← Back
Special Inspection Agency
MICHAEL MEGALLA, P.E.
Special Inspection Agency
20 jobs with open permitsBRONX · 20BROOKLYN · 11MANHATTAN · 6
29 buildings
77
Total Filings
42
Jobs on File
29
Buildings Worked
20
Jobs w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Jobs by first filing month42 jobs all-time
0134Jan '20 · 1Feb '21 · 1Mar '21 · 2Oct '21 · 3Feb '22 · 1Apr '22 · 1Jun '22 · 1Jul '22 · 2Oct '22 · 1Nov '22 · 1Jan '23 · 1Mar '23 · 1Oct '23 · 1Dec '23 · 1Jun '24 · 1Jul '24 · 1Aug '24 · 1Sep '24 · 3Nov '24 · 1Dec '24 · 1Jan '25 · 2Feb '25 · 1Mar '25 · 1May '25 · 1Jun '25 · 1Aug '25 · 1Sep '25 · 1Nov '25 · 2May '26 · 1Jun '26 · 2Jul '26 · 32020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit2048%
Signed off1638%
Filed only614%
By job type
Alteration38
Alteration CO4
Most active buildings
All buildings →
308 SOUNDVIEW AVENUEBRONX · latest 11/09/2023
4 jobs
2804 EMMONS AVENUEBROOKLYN · 1 open · latest 11/29/2022
3 jobs
401 EAST 50 STREETMANHATTAN · 2 open · latest 09/13/2022
2 jobs
4126 BROADWAYMANHATTAN · 1 open · latest 10/21/2024
2 jobs
888 GRAND CONCOURSEBRONX · 1 open · latest 06/04/2025
2 jobs
701 RHINELANDER AVENUEBRONX · latest 04/05/2023
2 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
B01311638 ↗6918 FT HAMILTON PARKWAY
BROOKLYN
Alteration COPermit Issued11/08/202509/01/2026CONVERT 1ST FLOOR APARTMENT TO STORE
M01397143 ↗623 9 AVENUE
MANHATTAN
AlterationPermit Issued05/06/202608/14/2026RENOVATE EXISTING 1ST FLOOR STORE TO NEW DELI/ BAKERY STORE. RELOCATE THE PROPOSED BATHROOM
X01429657 ↗1624 CROSBY AVENUE
BRONX
AlterationPermit Issued07/14/202607/31/2026INSTALL BACKFLOW PREVENTER VALVE (RPZ) IN THE EXISTING WATER SYSTEM AT THE CELLAR
Q01423765 ↗84-34 SMEDLEY STREET
QUEENS
AlterationPermit Issued06/30/202607/30/2026TO AMEND THE GAS USAGE IN APPLICATION Q01423765-S2 TO INCLUDE GAS COOKING EQUIPMENT (RESIDENTIAL)
Q01424074 ↗32-50 104 STREET
QUEENS
AlterationFiled — no permit on record07/23/2026——
X01424275 ↗1052 BRINSMADE AVENUE
BRONX
AlterationPermit Issued07/06/202607/21/2026PLUMBER WORK FOR NEW BATHROOM AT THE FIRST-FLOOR FAMILY ROOM
Counts cover all 42 jobs (42 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
42 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 42Open permit 20Signed off 16Filed only 6
Any typeAlteration 38Alteration CO 4
42 jobs
JobAddressTypeStatusFiledLatest permitDescription
B01311638 ↗6918 FT HAMILTON PARKWAY
BROOKLYN
Alteration COPermit Issued11/08/202509/01/2026CONVERT 1ST FLOOR APARTMENT TO STORE
M01397143 ↗623 9 AVENUE
MANHATTAN
AlterationPermit Issued05/06/202608/14/2026RENOVATE EXISTING 1ST FLOOR STORE TO NEW DELI/ BAKERY STORE. RELOCATE THE PROPOSED BATHROOM
X01429657 ↗1624 CROSBY AVENUE
BRONX
AlterationPermit Issued07/14/202607/31/2026INSTALL BACKFLOW PREVENTER VALVE (RPZ) IN THE EXISTING WATER SYSTEM AT THE CELLAR
Q01423765 ↗84-34 SMEDLEY STREET
QUEENS
AlterationPermit Issued06/30/202607/30/2026TO AMEND THE GAS USAGE IN APPLICATION Q01423765-S2 TO INCLUDE GAS COOKING EQUIPMENT (RESIDENTIAL)
Q01424074 ↗32-50 104 STREET
QUEENS
AlterationFiled — no permit on record07/23/2026——
X01424275 ↗1052 BRINSMADE AVENUE
BRONX
AlterationPermit Issued07/06/202607/21/2026PLUMBER WORK FOR NEW BATHROOM AT THE FIRST-FLOOR FAMILY ROOM
B01409115 ↗207 BERKELEY PLACE
BROOKLYN
Alteration COFiled — no permit on record06/08/2026——
X08010930 ↗1106 MORRIS AVENUE
BRONX
AlterationPermit Issued11/01/202203/09/2026To inspect the existing sprinkler system in the existing laundry.
M01216675 ↗309 EAST 115 STREET
MANHATTAN
AlterationPermit Issued08/04/202512/17/2025NEW GAS PIPE FOR THE APPROVED NEW MOUNTED CEILING HEATERS
X01196511 ↗3730 LACONIA AVENUE
BRONX
AlterationSigned-off09/04/202512/05/2025NEW HVAC DUCTLESS SPLIT SYSTEM
B01312097 ↗6918 FT HAMILTON PARKWAY
BROOKLYN
AlterationFiled — no permit on record11/08/2025——
S01122345 ↗351 BADEN PLACE
STATEN ISLAND
AlterationSigned-off11/02/202410/30/2025TO REINSTATE BIS APPROVED JOB # 540186341
X01192937 ↗3730 LACONIA AVENUE
BRONX
Alteration COPermit Issued03/26/202509/05/2025RENOVATE 1ST FLOOR TO CREATE AN APARTMENT
X01156042 ↗888 GRAND CONCOURSE
BRONX
AlterationFiled — no permit on record06/04/2025——
Q01185189 ↗89-11 138 STREET
QUEENS
Alteration COPermit Issued02/26/202506/02/2025Renovate 1st Floor Apartment and Change the Use to Community Facility Dentist Office
B01211908 ↗553 63 STREET
BROOKLYN
AlterationFiled — no permit on record05/23/2025——
B01157356 ↗292 ATLANTIC AVENUE
BROOKLYN
AlterationSigned-off01/20/202502/21/2025PROVIDE NEW SINK
X01152597 ↗888 GRAND CONCOURSE
BRONX
AlterationPermit Issued01/10/202502/06/2025RENOVATE EXISTING STORE
B01157350 ↗292 ATLANTIC AVENUE
BROOKLYN
AlterationPermit Issued12/20/202401/16/2025RENOVATE EXISTING STORE
X01109660 ↗751 ALLERTON AVENUE
BRONX
AlterationSigned-off09/30/202412/02/2024NEW BATH IN THE DELI STORE
X01111532 ↗2862 PARK AVENUE
BRONX
AlterationPermit Issued09/27/202411/01/2024RENOVATE EXISTING STORE TO CREPE STORE
M01103906 ↗4126 BROADWAY
MANHATTAN
AlterationSigned-off09/13/202410/21/2024Renovate Existing Laundry Store - Plumbing work
X01096134 ↗751 ALLERTON AVENUE
BRONX
AlterationPermit Issued08/27/202409/20/2024Renovate Existing store and create new bathroom
M01067348 ↗4126 BROADWAY
MANHATTAN
AlterationPermit Issued07/03/202408/23/2024Renovate Exiting Laundry Store
X01058630 ↗2705 WILLIAMSBRIDGE ROAD
BRONX
AlterationSigned-off06/05/202407/24/2024Replace the defected lintel at 2nd floor and repair the cracks. No change in use, egress or occupation.
X00981606 ↗762 ALLERTON AVENUE
BRONX
AlterationPermit Issued12/26/202312/29/2023Renovate existing store including storefront, finish floor and drop ceiling.
X00948928 ↗308 SOUNDVIEW AVENUE
BRONX
AlterationSigned-off10/18/202311/09/2023RELOCATE EXISTING PARTITION WALL IN CONSULTANT ROOM TO CREATE FLUOROSCOPY ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00727311 ↗1905 HUNT AVENUE
BRONX
AlterationSigned-off06/08/202207/27/2023Repair the cracks in the north sidewall and replace deteriorated lintels/sills. provide stucco on the entire sidewall.
X00804320 ↗1800 MULINER AVENUE
BRONX
AlterationPermit Issued01/02/202304/24/2023Renovate Existing 1 st (ground) floor Store and its StoreFront
X00490785 ↗701 RHINELANDER AVENUE
BRONX
AlterationSigned-off03/29/202104/05/2023INSTALL NEW GAS BOILER, GAS WATER HEATER AND 3-PIECES BATHROOM FIXTURES IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00839781 ↗44-10 KETCHAM STREET
QUEENS
AlterationFiled — no permit on record03/22/2023——
B00598115 ↗8413 18 AVENUE
BROOKLYN
AlterationPermit Issued10/22/202103/16/2023MODIFY THE EXISTING STOREFRONT. NO CHANGE IN USE, EXIST OR OCCUPANCY.
B08007408 ↗2804 EMMONS AVENUE
BROOKLYN
AlterationPermit Issued10/20/202211/29/2022CONVERT THE GROUND FLOOR STORAGE ROOM TO FITTNESS/RECREATION ROOM
M00771360 ↗401 EAST 50 STREET
MANHATTAN
AlterationPermit Issued07/28/202209/13/2022Remove existing kitchen and hand sink and cap the pipes. Install new hand sink with water and drainpipes. Remove the existing gas stove and …
M00764154 ↗401 EAST 50 STREET
MANHATTAN
AlterationPermit Issued07/04/202208/02/2022RENOVATE EXISTING SOUTH COMMERCIAL STORE AT GROUND (1ST) FLOOR. NO CHANGE IN USE, EXIT OR OCCUPANCY.
B00605713 ↗2804 EMMONS AVENUE
BROOKLYN
AlterationSigned-off10/17/202106/03/2022NEW HALF BATH ON THE ROOF DECK (TWO PLUMBING FIXTURES) ACCESSORY TO THE EXISTING ROOF POOL
B00672088 ↗1273 FULTON STREET
BROOKLYN
AlterationSigned-off02/10/202205/25/2022NEW VENEER BRICK AND FIRE ESCAPE
X00715886 ↗308 SOUNDVIEW AVENUE
BRONX
AlterationSigned-off04/13/202204/29/2022Remove one toilet, one gas meter and Cap Gas and water pipes.
B00605695 ↗2804 EMMONS AVENUE
BROOKLYN
AlterationSigned-off10/18/202104/08/2022NEW HALF BATH ON THE ROOF ACCESSORY TO THE EXISTING POOL ON THE EXISTING ROOF
X00480189 ↗701 RHINELANDER AVENUE
BRONX
AlterationSigned-off03/10/202108/23/2021RENOVATE THE CELLAR AND ENCLOSE THE CELLAR HATCH DOOR IN THE REAR YARD. NO CHANGE IN USE, EXISTS OR OCCUPANCY.
X00467251 ↗308 SOUNDVIEW AVENUE
BRONX
AlterationSigned-off02/10/202102/12/2021INSTAL HIGH EFFICIENT BOILERS FOR SECOND FLOOR APARTMENTS
X00295343 ↗308 SOUNDVIEW AVENUE
BRONX
AlterationSigned-off01/13/202006/24/2020DETENTION SYSTEM INCLUDING DETENTION PIPE BASIN, CATCH BASINS, MANHOLE, CONTROL STRUCTURE, YARD DRAINS AND ALL NECESSARY PIPES AND FITTING A…
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
G. PEROTTO ASSOCIATES104/13/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
ALMUNIR CORP807/01/2026
HHI TECH INC304/02/2026
INFINITI ESC PLUMBING COR307/01/2026
BARNETT PLBG & HTG CORP207/14/2026
VITELLO SEWER W.M H&P SER212/27/2022
ALL PRO PLBG & HTG INC109/26/2022
ALTAIR PLUMBING AND HEATI101/12/2022
BLETSAS P&H CORP104/13/2026
CHEEMA CONSTRUCTION INC106/08/2022
D'ONOFRIO GENERAL CONTRAC110/22/2021
DPH PLUMBING & HTG CORP108/09/2023
GH CONSTRUCTION NY INC104/19/2023
GLENNS PLUMBING SVCS INC107/22/2026
GREAT AMERICAN CONSTR SER104/30/2023
INNOVATING SIGNS & PRINTI102/11/2026
JADA PLUMBING & HTG LLC104/13/2026
JOHN EVAN CONTRACTING COR105/29/2025
MJ GENERAL MECHANICAL LLC112/12/2025
PASHA USA CONSTRUCTION IN102/13/2026
PLANET RENOVATIONS INC110/18/2021
RKA PIPING AND HEATING101/20/2025
SASCO BUILDERS INC106/05/2024
THREE STAR CONSTRUCTION G110/18/2023
TOP CITY HOME IMPROVEMENT111/08/2025
TOP DOG PLBG & HTG CORP107/06/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
ARUNA PROFESSIONAL BUILDING LLC507/14/2026
401 E 50TH CAFE INC209/26/2022
4126 REALTY CORP.203/10/2025
ARTEX PROPERTY MANAGEMENT204/30/2023
HHRMC management206/04/2025
OM SAI REALTY LLC211/08/2025
AAA MANAGEMENT CORP102/05/2025
ALEXANDRIA REALTY112/26/2023
GRACE BARZ LTD.107/23/2026
GUPTA LIMITED PARTNERSHIP106/08/2026
Gourmet Revolution INC104/13/2026
INDU GARG MD PC106/05/2024
YIN HUA REALTY LLC109/30/2024
la grande 309 realty llc112/12/2025
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
G.PEROTTO ASSOCIATES104/13/2026
▾Special Inspection Requirements — 150
DateRequirementBuildingInspectorRole
07/21/2026Tenant Protection Plan Compliance84-34 SMEDLEY STREETMichael Megallaspecial
07/21/2026Energy Code Compliance Inspections84-34 SMEDLEY STREETMichael Megallaprogress
07/21/2026Fire-Resistant Penetrations and Joints84-34 SMEDLEY STREETMichael Megallaspecial
07/12/2026Energy Code Compliance Inspections1624 CROSBY AVENUEMichael Megallaprogress
07/12/2026Tenant Protection Plan Compliance1624 CROSBY AVENUEMichael Megallaspecial
06/30/2026Energy Code Compliance Inspections84-34 SMEDLEY STREETMichael Megallaprogress
06/30/2026Fire-Resistance Rated Construction84-34 SMEDLEY STREETMichael Megallaprogress
06/30/2026Maintenance information84-34 SMEDLEY STREETMichael Megallaenergy_progress
06/29/2026Sprinkler Systems32-50 104 STREETMichael Megallaspecial
06/29/2026Tenant Protection Plan Compliance32-50 104 STREETMichael Megallaspecial
06/29/2026Fire-Resistant Penetrations and Joints1052 BRINSMADE AVENUEMichael Megallaspecial
06/29/2026Tenant Protection Plan Compliance84-34 SMEDLEY STREETMichael Megallaspecial
06/29/2026Fire-Resistant Penetrations and Joints1052 BRINSMADE AVENUEMichael Megallaspecial
06/29/2026Final1052 BRINSMADE AVENUE—progress
06/29/2026Fire-Resistant Penetrations and Joints623 9 AVENUEMichael Megallaspecial
06/29/2026Structural Stability – Alterations of existing buildings623 9 AVENUEMichael Megallaspecial
06/29/2026Tenant Protection Plan Compliance623 9 AVENUEMichael Megallaspecial
06/29/2026Final623 9 AVENUEMichael Megallaprogress
06/29/2026Final84-34 SMEDLEY STREET—progress
06/29/2026Tenant Protection Plan Compliance84-34 SMEDLEY STREETMichael Megallaspecial
06/29/2026Mechanical Systems84-34 SMEDLEY STREETMichael Megallaspecial
06/15/2026Tenant Protection Plan Compliance623 9 AVENUEMichael Megallaspecial
06/15/2026Fire-Resistant Penetrations and Joints623 9 AVENUEMichael Megallaspecial
06/05/2026Lighting controls207 BERKELEY PLACEMichael Megallaenergy_progress
06/05/2026Maintenance information207 BERKELEY PLACEMichael Megallaenergy_progress
05/30/2026Air barrier - visual inspection207 BERKELEY PLACEMichael Megallaenergy_progress
05/30/2026Fenestration air leakage207 BERKELEY PLACEMichael Megallaenergy_progress
05/30/2026Tenant Protection Plan Compliance207 BERKELEY PLACEMichael Megallaspecial
05/30/2026Structural Stability – Alterations of existing buildings207 BERKELEY PLACEMichael Megallaspecial
05/29/2026Final292 ATLANTIC AVENUEMichael Megallaprogress
05/29/2026Tenant Protection Plan Compliance292 ATLANTIC AVENUE—special
05/29/2026Fire-Resistant Penetrations and Joints292 ATLANTIC AVENUEMichael Megallaspecial
04/15/2026Tenant Protection Plan Compliance1106 MORRIS AVENUEMichael Megallaspecial
04/15/2026Sprinkler Systems1106 MORRIS AVENUEMichael Megallaspecial
04/15/2026Fire-Resistant Penetrations and Joints1106 MORRIS AVENUEMichael Megallaspecial
02/20/2026Fire-Resistant Penetrations and Joints351 BADEN PLACEMichael Megallaspecial
02/20/2026Structural Stability – Alterations of existing buildings351 BADEN PLACEMichael Megallaspecial
02/20/2026Final351 BADEN PLACEMichael Megallaprogress
02/20/2026Energy Code Compliance Inspections351 BADEN PLACEMichael Megallaprogress
02/20/2026Fire-Resistance Rated Construction351 BADEN PLACEMichael Megallaprogress
02/20/2026Air barrier - visual inspection351 BADEN PLACEMichael Megallaenergy_progress
01/29/2026Maintenance information6918 FT HAMILTON PARKWAYMichael Megallaenergy_progress
01/20/2026Tenant Protection Plan Compliance292 ATLANTIC AVENUE—special
01/07/2026Fire-Resistant Penetrations and Joints1106 MORRIS AVENUEMichael Megallaspecial
01/07/2026Tenant Protection Plan Compliance1106 MORRIS AVENUEMichael Megallaspecial
12/17/2025Final292 ATLANTIC AVENUEMichael Megallaprogress
12/17/2025Fire-Resistant Penetrations and Joints292 ATLANTIC AVENUEMichael Megallaspecial
11/27/2025Heating Systems3730 LACONIA AVENUEMichael Megallaspecial
11/22/2025Air barrier - visual inspection6918 FT HAMILTON PARKWAYMichael Megallaenergy_progress
11/22/2025Fenestration and door U-factor and product ratings6918 FT HAMILTON PARKWAYMichael Megallaenergy_progress
Latest 50 of 150.
▾Documents — 366 on file (BIS + DOB NOW)
▸Plans & Drawings78
▸DOB NOWPlans/Sketch73
09/01/2026M00771360-P1Request digital key ↗
09/01/2026B00605713-I1Request digital key ↗
09/01/2026B00605695-I1Request digital key ↗
Showing 3 of 73 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/25/2026X00467251-I1Request digital key ↗
08/15/2026X00467251-P2Request digital key ↗
08/15/2026X00467251-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00295343-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026X01152597-I1Open ↗
08/13/2026X01152597-P1Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWHouse Number Verification: TOPO Stamp5
08/17/2026X01192937-P1Open ↗
08/17/2026X01192937-I1Open ↗
08/14/2026B01409115-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026X00467251-I1Open ↗
08/13/2026X00467251-P3Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 24
08/13/2026X00467251-P1Open ↗
08/13/2026X00467251-I1Open ↗
08/13/2026X00467251-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications237
▸DOB NOWProgress Inspector Seal & Signature82
09/24/2026X00715886-P4Open ↗
09/23/2026Q01423765-S1Open ↗
09/16/2026X01196511-S1Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature81
09/24/2026X00715886-P4Open ↗
09/23/2026X00467251-I1Open ↗
09/23/2026Q01423765-S1Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature74
09/02/2026M00764154-I1Open ↗
09/01/2026B00605713-P1Open ↗
09/01/2026B00605713-I1Open ↗
Showing 3 of 74 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/19/2026Q01185189-I1Open ↗
08/17/2026X01192937-P1Open ↗
08/17/2026X01192937-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026X01109660-I1Open ↗
08/19/2026X01156042-I1Open ↗
08/13/2026X01152597-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.7
08/13/2026B00605695-I1Open ↗
08/13/2026B00605713-I1Open ↗
08/13/2026X00295343-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents19
▸DOB NOWProperty Ownership Certification7
08/19/2026Q01185189-I1Open ↗
08/17/2026X01192937-I1Open ↗
08/17/2026X01192937-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00605695-I1Open ↗
08/13/2026X00480189-P1Open ↗
08/13/2026X00480189-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHPD4: CONH Pilot Program3
08/13/2026X01156042-I1Open ↗
08/13/2026X01152597-P1Open ↗
08/13/2026X01152597-I1Open ↗
▸DOB NOWFinal Survey2
08/17/2026X01192937-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDHCR Document1
08/13/2026X00727311-I1Open ↗