| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01242376 ↗ | 113 ELDRIDGE STREET MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 08/04/2025 | Design PHILIP LOGAN ARCHITECT Contractor GLENWOOD CONSTRUCTION COR | NEW INTERIOR OFFICE AND STORAGE PARTITION WALLS. REPAIR, TO REPLACE MECHANICAL EQUIPMENT ON THE 1ST FLOOR AS SHOWN ON THE DRAWINGS. |
| M00262350 ↗ | 12 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 01/31/2020 | 01/25/2022 | Design PHILIP LOGAN ARCHITECT Contractor JVR PLBG AND HEATING INC Filer EXPEDITION NYC | INSTALLATION OF PLUMBING FIXTURES; NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| GLENWOOD CONSTRUCTION COR | 1 | 06/25/2025 |
| STANLEY LEWIS CONTR, CORP | 1 | 09/17/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01242376 ↗ | 113 ELDRIDGE STREET MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 08/04/2025 | Design PHILIP LOGAN ARCHITECT Contractor GLENWOOD CONSTRUCTION COR | NEW INTERIOR OFFICE AND STORAGE PARTITION WALLS. REPAIR, TO REPLACE MECHANICAL EQUIPMENT ON THE 1ST FLOOR AS SHOWN ON THE DRAWINGS. |
| M00262350 ↗ | 12 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 01/31/2020 | 01/25/2022 | Design PHILIP LOGAN ARCHITECT Contractor JVR PLBG AND HEATING INC Filer EXPEDITION NYC | INSTALLATION OF PLUMBING FIXTURES; NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 113 ELDRIDGE STREET ↗ | 1 | 06/25/2025 |
| 12 WOOSTER STREET ↗ | 3 | 09/17/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 06/17/2025 | HVAC-R and service water piping design and insulation | 113 ELDRIDGE STREET | Philip Logan | energy_progress |
| 06/17/2025 | Maintenance information | 113 ELDRIDGE STREET | Philip Logan | energy_progress |
| 06/17/2025 | HVAC-R and service water heating equipment | 113 ELDRIDGE STREET | Philip Logan | energy_progress |
| 06/17/2025 | HVAC-R and service water heating system controls | 113 ELDRIDGE STREET | Philip Logan | energy_progress |
| 06/17/2025 | Fire-Resistance Rated Construction | 113 ELDRIDGE STREET | Philip Logan | progress |
| 06/17/2025 | Energy Code Compliance Inspections | 113 ELDRIDGE STREET | Philip Logan | progress |
| 06/17/2025 | Final | 113 ELDRIDGE STREET | Philip Logan | progress |
| 06/17/2025 | Tenant Protection Plan Compliance | 113 ELDRIDGE STREET | Philip Logan | special |
| 06/17/2025 | Fire-Resistant Penetrations and Joints | 113 ELDRIDGE STREET | Philip Logan | special |
| 06/17/2025 | Mechanical Systems | 113 ELDRIDGE STREET | Philip Logan | special |
| 06/22/2021 | Fire-Resistant Penetrations and Joints | 12 WOOSTER STREET | Philip Logan | special |
| 06/22/2021 | Fire-Resistance Rated Construction | 12 WOOSTER STREET | Philip Logan | progress |
| 06/25/2020 | Fire-Resistant Penetrations and Joints | 12 WOOSTER STREET | Philip Logan | special |
| 06/25/2020 | Fire-Resistance Rated Construction | 12 WOOSTER STREET | Philip Logan | progress |