| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01443059 ↗ | 322 MIDWOOD STREET BROOKLYN | Alteration | Permit Issued | 08/18/2026 | 09/15/2026 | Design SINGH ENGINEERING Owner 322 MIDWOOD Contractor BLUE GNRL CONSTR HOME IMP | INTERIOR RENOVATION OF CELLAR TO USE AS ACCESSORY |
| Q01357123 ↗ | 127-01 101 AVENUE QUEENS | Alteration CO | Filed — no permit on record | 03/09/2026 | — | Design SINGH ENGINEERING | — |
| Q01269189 ↗ | 127-01 101 AVENUE QUEENS | Alteration | Filed — no permit on record | 10/09/2025 | — | Design SINGH ENGINEERING | — |
| Q00394061 ↗ | 94-44 201 STREET QUEENS | Alteration | Permit Issued | 09/03/2020 | 01/05/2023 | Design SINGH ENGINEERING Contractor LLOYD G DRUMMOND PLBG&GEN | GAS DRYER ON 1ST AND STOVE ON 2ND FLOOR, GAS PIPING WORK TO COMPLY WITH FGC 2014. NEW BOILER AND GAS METER IN CELLAR.CELLAR-WC,LAV,1ST FL-MO… |
| B00572754 ↗ | 741 EAST 22 STREET BROOKLYN | Alteration | Signed-off | 08/31/2021 | 11/18/2022 | Design SINGH ENGINEERING Contractor LLOYD G DRUMMOND PLBG&GEN | DIVIDE EXISTING BATHROOM SPACE INTO TWO BATHROOM SPACES. REMOVE TWO EXISTING FIXTURES WITH FOUR NEW FIXTURES |
| Q00477030 ↗ | 254-04 84 ROAD QUEENS | Alteration | Signed-off | 03/20/2021 | 07/28/2021 | Design SINGH ENGINEERING Contractor HORBRIDGE PLUMBING & HEAT | LEGALIZE TUB,TOILET,SINK,WASHING MACHINE AND GAS DRYER IN CELLAR |
| Name | Projects together | Most recent |
|---|---|---|
| SINGH ENGINEERING | 8 | 08/19/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| LLOYD G DRUMMOND PLBG&GEN | 2 | 10/03/2022 |
| BLUE GNRL CONSTR HOME IMP | 1 | 08/19/2026 |
| DRM CONSTRUCTION CORP | 1 | 03/20/2021 |
| HORBRIDGE PLUMBING & HEAT | 1 | 03/20/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| 322 MIDWOOD | 1 | 08/19/2026 |
| UNIQUE IMPRESSIONS CONSTRUCTION, CO | 1 | 03/09/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01443059 ↗ | 322 MIDWOOD STREET BROOKLYN | Alteration | Permit Issued | 08/18/2026 | 09/15/2026 | Design SINGH ENGINEERING Owner 322 MIDWOOD Contractor BLUE GNRL CONSTR HOME IMP | INTERIOR RENOVATION OF CELLAR TO USE AS ACCESSORY |
| Q01357123 ↗ | 127-01 101 AVENUE QUEENS | Alteration CO | Filed — no permit on record | 03/09/2026 | — | Design SINGH ENGINEERING | — |
| Q01269189 ↗ | 127-01 101 AVENUE QUEENS | Alteration | Filed — no permit on record | 10/09/2025 | — | Design SINGH ENGINEERING | — |
| Q00394061 ↗ | 94-44 201 STREET QUEENS | Alteration | Permit Issued | 09/03/2020 | 01/05/2023 | Design SINGH ENGINEERING Contractor LLOYD G DRUMMOND PLBG&GEN | GAS DRYER ON 1ST AND STOVE ON 2ND FLOOR, GAS PIPING WORK TO COMPLY WITH FGC 2014. NEW BOILER AND GAS METER IN CELLAR.CELLAR-WC,LAV,1ST FL-MO… |
| B00572754 ↗ | 741 EAST 22 STREET BROOKLYN | Alteration | Signed-off | 08/31/2021 | 11/18/2022 | Design SINGH ENGINEERING Contractor LLOYD G DRUMMOND PLBG&GEN | DIVIDE EXISTING BATHROOM SPACE INTO TWO BATHROOM SPACES. REMOVE TWO EXISTING FIXTURES WITH FOUR NEW FIXTURES |
| Q00477030 ↗ | 254-04 84 ROAD QUEENS | Alteration | Signed-off | 03/20/2021 | 07/28/2021 | Design SINGH ENGINEERING Contractor HORBRIDGE PLUMBING & HEAT | LEGALIZE TUB,TOILET,SINK,WASHING MACHINE AND GAS DRYER IN CELLAR |
| Q00476971 ↗ | 254-04 84 ROAD QUEENS | Alteration | Signed-off | 03/20/2021 | 07/13/2021 | Design SINGH ENGINEERING Contractor DRM CONSTRUCTION CORP | LEGALIZATION OF FINISH CELLAR WITH 3 PIECE BATHROOM, WASHER AND DRYER |
| B00293689 ↗ | 143 WAVERLY AVENUE BROOKLYN | Alteration | Filed — no permit on record | 02/11/2020 | — | Design SINGH ENGINEERING | — |
| Building | Filings | Most Recent |
|---|---|---|
| 322 MIDWOOD STREET ↗ | 2 | 08/19/2026 |
| 127-01 101 AVENUE ↗ | 2 | 03/09/2026 |
| 94-44 201 STREET ↗ | 2 | 10/03/2022 |
| 741 EAST 22 STREET ↗ | 1 | 08/31/2021 |
| 254-04 84 ROAD ↗ | 2 | 03/20/2021 |
| 143 WAVERLY AVENUE ↗ | 1 | 02/11/2020 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/11/2026 | Fire-Resistant Penetrations and Joints | 322 MIDWOOD STREET | Jogendra Bagga | special |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | 322 MIDWOOD STREET | Jogendra Bagga | special |
| 08/11/2026 | Energy Code Compliance Inspections | 322 MIDWOOD STREET | Jogendra Bagga | progress |
| 08/08/2026 | Structural Stability – Alterations of existing buildings | 322 MIDWOOD STREET | Jogendra Bagga | special |
| 06/30/2026 | Fenestration air leakage | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 06/30/2026 | Maintenance information | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 06/30/2026 | Permanent certificate | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 06/30/2026 | Protection of exposed foundation insulation | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 03/27/2026 | Excavations - Sheeting, Shoring, and Bracing | 127-01 101 AVENUE | — | special |
| 03/05/2026 | Fenestration areas | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 03/05/2026 | Fenestration and door U-factor and product ratings | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 03/05/2026 | Lighting in dwelling units | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 03/05/2026 | Insulation placement and R values | 127-01 101 AVENUE | Jogendra Bagga | energy_progress |
| 03/04/2026 | Structural Stability – Alterations of existing buildings | 127-01 101 AVENUE | Jogendra Bagga | special |
| 02/08/2026 | Final | 127-01 101 AVENUE | Jogendra Bagga | progress |
| 12/03/2022 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 94-44 201 STREET | Jogendra Bagga | special |
| 12/03/2022 | Fire-Resistant Penetrations and Joints | 94-44 201 STREET | Jogendra Bagga | special |
| 12/03/2022 | Energy Code Compliance Inspections | 94-44 201 STREET | Jogendra Bagga | progress |
| 10/02/2022 | Fire-Resistant Penetrations and Joints | 94-44 201 STREET | Jogendra Bagga | special |
| 10/02/2022 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 94-44 201 STREET | Jogendra Bagga | special |
| 10/02/2022 | Energy Code Compliance Inspections | 94-44 201 STREET | Jogendra Bagga | progress |
| 08/31/2021 | Maintenance information | 741 EAST 22 STREET | Jogendra Bagga | energy_progress |
| 08/26/2021 | Energy Code Compliance Inspections | 741 EAST 22 STREET | Jogendra Bagga | progress |
| 08/26/2021 | Fire-Resistant Penetrations and Joints | 741 EAST 22 STREET | Jogendra Bagga | special |
| 03/15/2021 | Fire-Resistant Penetrations and Joints | 254-04 84 ROAD | Jogendra Bagga | special |
| 03/15/2021 | Energy Code Compliance Inspections | 254-04 84 ROAD | Jogendra Bagga | progress |
| 03/15/2021 | Fenestration and door U-factor and product ratings | 254-04 84 ROAD | Jogendra Bagga | energy_progress |
| 03/15/2021 | Lighting in dwelling units | 254-04 84 ROAD | Jogendra Bagga | energy_progress |
| 03/15/2021 | Insulation placement and R values | 254-04 84 ROAD | Jogendra Bagga | energy_progress |
| 03/15/2021 | Fire-Resistant Penetrations and Joints | 254-04 84 ROAD | Jogendra Bagga | special |
| 03/15/2021 | HVAC-R and service water piping design and insulation | 254-04 84 ROAD | Jogendra Bagga | energy_progress |