← Back
Special Inspection Agency
SAM MATHER ARCHITECT
Special Inspection Agency
5 jobs with open permitsMANHATTAN · 16BRONX · 3BROOKLYN · 1
15 buildings
27
Total Filings
20
Jobs on File
15
Buildings Worked
5
Jobs w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Jobs by first filing month20 jobs all-time
0123May '21 · 2Nov '21 · 1Feb '22 · 1Apr '22 · 1May '22 · 2Jul '22 · 1Nov '22 · 1Feb '23 · 1Aug '23 · 1Jan '24 · 1Mar '25 · 1Apr '25 · 1May '25 · 1Jul '25 · 1Jan '26 · 1May '26 · 1Jun '26 · 1Aug '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit525%
Signed off1575%
By job type
Alteration20
Most active buildings
All buildings →
531 5 AVENUEMANHATTAN · latest 10/27/2022
5 jobs
790 RIVERSIDE DRIVEMANHATTAN · 1 open · latest 09/09/2026
2 jobs
545 EAST 11 STREETMANHATTAN · 1 open · latest 08/22/2025
1 jobs
176 BLEECKER STREETMANHATTAN · latest 07/10/2025
1 jobs
215 LEXINGTON AVENUEMANHATTAN · 1 open · latest 06/22/2026
1 jobs
590 5 AVENUEMANHATTAN · latest 10/18/2022
1 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
M01433122 ↗790 RIVERSIDE DRIVE
MANHATTAN
AlterationPermit Issued08/04/202609/09/2026RENOVATE EXISTING APARTMENT 10D BATHROOMS: REMOVE/REPLACE NON-LOAD BEARING PARTITIONS. NEW FLOORING/WALL TILES, SHEET ROCK, CABINETS AND FI…
M01405932 ↗693 5 AVENUE
MANHATTAN
AlterationPermit Issued05/21/202607/22/2026REPLACEMENT OF EXISTING FAN COIL UNITS AND ASSOCIATED PIPING AND ACCESSORIES, INSTALLATION OF SUPPLY DUCT WORK, TOILET EXHAUST AND GENERAL E…
M01417739 ↗215 LEXINGTON AVENUE
MANHATTAN
AlterationPermit Issued06/16/202606/22/2026RENOVATE 21st FLOOR: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING AND FLOOR FINISHES. INSTALL NEW NON-LOAD BEARING PARTITIONS, FLOORING …
X01351073 ↗2510 MARION AVENUE
BRONX
AlterationSigned-off01/27/202602/18/2026INSTALLATION OF TWO MIN-SPLIT SYSTEM (TWO CONDENSERS, THREE AIR-HANDLERS) TO ADDRESS FDNY VIOLATION 14184024J AS PER PLANS FILED.NO CHANGE I…
M01231265 ↗545 EAST 11 STREET
MANHATTAN
AlterationPermit Issued07/18/202508/22/2025REMOVE EX'G RAISED WOOD FLOOR'G AND CONCRETE, REMOVE SUSPENDED CEIL'G, LATHE & PLASTER CEIL'G. TO REMAIN. INSTALL NEW CONCRETE FLOOR'G ON GR…
M01218488 ↗176 BLEECKER STREET
MANHATTAN
AlterationSigned-off05/17/202507/10/2025RENOVATE EXISTING STORE: REMOVE NON-LOAD BEARING PARTITION, RENOVATE EXISTING TOILET, REPLACE COUNTERS AND SEATING AS PER PLANS FILED. NO CH…
Counts cover all 20 jobs (20 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
20 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 20Open permit 5Signed off 15
20 jobs
JobAddressTypeStatusFiledLatest permitDescription
M01433122 ↗790 RIVERSIDE DRIVE
MANHATTAN
AlterationPermit Issued08/04/202609/09/2026RENOVATE EXISTING APARTMENT 10D BATHROOMS: REMOVE/REPLACE NON-LOAD BEARING PARTITIONS. NEW FLOORING/WALL TILES, SHEET ROCK, CABINETS AND FI…
M01405932 ↗693 5 AVENUE
MANHATTAN
AlterationPermit Issued05/21/202607/22/2026REPLACEMENT OF EXISTING FAN COIL UNITS AND ASSOCIATED PIPING AND ACCESSORIES, INSTALLATION OF SUPPLY DUCT WORK, TOILET EXHAUST AND GENERAL E…
M01417739 ↗215 LEXINGTON AVENUE
MANHATTAN
AlterationPermit Issued06/16/202606/22/2026RENOVATE 21st FLOOR: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING AND FLOOR FINISHES. INSTALL NEW NON-LOAD BEARING PARTITIONS, FLOORING …
X01351073 ↗2510 MARION AVENUE
BRONX
AlterationSigned-off01/27/202602/18/2026INSTALLATION OF TWO MIN-SPLIT SYSTEM (TWO CONDENSERS, THREE AIR-HANDLERS) TO ADDRESS FDNY VIOLATION 14184024J AS PER PLANS FILED.NO CHANGE I…
M01231265 ↗545 EAST 11 STREET
MANHATTAN
AlterationPermit Issued07/18/202508/22/2025REMOVE EX'G RAISED WOOD FLOOR'G AND CONCRETE, REMOVE SUSPENDED CEIL'G, LATHE & PLASTER CEIL'G. TO REMAIN. INSTALL NEW CONCRETE FLOOR'G ON GR…
M01218488 ↗176 BLEECKER STREET
MANHATTAN
AlterationSigned-off05/17/202507/10/2025RENOVATE EXISTING STORE: REMOVE NON-LOAD BEARING PARTITION, RENOVATE EXISTING TOILET, REPLACE COUNTERS AND SEATING AS PER PLANS FILED. NO CH…
M01172017 ↗944 PARK AVENUE
MANHATTAN
AlterationSigned-off03/17/202505/06/2025REPLACE/INSTALL PLUMBING FIXTURES FOR DOCTORS OFFICE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01196021 ↗550 PARK AVENUE
MANHATTAN
AlterationSigned-off04/03/202504/28/2025THE SCOPE OF WORK INVOLVES THE FOLLOWING:INSTALLATION OF AIR CONDITIONING UNITS, AIR HANDLERS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS…
M00905766 ↗790 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off08/23/202302/06/2024RENOVATE EXISTING APARTMENT 5E: INTERIOR DEMOLITION OF BATHROOMS, KITCHEN, BEDROOM AND NON-LOAD BEARING PARTITIONS. NEW WOOD FLOORING & TIL…
X00981068 ↗878 TIFFANY STREET
BRONX
AlterationSigned-off01/03/202401/09/2024ECB VIOLATION 039101665K: ENTIRE LENGTH OF MASONRY FRONT PARAPET ( APPROX. 25-LINER FEET ) COLLAPSED ON TO PED. SIDEWALK AT EXPOSURE # 04 AL…
M08045540 ↗950 PARK AVENUE
MANHATTAN
AlterationSigned-off02/03/202305/05/2023RENOVATE EXISTING MEDICAL OFFICE 1GL: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING ANDFLOOR FINISHES.INSTALL NEW NON-LOAD BEARING PARTIT…
X08039045 ↗1120 ELDER AVENUE
BRONX
AlterationPermit Issued11/14/202201/05/2023TO ADDRESS VIOLATIONS VAC X264/2022, 39073085Z & 39073083P: REMOVAL OF 3-BEDROOMS, 2-BATHROOMS, KITCHEN IN CELLAR, REMOVAL OF SHED AND COMME…
M00741343 ↗531 5 AVENUE
MANHATTAN
AlterationSigned-off05/24/202210/27/2022MOFIFY EXISTING MECHANICAL DUCTS AS PER PLANS FILED. NO CHANG EIN USE, EGRESS OR OCCUPANCY.
M00612860 ↗590 5 AVENUE
MANHATTAN
AlterationSigned-off11/15/202110/18/2022Installation of new partitions, doors, suspended ceilings and finishes on the 11th floor (Plastic Surgery Institute) as per plans. No chang…
M00741418 ↗531 5 AVENUE
MANHATTAN
AlterationSigned-off05/24/202208/15/2022NEW NON-LOAD BEARING PARTITIONS, NEW FINISH FLOORINGAND MILLWORK AS PER PLANS FILED. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B00762210 ↗5813 20 AVENUE
BROOKLYN
AlterationSigned-off07/15/202207/26/2022EXISTING 2 SCHOOL STORY BUILDING . ONLY WORK IS TO REPLACE EXISTING HVAC UNIT WITH NEW ONE. NO CHANGE IN EGRESS, USE, BULK, OR OCCUPANCY
M00712148 ↗531 5 AVENUE
MANHATTAN
AlterationSigned-off04/07/202205/24/2022NEW NON-LOAD BEARING PARTITIONS, VCT FLOORING AND MILLWORK AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00662941 ↗400 EAST 56 STREET
MANHATTAN
AlterationSigned-off02/08/202203/24/2022RENOVATE EXISTING APARTMENT 20D: DEMOLITION/CONSTRUCTION OF BATHROOM AND KITCHEN AND MISC. WORK- REFINISH EXISTING WOOD FLOORING, NEW CABINE…
M00525773 ↗531 5 AVENUE
MANHATTAN
AlterationSigned-off05/25/202107/01/2021NEW NON-LOAD BEARING PARTITIONS, NEW FINISH FLOORING AND MILLWORK AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00528851 ↗531 5 AVENUE
MANHATTAN
AlterationSigned-off05/26/202107/01/2021MODIFY EXISTING DUCTS AS PER PLANS FILED. NO CHANG EIN USE, EGRESS OR OCCUPANCY.
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
ELTERMAN FINER ARCHITECTS PC1306/19/2026
NEWTEC ENGINEERING306/19/2026
TECC SOLUTIONS212/08/2025
RALPH P. ALBANESE, ARCHITECT107/15/2022
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
LYTER GROUP INC303/05/2023
CREDENCE CONSTRUCTION COR205/24/2022
DOVAL PLBG & HTG CORP206/19/2026
FOUR STAR AIR CON'D CO LL206/19/2026
GREAT INTERIOR RENOVATION206/19/2026
OASIS PLOMO CORP201/27/2026
1625 DB INC108/04/2026
ADDVANCE CONSTUCTION INC108/08/2025
ADDVANCED CARPENTRY INC106/16/2026
D.H.E. COMPANY, INC102/03/2023
DW PLUMBING INC103/05/2023
GOLDEN CONSTRUCTION NY CO108/23/2023
MACREDDIN PLBG & HTG INC108/08/2025
NYC RENOVATION INC105/24/2022
PLATINUM PLBG & HTG INC108/04/2026
QUINNCO OF NY, INC105/25/2026
SKENDER & BENJAMIN INC102/08/2022
SYMMETRICAL CONSTRUC CORP111/14/2022
TARGET NEW YORK CONST.INC104/29/2026
TOWNHOUSE BUILDERS INC107/15/2022
TRIBESMEN GENERAL CONTRAR105/24/2022
VERTEX P & H CORP104/29/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
THE MOINIAN GROUP305/24/2022
550 STEWART ACQUISITION LLC103/05/2023
BHS104/29/2026
COLLIERS INT.106/19/2026
OLM101/27/2026
SPIRE DEVELOPMENT CORP.112/08/2025
The Father's Heart Ministries105/25/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
ASAP ASSOCIATES CORP107/15/2022
RIZZO GROUP103/05/2023
Click a row for this entity's own jobs, plans and documents at that building.
BuildingFilingsMost Recent
790 RIVERSIDE DRIVE ↗208/04/2026
215 LEXINGTON AVENUE ↗106/16/2026
545 EAST 11 STREET ↗205/25/2026
693 5 AVENUE ↗105/21/2026
550 PARK AVENUE ↗304/29/2026
2510 MARION AVENUE ↗101/27/2026
944 PARK AVENUE ↗208/26/2025
176 BLEECKER STREET ↗206/26/2025
878 TIFFANY STREET ↗101/03/2024
590 5 AVENUE ↗303/05/2023
950 PARK AVENUE ↗102/03/2023
1120 ELDER AVENUE ↗111/14/2022
5813 20 AVENUE ↗107/15/2022
531 5 AVENUE ↗505/24/2022
400 EAST 56 STREET ↗102/08/2022
▾Special Inspection Requirements — 67
DateRequirementBuildingInspectorRole
07/19/2026Energy Code Compliance Inspections790 RIVERSIDE DRIVESAMUEL MATHERprogress
07/19/2026Final790 RIVERSIDE DRIVENAVEEN KUMARprogress
07/19/2026Fire-Resistant Penetrations and Joints790 RIVERSIDE DRIVESAMUEL MATHERspecial
07/19/2026Lighting in dwelling units790 RIVERSIDE DRIVESAMUEL MATHERenergy_progress
06/16/2026Interior lighting power215 LEXINGTON AVENUECARL FINERenergy_progress
06/16/2026Lighting controls215 LEXINGTON AVENUECARL FINERenergy_progress
06/16/2026Fire-Resistant Penetrations and Joints215 LEXINGTON AVENUESAMUEL MATHERspecial
06/16/2026Final215 LEXINGTON AVENUECARL FINERprogress
05/29/2026Lighting controls545 EAST 11 STREETSAMUEL MATHERenergy_progress
05/29/2026Interior lighting power545 EAST 11 STREETSAMUEL MATHERenergy_progress
05/29/2026Energy Code Compliance Inspections545 EAST 11 STREETSAMUEL MATHERprogress
05/29/2026Fire-Resistance Rated Construction545 EAST 11 STREETSAMUEL MATHERprogress
05/29/2026Concrete - Cast-In-Place545 EAST 11 STREETSAMUEL MATHERspecial
05/29/2026Fire-Resistant Penetrations and Joints545 EAST 11 STREETSAMUEL MATHERspecial
05/29/2026Structural Stability – Alterations of existing buildings545 EAST 11 STREETSAMUEL MATHERspecial
05/21/2026Interior lighting power693 5 AVENUECARL FINERenergy_progress
05/21/2026Lighting controls693 5 AVENUECARL FINERenergy_progress
05/21/2026Fire-Resistance Rated Construction693 5 AVENUECARL FINERprogress
05/21/2026Energy Code Compliance Inspections693 5 AVENUECARL FINERprogress
05/21/2026Final693 5 AVENUECARL FINERprogress
05/21/2026Post-installed Anchors693 5 AVENUEJoseph Vutospecial
05/21/2026Fire-Resistant Penetrations and Joints693 5 AVENUESAMUEL MATHERspecial
01/24/2026Energy Code Compliance Inspections2510 MARION AVENUESAMUEL MATHERprogress
01/24/2026Mechanical Systems2510 MARION AVENUESAMUEL MATHERspecial
01/24/2026Final2510 MARION AVENUENAVEEN KUMARprogress
12/30/2025Fire-Resistance Rated Construction545 EAST 11 STREETSAMUEL MATHERprogress
12/30/2025Interior lighting power545 EAST 11 STREETSAMUEL MATHERenergy_progress
12/30/2025Lighting controls545 EAST 11 STREETSAMUEL MATHERenergy_progress
12/30/2025Structural Stability – Alterations of existing buildings545 EAST 11 STREETSAMUEL MATHERspecial
12/30/2025Fire-Resistant Penetrations and Joints545 EAST 11 STREETSAMUEL MATHERspecial
12/30/2025Concrete - Cast-In-Place545 EAST 11 STREETSAMUEL MATHERspecial
12/30/2025Energy Code Compliance Inspections545 EAST 11 STREETSAMUEL MATHERprogress
10/08/2025Lighting controls944 PARK AVENUECARL FINERenergy_progress
10/08/2025Fenestration and door U-factor and product ratings944 PARK AVENUECARL FINERenergy_progress
10/08/2025Interior lighting power944 PARK AVENUECARL FINERenergy_progress
10/08/2025Fenestration air leakage944 PARK AVENUECARL FINERenergy_progress
10/08/2025Final944 PARK AVENUECARL FINERprogress
10/08/2025Energy Code Compliance Inspections944 PARK AVENUECARL FINERprogress
10/08/2025Fire-Resistant Penetrations and Joints944 PARK AVENUESAMUEL MATHERspecial
08/19/2025Energy Code Compliance Inspections944 PARK AVENUECARL FINERprogress
08/19/2025Final944 PARK AVENUECARL FINERprogress
08/19/2025Fire-Resistant Penetrations and Joints944 PARK AVENUESAMUEL MATHERspecial
08/05/2025Lighting controls550 PARK AVENUECARL FINERenergy_progress
08/05/2025Fenestration air leakage550 PARK AVENUECARL FINERenergy_progress
08/05/2025Fire-Resistant Penetrations and Joints550 PARK AVENUESAMUEL MATHERspecial
08/05/2025Energy Code Compliance Inspections550 PARK AVENUECARL FINERprogress
08/05/2025Final550 PARK AVENUECARL FINERprogress
08/05/2025Interior lighting power550 PARK AVENUECARL FINERenergy_progress
08/05/2025Fenestration and door U-factor and product ratings550 PARK AVENUECARL FINERenergy_progress
07/08/2025Tenant Protection Plan Compliance176 BLEECKER STREETSAMUEL MATHERspecial
Latest 50 of 67.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
09/03/2026M00525773-I1Request digital key ↗
09/03/2026M00528851-I1Request digital key ↗
09/02/2026M00662941-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits22
▸DOB NOWLPC Approval/Permit22
08/22/2026M01218488-S1Open ↗
08/22/2026M01218488-I1Open ↗
08/17/2026M01196021-P3Open ↗
Showing 3 of 22 on file for this type
▸Seals & Professional Certifications130
▸DOB NOWProgress Inspector Seal & Signature60
09/23/2026X01351073-I1Open ↗
09/23/2026X01351073-I1Open ↗
09/02/2026M00741343-I1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/03/2026M00525773-I1Open ↗
09/03/2026M00528851-I1Open ↗
09/02/2026M00662941-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026X01351073-I1Open ↗
09/02/2026M00741343-I1Open ↗
09/01/2026M01417739-I1Open ↗
Showing 3 of 30 on file for this type
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
09/03/2026M00525773-I1Open ↗
09/03/2026M00528851-I1Open ↗
09/02/2026M00662941-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWOER: Notice to Proceed3
08/22/2026M01231265-I1Open ↗
08/22/2026M01231265-P1Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis5
09/02/2026M00712148-I1Open ↗
09/02/2026M00741418-I1Open ↗
08/13/2026M00662941-I1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/29/2026B00762210-I1Open ↗
08/22/2026M01231265-P1Open ↗
08/13/2026X01351073-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type