← Back
Special Inspection Agency
SET ARCHITECTURE PLLC
Special Inspection Agency
3 projects with open permitsBROOKLYN · 2MANHATTAN · 1
2 buildings
16
Total Filings
3
Projects on File
2
Buildings Worked
3
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month3 projects all-time
0123Jun '21 · 2May '22 · 1Jun '21Aug '21Oct '21Dec '21Feb '22Apr '22May '22
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit3100%
By project type
Alteration2
Alteration CO1
Most active buildings
All buildings →
85 ARGYLE ROADBROOKLYN · 2 open · latest 06/09/2022
2 projects
45 EAST 68 STREETMANHATTAN · 1 open · latest 11/17/2025
1 projects
Key relationships
Everyone →
Filing representatives
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00734881 ↗45 EAST 68 STREET
MANHATTAN
Alteration COPermit Issued05/20/202211/17/2025STRUCTURAL WORK AS PER PLANS FILED HEREWITH.
B00453555 ↗85 ARGYLE ROAD
BROOKLYN
AlterationPermit Issued06/02/202106/09/2022RENOVATIONS TO EXISTING ONE FAMILY DWELLING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00453985 ↗85 ARGYLE ROAD
BROOKLYN
AlterationPermit Issued06/02/202102/01/2022PLUMBING WORK FOR RENOVATIONS TO EXISTING ONE FAMILY DWELLING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AMERICAN STANDARD P&H COR102/02/2026
EH PLUMBING & HEATING COR109/14/2022
H & K RENOVATION INC102/02/2026
VLI CONSTRUCTION INC109/14/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
CONVERSANO ASSOCIATES, INC.302/02/2026
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Open permit 3
Any typeAlteration 2Alteration CO 1
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00734881 ↗45 EAST 68 STREET
MANHATTAN
Alteration COPermit Issued05/20/202211/17/2025STRUCTURAL WORK AS PER PLANS FILED HEREWITH.
B00453555 ↗85 ARGYLE ROAD
BROOKLYN
AlterationPermit Issued06/02/202106/09/2022RENOVATIONS TO EXISTING ONE FAMILY DWELLING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00453985 ↗85 ARGYLE ROAD
BROOKLYN
AlterationPermit Issued06/02/202102/01/2022PLUMBING WORK FOR RENOVATIONS TO EXISTING ONE FAMILY DWELLING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
45 EAST 68 STREET ↗1002/02/2026
85 ARGYLE ROAD ↗609/14/2022
▾Special Inspection Requirements — 24
DateRequirementBuildingInspectorRole
12/16/2025Fire-Resistance Rated Construction45 EAST 68 STREETSTEPHEN TANENBAUMprogress
12/16/2025Final45 EAST 68 STREETSTEPHEN TANENBAUMprogress
12/16/2025Structural Stability – Alterations of existing buildings45 EAST 68 STREETSTEPHEN TANENBAUMspecial
12/16/2025Mechanical Systems45 EAST 68 STREETSTEPHEN TANENBAUMspecial
12/16/2025Fire-Resistant Penetrations and Joints45 EAST 68 STREETSTEPHEN TANENBAUMspecial
02/04/2025Fire-Resistant Penetrations and Joints45 EAST 68 STREETSTEPHEN TANENBAUMspecial
08/14/2024Fire-Resistant Penetrations and Joints45 EAST 68 STREETSTEPHEN TANENBAUMspecial
08/14/2024Mechanical Systems45 EAST 68 STREETSTEPHEN TANENBAUMspecial
08/14/2024Structural Stability – Alterations of existing buildings45 EAST 68 STREETSTEPHEN TANENBAUMspecial
08/14/2024Final45 EAST 68 STREETSTEPHEN TANENBAUMprogress
08/14/2024Fire-Resistance Rated Construction45 EAST 68 STREETSTEPHEN TANENBAUMprogress
08/09/2023Fire-Resistant Penetrations and Joints45 EAST 68 STREETSTEPHEN TANENBAUMspecial
03/20/2023Fire-Resistant Penetrations and Joints45 EAST 68 STREETSTEPHEN TANENBAUMspecial
03/20/2023Fire-Resistance Rated Construction45 EAST 68 STREETSTEPHEN TANENBAUMprogress
03/20/2023Fire-Resistant Penetrations and Joints45 EAST 68 STREETSTEPHEN TANENBAUMspecial
03/20/2023Mechanical Systems45 EAST 68 STREETSTEPHEN TANENBAUMspecial
03/20/2023Structural Stability – Alterations of existing buildings45 EAST 68 STREETSTEPHEN TANENBAUMspecial
03/20/2023Final45 EAST 68 STREETSTEPHEN TANENBAUMprogress
09/19/2022Fire-Resistant Penetrations and Joints85 ARGYLE ROADSTEPHEN TANENBAUMspecial
09/19/2022Fire-Resistant Penetrations and Joints85 ARGYLE ROADSTEPHEN TANENBAUMspecial
09/19/2022Final85 ARGYLE ROADSTEPHEN TANENBAUMprogress
09/13/2022Fire-Resistant Penetrations and Joints85 ARGYLE ROADSTEPHEN TANENBAUMspecial
01/05/2022Final85 ARGYLE ROADSTEPHEN TANENBAUMprogress
01/05/2022Fire-Resistant Penetrations and Joints85 ARGYLE ROADSTEPHEN TANENBAUMspecial
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch12
09/01/2026M00734881-I1 · 45 EAST 68 STREETOpen ↗
Showing 1 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026B00453985-P2 · 85 ARGYLE ROADRequest digital key ↗
08/28/2026B00453985-P1 · 85 ARGYLE ROADRequest digital key ↗
08/15/2026B00453985-P1 · 85 ARGYLE ROADRequest digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/28/2026B00453555-P2 · 85 ARGYLE ROADRequest digital key ↗
08/28/2026B00453555-P1 · 85 ARGYLE ROADRequest digital key ↗
08/28/2026B00453555-I1 · 85 ARGYLE ROADRequest digital key ↗
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit17
08/13/2026B00453985-P2 · 85 ARGYLE ROADOpen ↗
08/13/2026B00453985-P1 · 85 ARGYLE ROADOpen ↗
08/13/2026B00453555-I1 · 85 ARGYLE ROADOpen ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/13/2026B00453555-P1 · 85 ARGYLE ROADOpen ↗
08/13/2026B00453555-I1 · 85 ARGYLE ROADOpen ↗
08/13/2026B00453985-P2 · 85 ARGYLE ROADOpen ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/05/2026M00734881-S3 · 45 EAST 68 STREETOpen ↗
09/05/2026M00734881-S3 · 45 EAST 68 STREETOpen ↗
09/05/2026M00734881-S3 · 45 EAST 68 STREETOpen ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/05/2026M00734881-S3 · 45 EAST 68 STREETOpen ↗
08/30/2026B00453555-I1 · 85 ARGYLE ROADOpen ↗
08/27/2026B00453555-P1 · 85 ARGYLE ROADOpen ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B00453985-I1 · 85 ARGYLE ROADOpen ↗
08/13/2026B00453985-P1 · 85 ARGYLE ROADOpen ↗
08/13/2026B00453555-I1 · 85 ARGYLE ROADOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents10
▸DOB NOWProof of Historic Building5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type