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
07/11/2024HVAC-R and service water heating system controls55 EAST 59 STREETPETER PARKenergy_progress
07/11/2024HVAC-R and service water heating equipment55 EAST 59 STREETPETER PARKenergy_progress
05/02/2024Duct leakage testing, insulation and design55 EAST 59 STREETPETER PARKenergy_progress
05/02/2024Shutoff dampers55 EAST 59 STREETPETER PARKenergy_progress
05/02/2024Maintenance information55 EAST 59 STREETPETER PARKenergy_progress
05/02/2024HVAC-R and service water piping design and insulation55 EAST 59 STREETPETER PARKenergy_progress
05/02/2024Fire-Resistant Penetrations and Joints55 EAST 59 STREETPETER PARKspecial
01/29/2024HVAC-R and service water piping design and insulation142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
01/29/2024Shutoff dampers142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
01/29/2024Maintenance information142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
01/29/2024HVAC-R and service water heating system controls142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
01/29/2024Duct leakage testing, insulation and design142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
01/29/2024HVAC-R and service water heating equipment142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
01/29/2024Energy Code Compliance Inspections142-41 ROOSEVELT AVENUEDamon Amadioprogress
01/29/2024Final142-41 ROOSEVELT AVENUEDamon Amadioprogress
01/29/2024Mechanical Systems142-41 ROOSEVELT AVENUEDamon Amadiospecial
01/29/2024Fire-Resistant Penetrations and Joints142-41 ROOSEVELT AVENUEPETER PARKspecial
01/16/2024Fire-Resistant Penetrations and Joints5 EAST 22 STREETPETER PARKspecial
01/16/2024Fire-Resistant Penetrations and Joints5 EAST 22 STREETPETER PARKspecial
12/28/2023Lighting controls5 EAST 22 STREETPETER PARKenergy_progress
12/28/2023Interior lighting power5 EAST 22 STREETPETER PARKenergy_progress
12/28/2023Final5 EAST 22 STREETPETER PARKprogress
12/28/2023Energy Code Compliance Inspections5 EAST 22 STREETPETER PARKprogress
10/10/2023Mechanical Systems55 EAST 59 STREETPETER PARKspecial
10/10/2023Final55 EAST 59 STREETPETER PARKprogress
09/13/2023Fire-Resistant Penetrations and Joints142-41 ROOSEVELT AVENUEPETER PARKspecial
09/13/2023Mechanical Systems142-41 ROOSEVELT AVENUEDamon Amadiospecial
09/13/2023Energy Code Compliance Inspections142-41 ROOSEVELT AVENUEDamon Amadioprogress
09/13/2023Final142-41 ROOSEVELT AVENUEDamon Amadioprogress
09/13/2023HVAC-R and service water heating system controls142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
09/13/2023HVAC-R and service water heating equipment142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
09/13/2023Duct leakage testing, insulation and design142-41 ROOSEVELT AVENUEDamon Amadioenergy_progress
Latest 50 of 116.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch25
09/02/2026M00706765-I1 · 35 WEST 36TH STRequest digital key ↗
09/02/2026M00706765-S1 · 35 WEST 36TH STRequest digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00348778-P3 · 2091 BROADWAYRequest digital key ↗
09/04/2026M00348778-I1 · 2091 BROADWAYRequest digital key ↗
09/04/2026M00348778-P2 · 2091 BROADWAYRequest digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00348801-I1 · 2091 BROADWAYRequest digital key ↗
09/04/2026M00348801-P1 · 2091 BROADWAYRequest digital key ↗
08/15/2026M00348801-P1 · 2091 BROADWAYRequest digital key ↗
▸Seals & Professional Certifications132
▸DOB NOWProgress Inspector Seal & Signature64
09/30/2026M00945950-S1 · 55 EAST 59 STREETOpen ↗
09/30/2026M00945950-S1 · 55 EAST 59 STREETOpen ↗
09/30/2026M00945950-S1 · 55 EAST 59 STREETOpen ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/30/2026M00945950-S1 · 55 EAST 59 STREETOpen ↗
09/30/2026M00945950-S1 · 55 EAST 59 STREETOpen ↗
09/27/2026Q00613200-P2 · 142-41 ROOSEVELT AVENUEOpen ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/04/2026M00348778-I1 · 2091 BROADWAYOpen ↗
09/04/2026M00348778-P3 · 2091 BROADWAYOpen ↗
09/04/2026M00348778-P2 · 2091 BROADWAYOpen ↗
Showing 3 of 30 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/04/2026M00348778-I1 · 2091 BROADWAYOpen ↗
09/04/2026M00348778-P3 · 2091 BROADWAYOpen ↗
09/04/2026M00348778-P2 · 2091 BROADWAYOpen ↗
Showing 3 of 30 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
09/02/2026M00706765-I1 · 35 WEST 36TH STOpen ↗
Showing 1 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type