| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01080852 ↗ | 345 OCEAN PARKWAY BROOKLYN | New Building | Permit Issued | 07/24/2024 | 09/14/2026 | SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB: TO INCLUDE SHORING AND BRACING WITH DRILLED SOLDIER PILES AND LAGGING, RAKER AND WA… |
| X00529727 ↗ | 290 EAST 150 STREET BRONX | Alteration | Permit Issued | 10/04/2021 | 06/01/2026 | INSTALL PLUMBING AND GAS PIPING SYSTEM AND SERVICE CONNECTION TO WATER MAIN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01319462 ↗ | 2170 8 AVENUE MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 03/18/2026 | Propose Partial demolition and Concrete polishing and probes for plumbing piping |
| B00206359 ↗ | 306 NORTH HENRY STREET BROOKLYN | Alteration | Permit Issued | 11/14/2019 | 01/09/2026 | THE SCOPE OF WORK FOR THIS PACKAGE IS TO DOCUMENT THE STRUCTURAL CONSTRUCTION OF THE NEW BUILDING INCLUDING STRUCTURAL STEEL FRAME, STEEL BR… |
| B01284033 ↗ | 50 BRIDGE STREET BROOKLYN | Alteration | Permit Issued | 09/11/2025 | 12/31/2025 | PROPOSE TO INFILL EXISTING BUILDING INTERIOR RAMP AND DRIVEWAY. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANCY. |
| Q01174468 ↗ | 87-14 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 02/06/2025 | 02/20/2025 | Interior renovation of Doctors office at first floor and accessory storage rooms at cellar. |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01080852 ↗ | 345 OCEAN PARKWAY BROOKLYN | New Building | Permit Issued | 07/24/2024 | 09/14/2026 | SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB: TO INCLUDE SHORING AND BRACING WITH DRILLED SOLDIER PILES AND LAGGING, RAKER AND WA… |
| X00529727 ↗ | 290 EAST 150 STREET BRONX | Alteration | Permit Issued | 10/04/2021 | 06/01/2026 | INSTALL PLUMBING AND GAS PIPING SYSTEM AND SERVICE CONNECTION TO WATER MAIN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01319462 ↗ | 2170 8 AVENUE MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 03/18/2026 | Propose Partial demolition and Concrete polishing and probes for plumbing piping |
| B00206359 ↗ | 306 NORTH HENRY STREET BROOKLYN | Alteration | Permit Issued | 11/14/2019 | 01/09/2026 | THE SCOPE OF WORK FOR THIS PACKAGE IS TO DOCUMENT THE STRUCTURAL CONSTRUCTION OF THE NEW BUILDING INCLUDING STRUCTURAL STEEL FRAME, STEEL BR… |
| B01284033 ↗ | 50 BRIDGE STREET BROOKLYN | Alteration | Permit Issued | 09/11/2025 | 12/31/2025 | PROPOSE TO INFILL EXISTING BUILDING INTERIOR RAMP AND DRIVEWAY. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANCY. |
| Q01174468 ↗ | 87-14 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 02/06/2025 | 02/20/2025 | Interior renovation of Doctors office at first floor and accessory storage rooms at cellar. |
| M00652757 ↗ | 209 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/24/2021 | 07/26/2024 | Please find uploaded amended plumbing drawings. Scope of work is amended as per plumbing inspection objections to change riser info, the qua… |
| Q00549624 ↗ | 134-16 35 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/01/2021 | 06/26/2024 | PROPOSED 12 STORY MIX-USE BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENT. OBTAIN NEW C OF O. |
| B00981203 ↗ | 168 VAN DYKE STREET BROOKLYN | Alteration CO | Permit Issued | 12/28/2023 | 05/14/2024 | PROPOSE TO CONVERT EXISTING WAREHOUSE TO RETAIL USE. NEW PARTITIONS AND MECHANICAL WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OOCUPANCY. |
| Q01005979 ↗ | 175-31 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 03/27/2024 | 05/13/2024 | Proposed to file the structural work in conjunction with Alt.1 job #421095763. THIS APPLICATION IS FILED FOR VERTICAL AND HORIZONTAL EXTENSI… |
| Q00551187 ↗ | 134-16 35 AVENUE QUEENS | Alteration | Signed-off | 07/06/2021 | 10/31/2023 | FILING FOR EXCAVATION, SHORING, FOOTING, FOUNDATION & STRUCTURAL WORK ON CELLAR, 1ST TO 12TH FLOOR, ROOF, OSP. IN CONJUNCTION WITH APPLICA… |
| M00742911 ↗ | 36 WEST 66 STREET MANHATTAN | Alteration | Signed-off | 06/03/2022 | 09/28/2023 | INSTALLATION AND USE OF TEMPORARY COCOON AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00641485 ↗ | 134-16 35 AVENUE QUEENS | Alteration | Signed-off | 03/09/2022 | 07/31/2023 | Filing sprinkler and standpipe work on cellar, 1st to 12th floor, ROOF in conjunction with GC application#Q00549624. |
| Q00641301 ↗ | 134-16 35 AVENUE QUEENS | Alteration | Signed-off | 03/23/2022 | 05/31/2023 | Filing plumbing work on the cellar, 1st to 12th floor, ROOF, in conjunction with GC application#Q00549624. |
| M00740736 ↗ | 873 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/27/2022 | 05/12/2023 | MODIFICATION TO PLUMBING FIXTURES AND SPRINKLER HEADS IN COMMERCIAL TENANT SPACE ON 1ST FLOOR AND CELLAR AS PER PLANS. |
| M00410934 ↗ | 128 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 10/09/2020 | 04/11/2023 | PROVIDE DRY STANDPIPE SYSTEM FOR ENTIRE BUILDING WITH ACCORDING TO NYC BC SEC 905 APENDIX Q& N.F.P.A. #14-2007 |
| Q00479079 ↗ | 37-30 31 STREET QUEENS | Alteration | Signed-off | 05/04/2021 | 02/23/2023 | Propose structural modifications, removal and installation of interior construction work and related finishes of existing building all as pe… |
| M00288080 ↗ | 128 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 12/27/2019 | 01/20/2023 | APPLICATION IS FILED FOR INSTALLATION OF NEW PLUMBING FIXTURES AND NEW SPRINKLER/STANDPIPE SYSTEM FOR THE ENTIRE NEW BUILDING IN CONJUNCTION… |
| M00740822 ↗ | 873 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/27/2022 | 12/22/2022 | MODIFICIATION TO DUCT WORK AND PIPING, INSTALL NEW AIR HANDLING UNIT IN COMMERCIAL TENANT SPACE AS PER PLANS. |
| M00283321 ↗ | 128 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 12/26/2019 | 12/09/2022 | APPLICATION IS FILED FOR MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION #123118884 |
| X00386297 ↗ | 296 CITY ISLAND AVENUE BRONX | Alteration | Permit Issued | 08/25/2020 | 03/02/2022 | Provide new ventilation and HVAC system in conjunction with Type 2 Alteration #240281887 |
| X00485123 ↗ | 290 EAST 150 STREET BRONX | Alteration | Signed-off | 03/18/2021 | 10/03/2021 | PROPOSED EARTHWORK AND FOUNDATION SCOPE OF WORKS IN CONJUNCTION WITH NB APPLICATION #210180999. |
| S00214592 ↗ | 360 INDUSTRY ROAD STATEN ISLAND | Alteration | Signed-off | 10/15/2019 | 06/23/2021 | TO EXTEND EXISTENT GAS PIPING FOR GAS LINE ID# 1 WITH 4, 6, 8 PIPE WELDED JOINTS AND GAS LINE WITHIN ID #2 HIGH PRESSURE PIPING |
| Name | Jobs together | Most recent |
|---|---|---|
| A&D ENGINEERING, PLLC | 3 | 07/20/2023 |
| EMTG CONSULTANTS INC | 2 | 03/28/2023 |
| HPL ENGINEERING P.C. | 2 | 09/16/2025 |
| HRM ENGINEERING SERVICES, PC | 2 | 08/28/2023 |
| ANDRES DIAZ ARCHITECT | 1 | 02/06/2025 |
| BADALY ARCHITECTS | 1 | 08/25/2020 |
| BGA, LLC | 1 | 01/20/2026 |
| CQ&J CORPORATION | 1 | 07/23/2024 |
| DELTA LIMIT ENGINEERING PLLC | 1 | 07/28/2026 |
| DOKA USA | 1 | 06/03/2022 |
| ELEVATED ENGINEERING NYC | 1 | 07/28/2026 |
| ENGINEERING PROFESSIONAL SERVICE P. | 1 | 07/28/2026 |
| FRIEDMAN, PE | 1 | 07/28/2026 |
| GEORGE N. GEANNAKAKES, PE | 1 | 02/24/2026 |
| KAR ENGINEERING | 1 | 06/17/2021 |
| LEONID KRUPNIK, P.E. | 1 | 03/27/2024 |
| NEVILLE ENGINEERING GROUP | 1 | 08/19/2026 |
| NSC ARCHITECTURE, PC | 1 | 04/04/2024 |
| NTD ENGINEERING CONSULTANT LLC | 1 | 01/03/2022 |
| O&S ASSOCIATES | 1 | 09/14/2023 |
| S M TAM ARCHITECT, PLLC | 1 | 07/16/2026 |
| SMBT CONSULTANTS LLC | 1 | 08/19/2026 |
| SOLOMON ROSENZWEIG P.E P.C. | 1 | 08/19/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| AP PLUMBING & HVAC LLC | 2 | 08/19/2026 |
| CLASS ONE CONSTRUCTION LT | 2 | 08/19/2026 |
| H&Z BUILDING CONSULTING I | 2 | 09/16/2025 |
| LNM CONSTRUCTION LLC | 2 | 02/24/2026 |
| ROM PIPING & HEATING INC | 2 | 07/20/2023 |
| SUNLIGHT CONSTRUCTION AA | 2 | 09/16/2025 |
| BROOKLYN CONSTRUCTION GR* | 1 | 01/20/2026 |
| BYPASS MECHANICAL CORP | 1 | 07/23/2024 |
| CONSTRUCTION MNGT. AA,LLC | 1 | 09/16/2025 |
| CROSSFIELD PLBG.&HTG.CORP | 1 | 08/19/2026 |
| DFE CONTRACTOR LLC | 1 | 03/27/2024 |
| DUTCH VORTEX LLC | 1 | 09/14/2023 |
| DYNAMIC PLBNG & SPRKR COR | 1 | 08/24/2023 |
| EFFICIENT CLIMATE SOLUTIO | 1 | 12/15/2021 |
| ENERGY BUILDING CONSTRUCT | 1 | 09/14/2023 |
| GENET PLBG AND HTG CORP | 1 | 03/28/2023 |
| HIGH QUALITY CONSTRUCTION | 1 | 05/27/2022 |
| I.M.P. PLBG. & HTG. CORP | 1 | 06/17/2021 |
| KYMECH INDUSTRIES INC | 1 | 07/23/2024 |
| LENDLEASE(US)CONSTRUCTION | 1 | 06/03/2022 |
| MAXIMUM CONTRACTING INC | 1 | 07/28/2026 |
| MIDTOWN PLBG & HTNG CORP | 1 | 03/28/2023 |
| MPCC CORP | 1 | 08/25/2020 |
| PANACEA CONTRACTING CORP | 1 | 07/28/2026 |
| PIPESTYLISTS, INC | 1 | 07/16/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| H&Z BUILDING NY CORP. | 4 | 09/16/2025 |
| MAYIM MECHANICAL LLC | 2 | 02/24/2026 |
| MEYER EQUITIES LLC | 2 | 03/28/2023 |
| VINBAYTEL DEVELOPMENTS LLC | 2 | 07/20/2023 |
| 117 Food Corp | 1 | 08/19/2026 |
| 300 NORTH HENRY STREET LLC | 1 | 01/20/2026 |
| CLASS ONE CONSTRUCTION,LTD | 1 | 02/06/2025 |
| DUTCH VORTEX LLC | 1 | 09/14/2023 |
| EXTELL DEVELOPMENT | 1 | 06/03/2022 |
| HREA | 1 | 07/23/2024 |
| JLN CONSTRUCTION | 1 | 07/28/2026 |
| TRIHILL MANAGEMENT | 1 | 07/23/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| H&Z BUILDING NY CORP. | 4 | 09/16/2025 |
| CITY WIDE EXPEDITING INC. | 2 | 03/28/2023 |
| KC EXPEDITING INC | 2 | 02/24/2026 |
| A&A BUILDING CONSULTANTS INC. | 1 | 08/19/2026 |
| BLUARCH LLC | 1 | 07/23/2024 |
| CONVERSANO ASSOCIATES, INC. | 1 | 09/14/2023 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 06/03/2022 |
| MEI BUILDINGS SERVICES CORP | 1 | 07/16/2026 |
| MEP DESIGNS, INC | 1 | 07/28/2026 |
| POI LENG ONG | 1 | 01/20/2026 |
| S M TAM ARCHITECT, PLLC | 1 | 01/03/2022 |
| SCARANO ARCHITECT PLLC | 1 | 08/19/2026 |
| YSG SERVICES | 1 | 07/28/2026 |
| Building | Filings | Most Recent |
|---|---|---|
| 2170 8 AVENUE ↗ | 11 | 07/30/2026 |
| 345 OCEAN PARKWAY ↗ | 5 | 07/28/2026 |
| 50 BRIDGE STREET ↗ | 2 | 02/24/2026 |
| 306 NORTH HENRY STREET ↗ | 3 | 01/20/2026 |
| 87-14 JAMAICA AVENUE ↗ | 1 | 02/06/2025 |
| 290 EAST 150 STREET ↗ | 6 | 11/26/2024 |
| 209 7 AVENUE ↗ | 3 | 07/23/2024 |
| 175-31 JAMAICA AVENUE ↗ | 1 | 03/27/2024 |
| 168 VAN DYKE STREET ↗ | 1 | 12/28/2023 |
| 134-16 35 AVENUE ↗ | 18 | 09/19/2023 |
| 128 WEST 26 STREET ↗ | 4 | 07/20/2023 |
| 873 BROADWAY ↗ | 3 | 03/28/2023 |
| 36 WEST 66 STREET ↗ | 1 | 06/03/2022 |
| 37-30 31 STREET ↗ | 1 | 04/05/2022 |
| 360 INDUSTRY ROAD ↗ | 3 | 06/17/2021 |
| 296 CITY ISLAND AVENUE ↗ | 1 | 08/25/2020 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/10/2026 | Subsurface Investigations (Borings/Test Pits) | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Structural Steel - Details | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Construction Operations Influencing Adjacent Structures | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Excavations - Sheeting, Shoring, and Bracing | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Subgrade Inspections | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Post-installed Anchors | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 08/10/2026 | Structural Steel - Welding | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Construction Operations Influencing Adjacent Structures | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Excavations - Sheeting, Shoring, and Bracing | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Post-installed Anchors | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Structural Steel - Details | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Structural Steel - Welding | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Subgrade Inspections | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/27/2026 | Subsurface Investigations (Borings/Test Pits) | 345 OCEAN PARKWAY | FRANCISCO SANCHEZ PEREZ | special |
| 07/24/2026 | Fire-Resistant Penetrations and Joints | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | special |
| 07/24/2026 | Tenant Protection Plan Compliance | 2170 8 AVENUE | — | special |
| 07/24/2026 | Fire-Resistance Rated Construction | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 07/24/2026 | Final | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 07/24/2026 | Energy Code Compliance Inspections | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 07/24/2026 | Lighting controls | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/24/2026 | Fenestration and door U-factor and product ratings | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/24/2026 | Interior lighting power | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/24/2026 | Fenestration air leakage | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/24/2026 | Air barrier - visual inspection | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/24/2026 | Insulation placement and R values | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/24/2026 | Maintenance information | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 07/01/2026 | Tenant Protection Plan Compliance | 2170 8 AVENUE | — | special |
| 06/30/2026 | Sprinkler Systems | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | special |
| 06/30/2026 | Fire-Resistant Penetrations and Joints | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | special |
| 06/16/2026 | Tenant Protection Plan Compliance | 2170 8 AVENUE | — | special |
| 06/16/2026 | Energy Code Compliance Inspections | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 06/16/2026 | Fenestration and door U-factor and product ratings | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Fenestration air leakage | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Interior lighting power | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Insulation placement and R values | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Lighting controls | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Maintenance information | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Air barrier - visual inspection | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 06/16/2026 | Fire-Resistance Rated Construction | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 06/16/2026 | Final | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 05/22/2026 | Duct leakage testing, insulation and design | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 05/22/2026 | Maintenance information | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | energy_progress |
| 05/22/2026 | Final | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 05/22/2026 | Energy Code Compliance Inspections | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | progress |
| 05/22/2026 | Mechanical Systems | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | special |
| 05/22/2026 | Tenant Protection Plan Compliance | 2170 8 AVENUE | — | special |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | 2170 8 AVENUE | FRANCISCO SANCHEZ PEREZ | special |