| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M08021400 ↗ | 176 WAVERLY PLACE MANHATTAN | Alteration | Permit Issued | 10/26/2022 | 03/18/2026 | plumbing work during interior demolition |
| M00407224 ↗ | 73 WEST WASHINGTON PLCE MANHATTAN | Alteration | Permit Issued | 02/18/2021 | 03/05/2026 | 1.INSTALL DOMESTIC HOT WATER HEATER SYSTEM, DOMESTIC HOT/COLD SYSTEM/PIPING, SANITARY/VENT PIPING, GAS PIPING, AND STORM DRAINAGE SYSTEM/PIP… |
| M01328759 ↗ | 71 LAIGHT STREET MANHATTAN | Alteration | Permit Issued | 12/10/2025 | 01/20/2026 | General construction for apartment 2F on 2nd floor |
| M01006555 ↗ | 55 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 05/24/2024 | 12/22/2025 | Renovation of existing Apt#1G. No change of use, egress or occupancy under this application. |
| M08023655 ↗ | 176 WAVERLY PLACE MANHATTAN | Alteration | Permit Issued | 10/26/2022 | 10/09/2025 | plumbing work during interior demolition |
| M01013665 ↗ | 308 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 03/29/2024 | 01/08/2025 | FACADE REPAIRS FOR COMPLIANCE WITH LL11 FACADE INSPECTION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M08021400 ↗ | 176 WAVERLY PLACE MANHATTAN | Alteration | Permit Issued | 10/26/2022 | 03/18/2026 | plumbing work during interior demolition |
| M00407224 ↗ | 73 WEST WASHINGTON PLCE MANHATTAN | Alteration | Permit Issued | 02/18/2021 | 03/05/2026 | 1.INSTALL DOMESTIC HOT WATER HEATER SYSTEM, DOMESTIC HOT/COLD SYSTEM/PIPING, SANITARY/VENT PIPING, GAS PIPING, AND STORM DRAINAGE SYSTEM/PIP… |
| M01328759 ↗ | 71 LAIGHT STREET MANHATTAN | Alteration | Permit Issued | 12/10/2025 | 01/20/2026 | General construction for apartment 2F on 2nd floor |
| M01006555 ↗ | 55 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 05/24/2024 | 12/22/2025 | Renovation of existing Apt#1G. No change of use, egress or occupancy under this application. |
| M08023655 ↗ | 176 WAVERLY PLACE MANHATTAN | Alteration | Permit Issued | 10/26/2022 | 10/09/2025 | plumbing work during interior demolition |
| M01013665 ↗ | 308 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 03/29/2024 | 01/08/2025 | FACADE REPAIRS FOR COMPLIANCE WITH LL11 FACADE INSPECTION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01001423 ↗ | 462 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 05/09/2024 | 09/19/2024 | Herewith filing general construction work to repair bulkhead, vault and sidewalk as per plans submitted. There is no change in use, egress … |
| M01008819 ↗ | 462 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 05/09/2024 | 09/19/2024 | Herewith filing structural plans as per plans submitted. |
| M01057421 ↗ | 217 BROADWAY MANHATTAN | Alteration | Signed-off | 07/15/2024 | 07/31/2024 | FACADE REPAIR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00956859 ↗ | 62 WEST 62 STREET MANHATTAN | Alteration | Permit Issued | 01/12/2024 | 05/15/2024 | Refinishing floors & walls throughout. New kitchen in existing secondary kitchen location. New laundry room in existing kitchen location. Re… |
| M00650656 ↗ | 30 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 04/25/2022 | 12/12/2023 | Proposed facade repair filed in conjunction with repairs as outlined in Local Law Report Cycle 9 to repair parapets, windows, window headers… |
| M00490745 ↗ | 900 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/15/2021 | 03/07/2022 | Demolish and construct interior partitions, ceilings and doors as shown on drawings filed herewith. |
| M00494601 ↗ | 900 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2021 | 06/23/2021 | Modify plumbing fixtures and related piping as shown on drawings filed herewith. |
| Name | Jobs together | Most recent |
|---|---|---|
| SUK DESIGN GROUP LLP | 11 | 03/19/2026 |
| RJD ENGINEERING LLC | 2 | 11/09/2022 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 1 | 02/13/2025 |
| OLD STRUCTURES ENGINEERING | 1 | 05/09/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| BLAZE PLUMBING & HEATING | 3 | 02/13/2025 |
| M&A PROJECTS RESTORATION* | 3 | 06/20/2025 |
| ANVA LLC | 2 | 11/09/2022 |
| DUTCHMAN CONTRACTING INC | 2 | 01/12/2024 |
| FANUKA INC | 2 | 03/19/2026 |
| REGELE BUILDERS, INC | 2 | 03/19/2026 |
| DONATO PLUMBING, INC | 1 | 07/07/2022 |
| NEW ERA MECHANICAL SER IN | 1 | 11/09/2022 |
| ROSENWACH TANK CO. LLC | 1 | 05/21/2025 |
| SATO CONSTRUCTION CO.INC | 1 | 05/10/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| 29 E 29TH HOTEL | 1 | 05/10/2024 |
| 73 WASH PLACE, LLC | 1 | 02/13/2025 |
| COLONNADE MANAGEMENT | 1 | 06/20/2025 |
| SCOTT SALVATOR INC | 1 | 05/21/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 3 | 03/19/2026 |
| METROPOLIS GROUP INC | 3 | 06/20/2025 |
| MBE CODE & ZONING LLC | 2 | 07/07/2022 |
| LLOYD NOEL BUILDING CONSULTANT | 1 | 01/12/2024 |
| Building | Filings | Most Recent |
|---|---|---|
| 71 LAIGHT STREET ↗ | 2 | 03/19/2026 |
| 217 BROADWAY ↗ | 2 | 06/20/2025 |
| 308 EAST 79 STREET ↗ | 5 | 05/21/2025 |
| 55 EAST END AVENUE ↗ | 2 | 08/19/2024 |
| 462 GREENWICH STREET ↗ | 2 | 05/09/2024 |
| 62 WEST 62 STREET ↗ | 1 | 01/12/2024 |
| 176 WAVERLY PLACE ↗ | 1 | 11/09/2022 |
| 176 WAVERLY PLACE ↗ | 1 | 11/09/2022 |
| 30 EAST 30 STREET ↗ | 1 | 04/25/2022 |
| 900 5 AVENUE ↗ | 2 | 04/15/2021 |
| 73 WEST WASHINGTON PLCE ↗ | 1 | 02/18/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 03/31/2026 | Fire-Resistant Penetrations and Joints | 71 LAIGHT STREET | WILLIAM SUK | special |
| 03/31/2026 | Final | 71 LAIGHT STREET | WILLIAM SUK | progress |
| 02/23/2026 | Final | 71 LAIGHT STREET | WILLIAM SUK | progress |
| 02/23/2026 | Fire-Resistant Penetrations and Joints | 71 LAIGHT STREET | WILLIAM SUK | special |
| 06/19/2025 | Final | 217 BROADWAY | WILLIAM SUK | progress |
| 06/19/2025 | Masonry | 217 BROADWAY | WILLIAM SUK | special |
| 04/15/2025 | Masonry | 308 EAST 79 STREET | WILLIAM SUK | special |
| 04/15/2025 | Masonry | 308 EAST 79 STREET | WILLIAM SUK | special |
| 04/15/2025 | Tenant Protection Plan Compliance | 308 EAST 79 STREET | WILLIAM SUK | special |
| 04/15/2025 | Tenant Protection Plan Compliance | 308 EAST 79 STREET | WILLIAM SUK | special |
| 04/15/2025 | Final | 308 EAST 79 STREET | WILLIAM SUK | progress |
| 04/15/2025 | Final | 308 EAST 79 STREET | WILLIAM SUK | progress |
| 02/14/2025 | Fire-Resistant Penetrations and Joints | 73 WEST WASHINGTON PLCE | WILLIAM SUK | special |
| 05/16/2024 | Lighting in dwelling units | 55 EAST END AVENUE | WILLIAM SUK | energy_progress |
| 05/16/2024 | Energy Code Compliance Inspections | 55 EAST END AVENUE | WILLIAM SUK | progress |
| 05/15/2024 | Masonry | 30 EAST 30 STREET | WILLIAM SUK | special |
| 05/15/2024 | Final | 30 EAST 30 STREET | WILLIAM SUK | progress |
| 04/26/2024 | Fire-Resistant Penetrations and Joints | 55 EAST END AVENUE | WILLIAM SUK | special |
| 04/26/2024 | Fire-Resistant Penetrations and Joints | 55 EAST END AVENUE | WILLIAM SUK | special |
| 02/21/2024 | Final | 462 GREENWICH STREET | Donald Friedman | progress |
| 02/21/2024 | Tenant Protection Plan Compliance | 462 GREENWICH STREET | WILLIAM SUK | special |
| 02/21/2024 | Structural Steel - Details | 462 GREENWICH STREET | Matthew Wavro | special |
| 02/21/2024 | Structural Steel - Welding | 462 GREENWICH STREET | Matthew Wavro | special |
| 02/21/2024 | Structural Stability – Alterations of existing buildings | 462 GREENWICH STREET | Matthew Wavro | special |
| 02/15/2024 | Final | 55 EAST END AVENUE | WILLIAM SUK | progress |
| 02/06/2024 | Final | 462 GREENWICH STREET | WILLIAM SUK | progress |
| 02/06/2024 | Tenant Protection Plan Compliance | 462 GREENWICH STREET | WILLIAM SUK | special |
| 02/06/2024 | Masonry | 462 GREENWICH STREET | WILLIAM SUK | special |
| 02/06/2024 | Fire-Resistant Penetrations and Joints | 462 GREENWICH STREET | WILLIAM SUK | special |
| 02/06/2024 | Structural Stability – Alterations of existing buildings | 462 GREENWICH STREET | Matthew Wavro | special |
| 11/30/2023 | Fire-Resistant Penetrations and Joints | 62 WEST 62 STREET | WILLIAM SUK | special |
| 11/30/2023 | Energy Code Compliance Inspections | 62 WEST 62 STREET | WILLIAM SUK | progress |
| 11/30/2023 | Lighting controls | 62 WEST 62 STREET | WILLIAM SUK | energy_progress |
| 11/30/2023 | Interior lighting power | 62 WEST 62 STREET | WILLIAM SUK | energy_progress |
| 11/30/2023 | Lighting in dwelling units | 62 WEST 62 STREET | WILLIAM SUK | energy_progress |
| 11/01/2023 | Final | 62 WEST 62 STREET | WILLIAM SUK | progress |
| 11/09/2022 | Tenant Protection Plan Compliance | 176 WAVERLY PLACE | WILLIAM SUK | special |
| 11/09/2022 | Tenant Protection Plan Compliance | 176 WAVERLY PLACE | WILLIAM SUK | special |
| 03/29/2021 | Fire-Resistant Penetrations and Joints | 900 5 AVENUE | WILLIAM SUK | special |