← Back
Special Inspection Agency
MULLEN PALANDRANI ARCHITE
Special Inspection Agency
6 jobs with open permitsMANHATTAN · 24BROOKLYN · 2BRONX · 1
14 buildings
41
Total Filings
27
Jobs on File
14
Buildings Worked
6
Jobs w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Jobs by first filing month27 jobs all-time
0134Aug '19 · 2Jul '20 · 1Nov '20 · 1Mar '21 · 1Apr '21 · 1Jun '21 · 1Jul '21 · 1Aug '21 · 1Sep '21 · 2Oct '21 · 2Nov '21 · 3Jan '22 · 2Mar '22 · 1May '22 · 2Jun '22 · 2Jul '22 · 2Aug '22 · 2202020212022
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit622%
Signed off1763%
Filed only415%
By job type
Alteration26
Alteration CO1
Most active buildings
All buildings →
69 5 AVENUEMANHATTAN · latest 07/13/2022
5 jobs
118 EAST 65 STREETMANHATTAN · 2 open · latest 01/05/2024
4 jobs
120 EAST 79 STREETMANHATTAN · latest 02/16/2022
3 jobs
370 CENTRAL PARK WESTMANHATTAN · 2 open · latest 06/14/2022
3 jobs
540 2 AVENUEMANHATTAN · 1 open · latest 01/13/2022
2 jobs
275 WEST 96 STREETMANHATTAN · latest 01/31/2022
2 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
B00483487 ↗112 KINGSLAND AVENUE
BROOKLYN
AlterationSigned-off03/07/202206/18/2025Relocate (1) w/c & (1) lavatory, install new (1) DF & (1) serv. sink at proposed storage warehouse. Install (1) new gas space heaters at pr…
M00774205 ↗118 EAST 65 STREET
MANHATTAN
AlterationPermit Issued07/14/202201/05/2024Interior alteration at 3rd floor. No change to use, zoning, occupancy or egress.
M00765349 ↗41 MURRAY STREET
MANHATTAN
AlterationPermit Issued08/25/202209/20/2022Interior alteration to install new toilet room at cellar. Install new partitions & finishes as indicated on drawings filed herewith. PL wor…
X00786924 ↗1996 ANTHONY AVENUE
BRONX
AlterationSigned-off08/23/202209/08/2022We respectfully wish to renovate apartment 1b as per plans. no change in use,egress or occupancy
M00773825 ↗118 EAST 65 STREET
MANHATTAN
AlterationPermit Issued07/14/202207/19/2022Remove & relocate existing plumbing fixtures at 3rd floor. No change to use, egress, occupancy, & zoning.
M00757450 ↗69 5 AVENUE
MANHATTAN
AlterationSigned-off06/24/202207/13/2022Interior alteration at apartment 9H. All as per plans filed herewith. No change to egress, zoning, occupancy, & use.
Counts cover all 27 jobs (27 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
27 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 27Open permit 6Signed off 17Filed only 4
Any typeAlteration 26Alteration CO 1
27 jobs
JobAddressTypeStatusFiledLatest permitDescription
B00483487 ↗112 KINGSLAND AVENUE
BROOKLYN
AlterationSigned-off03/07/202206/18/2025Relocate (1) w/c & (1) lavatory, install new (1) DF & (1) serv. sink at proposed storage warehouse. Install (1) new gas space heaters at pr…
M00774205 ↗118 EAST 65 STREET
MANHATTAN
AlterationPermit Issued07/14/202201/05/2024Interior alteration at 3rd floor. No change to use, zoning, occupancy or egress.
M00765349 ↗41 MURRAY STREET
MANHATTAN
AlterationPermit Issued08/25/202209/20/2022Interior alteration to install new toilet room at cellar. Install new partitions & finishes as indicated on drawings filed herewith. PL wor…
X00786924 ↗1996 ANTHONY AVENUE
BRONX
AlterationSigned-off08/23/202209/08/2022We respectfully wish to renovate apartment 1b as per plans. no change in use,egress or occupancy
M00773825 ↗118 EAST 65 STREET
MANHATTAN
AlterationPermit Issued07/14/202207/19/2022Remove & relocate existing plumbing fixtures at 3rd floor. No change to use, egress, occupancy, & zoning.
M00757450 ↗69 5 AVENUE
MANHATTAN
AlterationSigned-off06/24/202207/13/2022Interior alteration at apartment 9H. All as per plans filed herewith. No change to egress, zoning, occupancy, & use.
M00757429 ↗69 5 AVENUE
MANHATTAN
AlterationSigned-off06/24/202207/12/2022Interior alteration at apartment 9H. All as per drawings filed herewith.
M00725428 ↗370 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued05/19/202206/14/2022Install (4) new thru-wall AC units under existing windows. No change to egress, occupancy, & use.
M00674100118 EAST 65 STREET
MANHATTAN
Alteration COFiled — no permit on record05/24/2022——
M00650754 ↗120 EAST 79 STREET
MANHATTAN
AlterationSigned-off01/04/202202/16/2022Interior alteration at apartment 11B. Install new opening into apartment 11CD. Remove existing kitchen& partitions at 11B. Install new part…
M00655106 ↗120 EAST 79 STREET
MANHATTAN
AlterationSigned-off01/03/202202/11/2022Remove & relocate plumbing fixtures at Apt 11B. Remove existing gas range at kitchen. Add (1) new lavatory at bathroom. No change to use,…
M00614163 ↗275 WEST 96 STREET
MANHATTAN
AlterationSigned-off10/22/202101/31/2022INTERIOR ALTERATION AT APT. 33A. NEW OPENING TO COMBINE APT 33A W/ 33B. REMOVE PARTITIONS AND FINISHES THROUGHOUT & INSTALL NEW PARTITIONS…
M00629838 ↗540 2 AVENUE
MANHATTAN
AlterationSigned-off11/17/202101/13/2022Install new plumbing fixtures at new toilet room. GC work filed separately under application #M00628588. No change to use, egress, or occ…
M00628588 ↗540 2 AVENUE
MANHATTAN
AlterationPermit Issued11/17/202112/08/2021Install new accessible toilet room (partitions & finishes) at existing restaurant. Plumbing work filed under a separate application # M0062…
M00500622 ↗118 EAST 65 STREET
MANHATTAN
AlterationSigned-off11/03/202112/02/2021REMOVE & REPLACE EXISTING PLUMBING FIXTURES AT POWDER ROOM & KITCHENETTE. REMOVE & CAP. EXISTING SHOWER STALL AT POWDER ROOM. ALL GENERAL …
M00614167 ↗275 WEST 96 STREET
MANHATTAN
AlterationSigned-off10/22/202111/29/2021Remove & replace (1) tub,(2) w/c,(2) lavs, & (1) tub with new shower stall in existing locations. Remove & relocate (1) existing kitchen sin…
M00598455 ↗69 5 AVENUE
MANHATTAN
AlterationSigned-off09/23/202110/07/2021Interior alteration to apartment 10D. Remove interior partitions & finishes. Install new partitions & finishes. Plumbing work filed separat…
M00598533 ↗69 5 AVENUE
MANHATTAN
AlterationSigned-off09/23/202110/07/2021INTERIOR ALTERATION AT APT. 10D. REMOVE & REPLACE PLUMBING FIXTURES AS INDICATED ON DRAWINGS FILED HEREWITH. INSTALL NEW WASHER/DRYER. GEN…
M00579246 ↗968 AMSTERDAM AVENUE
MANHATTAN
AlterationFiled — no permit on record08/31/2021——
M00556394 ↗120 EAST 79 STREET
MANHATTAN
AlterationSigned-off07/13/202108/23/2021INTERIOR ALTERATION TO EXISTING KITCHEN. REMOVE EXISTING PARTITIONS, DOORS, AND ALL FINISHES AT KITCHEN. INSTALL NEW PARTITIONS AND NEW KITC…
M00475741 ↗370 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off03/17/202107/01/2021Remove existing floors & partitions throughout apartment. Install new floors, finishes, & partitions throughout. All as per plans filed he…
B00504145 ↗664 DECATUR STREET
BROOKLYN
AlterationFiled — no permit on record06/24/2021——
M00387732 ↗370 CENTRAL PARK WEST
MANHATTAN
AlterationPermit Issued04/05/202105/03/2021Relocate (1) kitchen sink, (1) dishwasher, (1) bathtub, (1) lavatory, (1) w/c. RELOCATE (1) GAS RANGE. All general construction work filed…
M00416595 ↗59 WEST 12 STREET
MANHATTAN
AlterationSigned-off11/12/202001/06/2021Remove and cap existing gas range at Apt 3F. Remove existing kitchen sink w/ new lavatory. Install new shower stall. No change to use, eg…
M00360624 ↗69 5 AVENUE
MANHATTAN
AlterationSigned-off07/13/202009/03/2020Remove & replace (2) W/C, (2) Lavatories, (1) Bathtub, (1) Kitchen sink, (1) DW, & (1) washer in existing locations with new. Remove (1) Ba…
M00210815 ↗71 7 AVENUE SOUTH
MANHATTAN
AlterationSigned-off08/15/201909/09/2019Relocate pizza oven & relocate existing gas lines. No change to use, egress or occupancy.
M00205946 ↗2039 BROADWAY
MANHATTAN
AlterationFiled — no permit on record08/20/2019——
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
MULLEN PALANDRANI ARCHITECTS2510/07/2025
CARSON ARCHITECTURE, PLLC207/21/2022
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
NILU HOME IMPROVEMENT NY301/04/2022
NY PLUMBING & HEATING COR212/28/2022
P.S.I. MECHANICAL201/03/2022
WYNNE PLBG & HEATING CORP207/21/2022
DO RITE MECHANICAL CORP108/09/2021
EDGE RENOVATION LLC101/11/2022
GOTHAM LUXURY.GROUP LLC109/23/2021
HAMILTON AIR COMPANY, INC101/04/2022
HI-TECH PLUMBING & HEATIN102/25/2022
J. CAIAZZO PLBG & HTG COR108/15/2019
JG INTERIOR RENOVATION CO109/29/2021
JOSEPH GENERAL CONSTRUCTI108/23/2022
LIQUID PLBG & HTNG SCS IN110/07/2025
METROTECH MECHANICAL CORP101/11/2022
ORBIT PLBG & HTG INC105/11/2022
P & P CONSTR & PAINTING112/28/2022
RGA MECHANICAL CORP105/19/2022
SC CONTRACTING MANAGEMENT108/25/2022
TRI-COLOR INTERIORS INC107/21/2022
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
HOFFMAN MANAGEMENT209/29/2021
3 L BROS CORP110/07/2025
ST. NIKOLAS HOLDINGS & MANAGEMENT L108/23/2022
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
MICHAEL ZENREICH ARCHITECT, PC105/24/2022
R CONSULTING108/23/2022
Click a row for this entity's own jobs, plans and documents at that building.
BuildingFilingsMost Recent
112 KINGSLAND AVENUE ↗210/07/2025
118 EAST 65 STREET ↗612/28/2022
41 MURRAY STREET ↗108/25/2022
1996 ANTHONY AVENUE ↗108/23/2022
69 5 AVENUE ↗907/21/2022
370 CENTRAL PARK WEST ↗605/19/2022
275 WEST 96 STREET ↗405/11/2022
540 2 AVENUE ↗401/11/2022
120 EAST 79 STREET ↗301/04/2022
968 AMSTERDAM AVENUE ↗108/31/2021
664 DECATUR STREET ↗106/24/2021
59 WEST 12 STREET ↗111/12/2020
2039 BROADWAY ↗108/20/2019
71 7 AVENUE SOUTH ↗108/15/2019
▾Special Inspection Requirements — 55
DateRequirementBuildingInspectorRole
10/07/2025Fire-Resistant Penetrations and Joints112 KINGSLAND AVENUERichard Palandranispecial
10/07/2025Energy Code Compliance Inspections112 KINGSLAND AVENUERichard Palandraniprogress
04/21/2025Energy Code Compliance Inspections112 KINGSLAND AVENUERichard Palandraniprogress
12/30/2024Fire-Resistant Penetrations and Joints112 KINGSLAND AVENUERichard Palandranispecial
12/28/2022Fire-Resistant Penetrations and Joints118 EAST 65 STREETRichard Palandranispecial
12/06/2022Fire-Resistant Penetrations and Joints118 EAST 65 STREETRichard Palandranispecial
08/24/2022Fire-Resistant Penetrations and Joints41 MURRAY STREETRichard Palandranispecial
08/22/2022Fire-Resistant Penetrations and Joints1996 ANTHONY AVENUERichard Palandranispecial
08/03/2022Final1996 ANTHONY AVENUERichard Palandraniprogress
07/22/2022Lighting in dwelling units69 5 AVENUECHRISTOPHER CARSONenergy_progress
07/22/2022Energy Code Compliance Inspections69 5 AVENUECHRISTOPHER CARSONprogress
07/22/2022Final69 5 AVENUECHRISTOPHER CARSONprogress
07/22/2022Fire-Resistant Penetrations and Joints69 5 AVENUERichard Palandranispecial
06/27/2022Mechanical Systems41 MURRAY STREETRichard Palandranispecial
06/27/2022Final41 MURRAY STREETRichard Palandraniprogress
05/13/2022Fire-Resistant Penetrations and Joints275 WEST 96 STREETRichard Palandranispecial
05/02/2022Fire-Resistant Penetrations and Joints370 CENTRAL PARK WESTRichard Palandranispecial
04/25/2022Mechanical Systems370 CENTRAL PARK WESTRichard Palandranispecial
04/25/2022Final370 CENTRAL PARK WESTRichard Palandraniprogress
03/30/2022Fire-Resistant Penetrations and Joints118 EAST 65 STREETRichard Palandranispecial
03/30/2022Energy Code Compliance Inspections118 EAST 65 STREETRichard Palandraniprogress
03/30/2022Lighting controls118 EAST 65 STREET—energy_progress
03/30/2022Lighting in dwelling units118 EAST 65 STREET—energy_progress
03/30/2022Interior lighting power118 EAST 65 STREET—energy_progress
03/17/2022Fire-Resistant Penetrations and Joints69 5 AVENUERichard Palandranispecial
02/14/2022Fire-Resistant Penetrations and Joints275 WEST 96 STREETRichard Palandranispecial
02/14/2022Fire-Resistant Penetrations and Joints69 5 AVENUERichard Palandranispecial
01/14/2022Fire-Resistant Penetrations and Joints540 2 AVENUERichard Palandranispecial
01/12/2022Final540 2 AVENUERichard Palandraniprogress
01/12/2022Mechanical Systems540 2 AVENUERichard Palandranispecial
01/12/2022Fire-Resistant Penetrations and Joints540 2 AVENUERichard Palandranispecial
01/11/2022Final540 2 AVENUERichard Palandraniprogress
01/11/2022Mechanical Systems540 2 AVENUERichard Palandranispecial
01/11/2022Fire-Resistant Penetrations and Joints540 2 AVENUERichard Palandranispecial
11/18/2021Fire-Resistant Penetrations and Joints275 WEST 96 STREETRichard Palandranispecial
10/20/2021Lighting in dwelling units275 WEST 96 STREETRichard Palandranienergy_progress
10/18/2021Final275 WEST 96 STREETRichard Palandraniprogress
10/01/2021Lighting in dwelling units370 CENTRAL PARK WESTRichard Palandranienergy_progress
10/01/2021Final370 CENTRAL PARK WESTRichard Palandraniprogress
10/01/2021Fire-Resistant Penetrations and Joints370 CENTRAL PARK WESTRichard Palandranispecial
09/28/2021Fire-Resistant Penetrations and Joints370 CENTRAL PARK WESTRichard Palandranispecial
09/28/2021Lighting in dwelling units370 CENTRAL PARK WESTRichard Palandranienergy_progress
09/28/2021Final370 CENTRAL PARK WESTRichard Palandraniprogress
09/23/2021Lighting in dwelling units69 5 AVENUERichard Palandranienergy_progress
09/22/2021Final69 5 AVENUERichard Palandraniprogress
09/22/2021Fire-Resistant Penetrations and Joints69 5 AVENUERichard Palandranispecial
09/15/2021Fire-Resistant Penetrations and Joints968 AMSTERDAM AVENUERichard Palandranispecial
08/18/2021Energy Code Compliance Inspections968 AMSTERDAM AVENUERichard Palandraniprogress
08/16/2021Fire-Resistant Penetrations and Joints370 CENTRAL PARK WESTRichard Palandranispecial
06/28/2021Fire-Resistant Penetrations and Joints370 CENTRAL PARK WESTRichard Palandranispecial
Latest 50 of 55.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch33
09/03/2026M00556394-I1Request digital key ↗
09/03/2026M00598455-I1Request digital key ↗
09/03/2026M00598533-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00210815-I1Request digital key ↗
09/04/2026M00360624-I1Request digital key ↗
09/04/2026M00416595-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00475741-P1Request digital key ↗
08/15/2026M00475741-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00205946-I1Request digital key ↗
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026M00773825-I1Open ↗
08/13/2026M00500622-I1Open ↗
08/13/2026M00416595-I1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications99
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/03/2026M00556394-I1Open ↗
09/03/2026M00387732-I1Open ↗
09/03/2026M00387732-P2Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/16/2026M00475741-I1Open ↗
09/02/2026B00483487-P2Open ↗
09/02/2026M00614167-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/16/2026M00475741-I1Open ↗
09/16/2026M00475741-I1Open ↗
09/02/2026B00483487-P2Open ↗
Showing 3 of 23 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan8
09/01/2026M00387732-I1Open ↗
08/13/2026M00387732-I1Open ↗
08/13/2026M00387732-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
09/03/2026M00556394-I1Open ↗
09/03/2026M00387732-P1Open ↗
09/03/2026M00598455-I1Open ↗
Showing 3 of 43 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00598455-I1Open ↗
08/15/2026M00614163-I1Open ↗
08/13/2026M00475741-I1Open ↗
Showing 3 of 5 on file for this type