Special Inspection Agency
1 project with open permitsMANHATTAN · 9
7 buildings
19
Total Filings
9
Projects on File
7
Buildings Worked
1
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month9 projects all-time
0123Jan '21 · 2Mar '21 · 1Aug '22 · 1Jun '23 · 1Jul '24 · 1Jul '25 · 1Oct '25 · 1Jun '26 · 1202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit111%
Signed off778%
Filed only111%
By project type
Alteration9
Most active buildings
All buildings →
140 RIVERSIDE DRIVEMANHATTAN · latest 08/26/2021
3 projects
447 EAST 57 STREETMANHATTAN · latest 10/02/2023
1 projects
30 SUTTON PLACEMANHATTAN · 1 open · latest 11/28/2025
1 projects
55 EAST 72 STREETMANHATTAN · latest 06/03/2026
1 projects
156 EAST 79 STREETMANHATTAN · latest 08/04/2025
1 projects
180 EAST END AVENUEMANHATTAN · latest 07/22/2023
1 projects
Key relationships
Everyone →
Filing representatives
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01408893 ↗55 EAST 72 STREET
MANHATTAN
AlterationFiled — no permit on record06/03/2026——
M01298661 ↗30 SUTTON PLACE
MANHATTAN
AlterationPermit Issued10/09/202511/28/2025Apt. #1A, replace kitchen floor. Install new cabinetry and stone fireplace. Minor int. electrical work. Plumbing work to be filed under S1 a…
M01244706 ↗9 EAST 96 STREET
MANHATTAN
AlterationSigned-off07/08/202511/10/2025REPLACE WOOD FLOORING THROUGHOUT, NEW SOFFITS, NEW FINISHES. CREATE NEW MASONRY OPENING FOR CONDENSER. MS WORK TO BE FILED UNDER SUBSEQUENT …
M01077670 ↗156 EAST 79 STREET
MANHATTAN
AlterationSigned-off07/23/202408/04/2025Install new plubing fixtures to apt. #12B. No change in egress, occupancy or use.
M00791567 ↗447 EAST 57 STREET
MANHATTAN
AlterationSigned-off08/14/202210/02/2023Plumbing work application to apt. #5B. Install new plumbing fixtures as per plans. No change in egress, occupancy or use.
M00862153 ↗180 EAST END AVENUE
MANHATTAN
AlterationSigned-off06/28/202307/22/2023PLUMBING WORK IN EXISTING APARTMENT 7B. REMOVE, REPLACE RELOCATE AND INSTALL NEW FIXTURES. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
Counts cover all 9 projects (9 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
TURINO KALBERER ARCHITECTS808/20/2026
JACK GREEN ASSOCIATES202/29/2024
VINCENT J. LIOTTA P.E.107/11/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DONATO PLUMBING, INC308/20/2026
A.L.L. CONSTRUCTION AND D208/20/2026
BENCHMARK CONSTRUCTION CO207/11/2025
ALL MAKES HTG & A/C CORP101/11/2021
AP PLUMBING & HVAC LLC110/29/2025
FDL CONTRACTING GROUP INC110/29/2025
LIEBHABER COMPANY INC102/29/2024
MACREDDIN PLBG & HTG INC111/01/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ORSID REALTY CORP211/01/2021
BROWN HARRIS STEVENS106/03/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
OEF CONSULTANTS, LLC708/20/2026
9 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 9Open permit 1Signed off 7Filed only 1
9 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01408893 ↗55 EAST 72 STREET
MANHATTAN
AlterationFiled — no permit on record06/03/2026——
M01298661 ↗30 SUTTON PLACE
MANHATTAN
AlterationPermit Issued10/09/202511/28/2025Apt. #1A, replace kitchen floor. Install new cabinetry and stone fireplace. Minor int. electrical work. Plumbing work to be filed under S1 a…
M01244706 ↗9 EAST 96 STREET
MANHATTAN
AlterationSigned-off07/08/202511/10/2025REPLACE WOOD FLOORING THROUGHOUT, NEW SOFFITS, NEW FINISHES. CREATE NEW MASONRY OPENING FOR CONDENSER. MS WORK TO BE FILED UNDER SUBSEQUENT …
M01077670 ↗156 EAST 79 STREET
MANHATTAN
AlterationSigned-off07/23/202408/04/2025Install new plubing fixtures to apt. #12B. No change in egress, occupancy or use.
M00791567 ↗447 EAST 57 STREET
MANHATTAN
AlterationSigned-off08/14/202210/02/2023Plumbing work application to apt. #5B. Install new plumbing fixtures as per plans. No change in egress, occupancy or use.
M00862153 ↗180 EAST END AVENUE
MANHATTAN
AlterationSigned-off06/28/202307/22/2023PLUMBING WORK IN EXISTING APARTMENT 7B. REMOVE, REPLACE RELOCATE AND INSTALL NEW FIXTURES. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
M00429728 ↗140 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off01/11/202108/26/2021Mechanical work for Apt. PHC, install central A/C filing, add condensers and associated ducts and piping. No change in egress, occupancy or …
M00479752 ↗140 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off03/09/202105/14/2021APT #PHC LOCATED ON THE 20TH FLOOR (ACTUAL FLOOR 'PENTHOUSE ROOF'); MODIFY TWO EXISTING WINDOW MASONRY OPENINGS INTO A SINGLE OPENING AT LIV…
M00448591 ↗140 RIVERSIDE DRIVE
MANHATTAN
AlterationSigned-off01/08/202101/22/2021APT #PHC LOCATED ON THE 20TH FLOOR (ACTUAL FLOOR 'PENTHOUSE ROOF'), REPLACE AND INSTALL NEW PLUMBING FIXTURES. NO CHANGE IN EGRESS, OCCUPANC…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
30 SUTTON PLACE ↗308/20/2026
55 EAST 72 STREET ↗206/03/2026
156 EAST 79 STREET ↗310/29/2025
9 EAST 96 STREET ↗107/08/2025
447 EAST 57 STREET ↗402/29/2024
180 EAST END AVENUE ↗206/28/2023
140 RIVERSIDE DRIVE ↗411/01/2021
▾Special Inspection Requirements — 56
DateRequirementBuildingInspectorRole
08/19/2026Fire-Resistant Penetrations and Joints30 SUTTON PLACEJULIE KALBERERspecial
06/03/2026Fire-Resistance Rated Construction55 EAST 72 STREETJULIE KALBERERprogress
05/28/2026Lighting in dwelling units55 EAST 72 STREETJULIE KALBERERenergy_progress
05/28/2026Energy Code Compliance Inspections55 EAST 72 STREETJULIE KALBERERprogress
05/28/2026Final55 EAST 72 STREETJULIE KALBERERprogress
05/28/2026Fire-Resistant Penetrations and Joints55 EAST 72 STREETJULIE KALBERERspecial
10/22/2025Interior lighting power156 EAST 79 STREETJULIE KALBERERenergy_progress
10/22/2025Fire-Resistance Rated Construction156 EAST 79 STREETJULIE KALBERERprogress
10/22/2025Final156 EAST 79 STREETJULIE KALBERERprogress
10/22/2025Post-installed Anchors156 EAST 79 STREETJULIE KALBERERspecial
10/22/2025Fire-Resistant Penetrations and Joints156 EAST 79 STREETJULIE KALBERERspecial
10/22/2025Lighting in dwelling units156 EAST 79 STREETJULIE KALBERERenergy_progress
10/06/2025Fire-Resistant Penetrations and Joints30 SUTTON PLACEJULIE KALBERERspecial
07/08/2025Post-installed Anchors9 EAST 96 STREETJULIE KALBERERspecial
06/20/2025Fire-Resistant Penetrations and Joints9 EAST 96 STREETJULIE KALBERERspecial
06/20/2025Energy Code Compliance Inspections9 EAST 96 STREETJULIE KALBERERprogress
06/20/2025Fire-Resistance Rated Construction9 EAST 96 STREETJULIE KALBERERprogress
06/20/2025Lighting in dwelling units9 EAST 96 STREETJULIE KALBERERenergy_progress
07/09/2024Fire-Resistant Penetrations and Joints156 EAST 79 STREETJULIE KALBERERspecial
03/11/2024Mechanical Systems447 EAST 57 STREETJACK GREENspecial
03/11/2024Fire-Resistant Penetrations and Joints447 EAST 57 STREETJULIE KALBERERspecial
03/11/2024Final447 EAST 57 STREETJACK GREENprogress
03/11/2024HVAC-R and service water heating equipment447 EAST 57 STREETJACK GREENenergy_progress
03/11/2024Maintenance information447 EAST 57 STREETJACK GREENenergy_progress
03/11/2024HVAC-R and service water piping design and insulation447 EAST 57 STREETJACK GREENenergy_progress
03/11/2024Ventilation and air distribution system447 EAST 57 STREETJACK GREENenergy_progress
03/11/2024Duct leakage testing, insulation and design447 EAST 57 STREETJACK GREENenergy_progress
03/11/2024HVAC-R and service water heating system controls447 EAST 57 STREETJACK GREENenergy_progress
03/11/2024Shutoff dampers447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024Fire-Resistant Penetrations and Joints447 EAST 57 STREETJULIE KALBERERspecial
02/08/2024Mechanical Systems447 EAST 57 STREETJACK GREENspecial
02/08/2024Final447 EAST 57 STREETJACK GREENprogress
02/08/2024HVAC-R and service water heating system controls447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024HVAC-R and service water piping design and insulation447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024Shutoff dampers447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024Ventilation and air distribution system447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024HVAC-R and service water heating equipment447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024Duct leakage testing, insulation and design447 EAST 57 STREETJACK GREENenergy_progress
02/08/2024Maintenance information447 EAST 57 STREETJACK GREENenergy_progress
05/24/2023Fire-Resistant Penetrations and Joints180 EAST END AVENUEJULIE KALBERERspecial
03/13/2023Fire-Resistant Penetrations and Joints447 EAST 57 STREETJULIE KALBERERspecial
08/12/2022Fire-Resistance Rated Construction447 EAST 57 STREETJULIE KALBERERprogress
08/11/2022Lighting in dwelling units447 EAST 57 STREETJULIE KALBERERenergy_progress
08/11/2022Final447 EAST 57 STREETJULIE KALBERERprogress
08/11/2022Energy Code Compliance Inspections447 EAST 57 STREETJULIE KALBERERprogress
08/11/2022Fire-Resistant Penetrations and Joints447 EAST 57 STREETJULIE KALBERERspecial
10/28/2021Fire-Resistant Penetrations and Joints140 RIVERSIDE DRIVEJULIE KALBERERspecial
01/08/2021Energy Code Compliance Inspections140 RIVERSIDE DRIVEJACK GREENprogress
01/08/2021Post-installed Anchors140 RIVERSIDE DRIVEJULIE KALBERERspecial
01/08/2021Fire-Resistant Penetrations and Joints140 RIVERSIDE DRIVEJULIE KALBERERspecial
Latest 50 of 56.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch18
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
▸DOB NOWPlans/Sketch - Mechanical Systems1
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
09/03/2026M00448591-P1 · 140 RIVERSIDE DRIVEOpen ↗
09/03/2026M00448591-I1 · 140 RIVERSIDE DRIVEOpen ↗
08/15/2026M01408893-S1 · 55 EAST 72 STREETOpen ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature39
09/23/2026M01244706-S1 · 9 EAST 96 STREETOpen ↗
09/23/2026M01244706-S1 · 9 EAST 96 STREETOpen ↗
09/02/2026M00791567-I1 · 447 EAST 57 STREETOpen ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/04/2026M00479752-I1 · 140 RIVERSIDE DRIVEOpen ↗
09/03/2026M00448591-P1 · 140 RIVERSIDE DRIVEOpen ↗
09/03/2026M00448591-I1 · 140 RIVERSIDE DRIVEOpen ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M01244706-S1 · 9 EAST 96 STREETOpen ↗
09/02/2026M00791567-P1 · 447 EAST 57 STREETOpen ↗
09/02/2026M00791567-I1 · 447 EAST 57 STREETOpen ↗
Showing 3 of 21 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00429728-I1 · 140 RIVERSIDE DRIVEOpen ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/04/2026M00479752-I1 · 140 RIVERSIDE DRIVEOpen ↗
09/03/2026M00448591-I1 · 140 RIVERSIDE DRIVEOpen ↗
09/03/2026M00448591-P1 · 140 RIVERSIDE DRIVEOpen ↗
Showing 3 of 21 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026M00429728-I1 · 140 RIVERSIDE DRIVEOpen ↗
08/13/2026M00479752-I1 · 140 RIVERSIDE DRIVEOpen ↗
Showing 2 of 4 on file for this type