| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M00244172 ↗ | 48 BOND STREET MANHATTAN | Alteration | Permit Issued | 10/31/2019 | 07/15/2026 | Renovation of existing roof and the addition of plumbing fixtures to this level. |
| S01227316 ↗ | 1801 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 07/10/2025 | 06/24/2026 | Provide labor, materials, and equipment to demolish existing piping and aeration equipment in the Aeration Tanks and Aeration Tank channels … |
| B01168086 ↗ | 761 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 02/03/2025 | 05/28/2026 | FACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00849935 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 05/02/2024 | 04/01/2026 | Removal of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbin… |
| B01378743 ↗ | 10300 FOSTER AVENUE BROOKLYN | Alteration | Filed — no permit on record | 03/27/2026 | — | — |
| M00849947 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 04/22/2024 | 03/05/2026 | Providing exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon ent… |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| M00244172 ↗ | 48 BOND STREET MANHATTAN | Alteration | Permit Issued | 10/31/2019 | 07/15/2026 | Renovation of existing roof and the addition of plumbing fixtures to this level. |
| S01227316 ↗ | 1801 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 07/10/2025 | 06/24/2026 | Provide labor, materials, and equipment to demolish existing piping and aeration equipment in the Aeration Tanks and Aeration Tank channels … |
| B01168086 ↗ | 761 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 02/03/2025 | 05/28/2026 | FACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00849935 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 05/02/2024 | 04/01/2026 | Removal of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbin… |
| B01378743 ↗ | 10300 FOSTER AVENUE BROOKLYN | Alteration | Filed — no permit on record | 03/27/2026 | — | — |
| M00849947 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 04/22/2024 | 03/05/2026 | Providing exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon ent… |
| M00872417 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 05/09/2024 | 03/05/2026 | Filing to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel r… |
| M01033357 ↗ | 219 WEST 77 STREET MANHATTAN | Alteration | Permit Issued | 07/10/2024 | 02/10/2026 | plumbing and sprinkler work associated with the commercial space renovation as shown on plans filed herewith. no change to use, egress or oc… |
| M00244200 ↗ | 48 BOND STREET MANHATTAN | Alteration | Signed-off | 10/31/2019 | 01/23/2026 | Interior renovation to existing garage space. |
| M00244140 ↗ | 48 BOND STREET MANHATTAN | Alteration | Permit Issued | 10/31/2019 | 01/07/2026 | New and relocated plumbing fixtures and sprinklers as noted in plans. |
| M00251690 ↗ | 48 BOND STREET MANHATTAN | Alteration | Permit Issued | 10/31/2019 | 10/03/2025 | MECHANICAL MODIFICATION WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ANY ASSOCIATED … |
| M00251703 ↗ | 48 BOND STREET MANHATTAN | Alteration | Permit Issued | 10/31/2019 | 10/03/2025 | RENOVATION OF INTERIOR AND EXTERIOR SPACE MECHANICAL SYSTEM. |
| M00740043 ↗ | 160 EAST 70 STREET MANHATTAN | Alteration | Permit Issued | 05/31/2022 | 09/24/2025 | STRUCTURAL WORK ASSOCIATED WITH THE REPLACEMENT OF EXISTING FACADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M00835391 ↗ | 479 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/05/2023 | 06/30/2025 | LOCALIZED REPAIR OF EXISTING SIDEWALK VAULT SLAB IN PARALLEL WITH REPLACEMENT OF WATERPROOFING AND ARCHITECTURAL WEARING SLAB. NO CHANGE TO … |
| M01235710 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Filed — no permit on record | 06/24/2025 | — | — |
| Q00769716 ↗ | 159-01 110 AVENUE QUEENS | Alteration | Signed-off | 07/14/2022 | 05/14/2025 | SUBSEQUENT DOCUMENT FOR PL WORK - STORM/DRAINAGE PIPING, DRAINS, DRYWELL RETENTION. |
| M01067165 ↗ | 165 WEST 91 STREET MANHATTAN | Alteration | Signed-off | 08/20/2024 | 01/14/2025 | Plumbing work proposed in existing units #11G/11H on 11th fl. Initial general construction & subsequent mechanical applications to be filed.… |
| M00671490 ↗ | 234 WEST 139 STREET MANHATTAN | Alteration | Signed-off | 02/10/2022 | 11/14/2024 | Mechanical work for a residential building. No change in use, egress, or occupancy. |
| M00251700 ↗ | 48 BOND STREET MANHATTAN | Alteration | Signed-off | 10/31/2019 | 10/24/2024 | Add air conditioning to garage space. |
| M00813810 ↗ | 222 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 01/25/2023 | 07/11/2024 | RECONSTRUCT EXISTING ROOF DECK OVER EXISTING BUILDING-INSTALLED HVAC SHED WITH NEW FRAMING AND FINISHES AS PER PLANS FILED HEREWITH. NO CHAN… |
| S01003485 ↗ | 2636 HYLAN BLVD STATEN ISLAND | Alteration | Signed-off | 03/28/2024 | 07/02/2024 | Non-structural concrete repairs at parking garage roof. No change in egress, use or occupancy. |
| M01010595 ↗ | 143 SPRING STREET MANHATTAN | Alteration | Signed-off | 05/17/2024 | 06/07/2024 | Modifications to the existing structural system as shown on plans. No change in use, egress or occupancy. |
| M08013708 ↗ | 541 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 10/31/2022 | 04/12/2024 | FACADE REPAIRS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00669386 ↗ | 234 WEST 139 STREET MANHATTAN | Alteration | Signed-off | 01/29/2022 | 03/18/2024 | Sprinkler work for a residential building. No change in use, egress, or occupancy. |
| M00965244 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/22/2023 | 02/02/2024 | See comments: PAA filed to remove the plumbing-sprinkler tab from the plumbing Scope of Work section. The # of sprinkler heads on the projec… |
| Q00883911 ↗ | 44-20 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 06/02/2023 | 12/14/2023 | Filing herewith mechanical work for legalization of refrigerator/freezer unit in extg rear OSP space. REMOVE EXTG FREEZER ENCLOSURE & ROOF T… |
| M00489579 ↗ | 160 EAST 70 STREET MANHATTAN | Alteration | Signed-off | 03/24/2021 | 08/30/2023 | Application is filed in conjunction with Facade alteration app#M00740043-I1 to show a demo, including temporary bracing support from CEL to … |
| B08002077 ↗ | 437 BAINBRIDGE STREET BROOKLYN | Alteration | Permit Issued | 11/02/2022 | 07/12/2023 | New Structural work for 2 family dwelling. Installation of new joist. No change of use, egress or occupancy under this application. |
| M00815596 ↗ | 222 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 01/25/2023 | 07/10/2023 | INSTALL FULLY AUTOMATIC, RADIO-CONTROLLED AND WIND-MONITORED, ROLLABLE SUN SHADES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O… |
| M00704052 ↗ | 30 WEST 68 STREET MANHATTAN | Alteration | Permit Issued | 04/20/2022 | 06/30/2023 | FILING FOR FACADE REPAIR AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M00761440 ↗ | 124 EAST 79 STREET MANHATTAN | Alteration | Permit Issued | 10/24/2022 | 06/20/2023 | FILING HEREWITH TO REPLACE THE ROOF. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M08026711 ↗ | 124 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 11/02/2022 | 06/02/2023 | FACADE REPAIRS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00859791 ↗ | 500 BROOME STREET MANHATTAN | Alteration | Signed-off | 05/03/2023 | 05/25/2023 | Interior renovation and fit out of the existing retail store |
| M00772888 ↗ | 40 WEST 35 STREET MANHATTAN | Alteration | Permit Issued | 07/28/2022 | 05/10/2023 | ST WORK ASSOCIATED WITH FACADE FILING. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00865475 ↗ | 138 EAST 50 STREET MANHATTAN | Alteration | Signed-off | 04/28/2023 | 05/09/2023 | general construction work for apartment 15C renovation on 8th floor construction (15th floor marketing) |
| M00796392 ↗ | 109 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 09/20/2022 | 03/23/2023 | FACADE REPAIRS AND ROOF REPAIR. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00489737 ↗ | 234 WEST 139 STREET MANHATTAN | Alteration | Signed-off | 04/22/2021 | 03/20/2023 | STRUCTURAL WORK OF RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00815611 ↗ | 222 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 03/09/2023 | 03/15/2023 | STRUCTURAL FRAMING WORK ASSOCIATED WITH GC APPLICATION TO RECONSTRUCT EXISTING DECK OVER BUILDING INSTALLED NEW FRAMING AND SCREENING AS PER… |
| B00520926 ↗ | 58 NORTH 3 STREET BROOKLYN | Alteration | Permit Issued | 06/01/2021 | 02/22/2023 | STRUCTURAL REINFORCEMENT OF MEZZANINE LEVEL |
| M00815585 ↗ | 222 WEST 14 STREET MANHATTAN | Alteration | Filed — no permit on record | 01/26/2023 | — | — |
| Name | Jobs together | Most recent |
|---|---|---|
| CES ENGINEERING LLC | 7 | 03/03/2026 |
| THREE STUDIO ARCHITECTURE, D.P.C. | 5 | 02/06/2025 |
| ARCHETYPE ARCHITECTURE | 4 | 05/29/2025 |
| UE ARCHITECTURE | 4 | 10/27/2023 |
| EMTG CONSULTANTS INC | 3 | 05/29/2025 |
| TETRA TECH, INC. | 3 | 09/12/2024 |
| SOCOTEC, INC. | 2 | 02/13/2026 |
| ADAM GOLINCZAK ARCHITECTURE P.C. | 1 | 05/21/2024 |
| ARCHITRAVE GROUP PC | 1 | 08/18/2023 |
| AS ENGINEERING SERVICES PC | 1 | 05/04/2023 |
| BRUNSWICK ENGINEERING LLC | 1 | 02/06/2025 |
| DALESSIO ENGINEERING, LLC | 1 | 03/09/2023 |
| DESIMONE CONSULTING ENGINEERS | 1 | 06/04/2025 |
| GREELEY AND HANSEN | 1 | 02/02/2026 |
| HAZEN AND SAWYER | 1 | 09/04/2024 |
| KCE CONSULTING ENGINEERING PLLC | 1 | 06/20/2024 |
| KIRO ENGINEERING LLC | 1 | 09/04/2024 |
| NYC HRA | 1 | 04/09/2026 |
| ROSINI ENGINEERING, PC | 1 | 05/21/2024 |
| SLCE ARCHITECTS | 1 | 04/28/2023 |
| SRW ENGINEERS | 1 | 04/09/2026 |
| THE LIRO GROUP | 1 | 08/12/2024 |
| THORNTON TOMASETTI | 1 | 06/04/2025 |
| TYLin | 1 | 10/31/2022 |
| William J. Frank Engineering, P.C. | 1 | 06/24/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| FOUNDATIONS INTERIOR DESI | 5 | 03/03/2025 |
| OPC MANAGEMENT INC | 5 | 10/27/2023 |
| ROYAL CONCRETE AND MASON* | 5 | 06/04/2025 |
| AMOK INC | 3 | 03/03/2026 |
| ARCO PLBG AND HTG INC | 3 | 03/03/2026 |
| GRAMERCY GROUP, INC | 3 | 09/12/2024 |
| CARA PLUMBING GROUP INC | 2 | 03/03/2026 |
| CASTCAPA CONSTRUCTION LLC | 2 | 03/07/2024 |
| A + SPRINKLER CORP | 1 | 05/21/2024 |
| A PLUS PLUMBING CORP | 1 | 05/21/2024 |
| A. M. PLUMBING COMPANY | 1 | 08/29/2023 |
| A.N.P. PLUMBING LLC | 1 | 08/29/2023 |
| ARISTON CHIMNEY LLC | 1 | 02/06/2025 |
| BERKLEY GENERAL CONTRACTO | 1 | 01/26/2022 |
| DFE CONTRACTOR LLC | 1 | 10/01/2021 |
| DJ PLUS CONSTRUCTION LLC | 1 | 05/03/2023 |
| EBM PLUMBING CORP | 1 | 09/05/2024 |
| EXA USA,CORP | 1 | 05/21/2024 |
| FIVE STAR EURO CONSTRUCTI | 1 | 01/26/2022 |
| FLAIR NYC INC | 1 | 05/29/2025 |
| FORTE EXPRESS P & H INC | 1 | 03/21/2025 |
| G & G MECHANICAL GROUP | 1 | 02/10/2022 |
| HIGHLEVEL GROUP INC | 1 | 05/04/2023 |
| INOR BUILDERS GROUP LLC | 1 | 04/28/2023 |
| J CAIAZZO PLUMBING & HEAT | 1 | 08/18/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| SOUNDVIEW ADVISORS CORP. | 8 | 03/03/2026 |
| NEW YORK CITY DEPT. OF ENVIRONMENTA | 4 | 06/24/2025 |
| AKAM ASSOCIATES, INC. | 2 | 03/07/2024 |
| 42 W 35 HOLDING LLC | 1 | 02/06/2025 |
| 48 Bond LLC | 1 | 03/03/2026 |
| BUCHBINDER & WARREN LLC | 1 | 05/21/2024 |
| CENTERPOINT PROPERTIES | 1 | 04/09/2026 |
| CPTKD Academy, Inc. | 1 | 03/21/2025 |
| Ceruzzi Properties LLC | 1 | 04/28/2023 |
| DGL | 1 | 05/03/2023 |
| NYC Housing Authority | 1 | 09/04/2024 |
| NYCHA | 1 | 11/25/2025 |
| PARK HYATT NEW YORK | 1 | 05/02/2024 |
| TAK hospitality- Andaz fifth avenue | 1 | 06/04/2025 |
| VORNADO REALTY TRUST | 1 | 08/12/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| NYCCODE LLC | 7 | 03/03/2026 |
| A1 EXPEDITING SERVICE CORP. | 4 | 04/09/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 4 | 02/06/2025 |
| NEXUS CONSULTING NYC, INC | 4 | 05/29/2025 |
| EMPIRE CITY CONSULTANTS, INC. | 1 | 08/18/2023 |
| HAZEN & SAWYER, P.C. | 1 | 09/04/2024 |
| ISTAY CONSULTING LLC | 1 | 05/03/2023 |
| JAM CONSULTANTS, INC. | 1 | 04/28/2023 |
| JM ZONING, LLC. | 1 | 05/05/2023 |
| LLOYD NOEL BUILDING CONSULTANT | 1 | 05/04/2023 |
| METROPOLIS GROUP INC | 1 | 06/04/2025 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 10/27/2023 |
| NYC DSS/HRA | 1 | 04/09/2026 |
| RPO INC. | 1 | 06/24/2025 |
| STEVEN DUBNER LANDSCAPING, INC. | 1 | 09/04/2024 |
| WILLIAM VITACCO ASSOCIATES | 1 | 05/21/2024 |
| Building | Filings | Most Recent |
|---|---|---|
| 10300 FOSTER AVENUE ↗ | 5 | 04/09/2026 |
| 48 BOND STREET ↗ | 15 | 03/03/2026 |
| 761 ATLANTIC AVENUE ↗ | 2 | 11/25/2025 |
| 1801 RICHMOND TERRACE ↗ | 1 | 07/10/2025 |
| 417 CANAL STREET ↗ | 6 | 06/24/2025 |
| 479 5 AVENUE ↗ | 2 | 06/04/2025 |
| 219 WEST 77 STREET ↗ | 4 | 03/21/2025 |
| 40 WEST 35 STREET ↗ | 5 | 02/06/2025 |
| 2636 HYLAN BLVD ↗ | 1 | 09/17/2024 |
| 165 WEST 91 STREET ↗ | 1 | 08/20/2024 |
| 250 WEST 34 STREET ↗ | 7 | 08/12/2024 |
| 159-01 110 AVENUE ↗ | 2 | 07/24/2024 |
| 160 EAST 70 STREET ↗ | 4 | 06/20/2024 |
| 143 SPRING STREET ↗ | 1 | 05/21/2024 |
| 109 EAST 42 STREET ↗ | 2 | 05/02/2024 |
| 124 EAST 79 STREET ↗ | 3 | 03/07/2024 |
| 234 WEST 139 STREET ↗ | 7 | 08/29/2023 |
| 44-20 QUEENS BOULEVARD ↗ | 1 | 08/18/2023 |
| 437 BAINBRIDGE STREET ↗ | 2 | 05/04/2023 |
| 500 BROOME STREET ↗ | 1 | 05/03/2023 |
| 138 EAST 50 STREET ↗ | 1 | 04/28/2023 |
| 222 WEST 14 STREET ↗ | 5 | 03/09/2023 |
| 541 LEXINGTON AVENUE ↗ | 1 | 10/31/2022 |
| 30 WEST 68 STREET ↗ | 1 | 05/31/2022 |
| 58 NORTH 3 STREET ↗ | 2 | 10/01/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 03/29/2026 | Maintenance information | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | HVAC-R and service water heating system controls | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | Energy Code Compliance Inspections | 10300 FOSTER AVENUE | Zahid Ismail | progress |
| 03/29/2026 | Post-installed Anchors | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/29/2026 | Fire-Resistant Penetrations and Joints | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/29/2026 | HVAC-R and service water heating system controls | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | Shutoff dampers | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | HVAC-R and service water piping design and insulation | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | Maintenance information | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | Duct leakage testing, insulation and design | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | HVAC-R and service water heating equipment | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | HVAC-R and service water heating equipment | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | Energy Code Compliance Inspections | 10300 FOSTER AVENUE | Zahid Ismail | progress |
| 03/29/2026 | Masonry | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/29/2026 | Fire-Resistant Penetrations and Joints | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/29/2026 | HVAC-R and service water piping design and insulation | 10300 FOSTER AVENUE | Zahid Ismail | energy_progress |
| 03/29/2026 | Concrete - Cast-In-Place | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/29/2026 | Structural Steel - Welding | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/26/2026 | Final | 10300 FOSTER AVENUE | Zahid Ismail | progress |
| 03/26/2026 | Mechanical Systems | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/26/2026 | Structural Steel - Details | 10300 FOSTER AVENUE | Zahid Ismail | special |
| 03/26/2026 | Final | 10300 FOSTER AVENUE | Zahid Ismail | progress |
| 03/20/2026 | Sprinkler Systems | 48 BOND STREET | Zahid Ismail | special |
| 03/20/2026 | Fire-Resistant Penetrations and Joints | 48 BOND STREET | Zahid Ismail | special |
| 12/15/2025 | Fire-Resistant Penetrations and Joints | 48 BOND STREET | Zahid Ismail | special |
| 12/15/2025 | Sprinkler Systems | 48 BOND STREET | Zahid Ismail | special |
| 11/28/2025 | Structural Stability – Alterations of existing buildings | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 11/28/2025 | Post-installed Anchors | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 11/28/2025 | Masonry | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 11/28/2025 | Tenant Protection Plan Compliance | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 11/28/2025 | Final | 761 ATLANTIC AVENUE | Zahid Ismail | progress |
| 11/25/2025 | Final | 761 ATLANTIC AVENUE | Zahid Ismail | progress |
| 11/25/2025 | Tenant Protection Plan Compliance | 761 ATLANTIC AVENUE | — | special |
| 11/25/2025 | Structural Stability – Alterations of existing buildings | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 11/25/2025 | Post-installed Anchors | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 11/25/2025 | Masonry | 761 ATLANTIC AVENUE | Zahid Ismail | special |
| 10/06/2025 | Fire-Resistant Penetrations and Joints | 48 BOND STREET | Zahid Ismail | special |
| 10/06/2025 | Sprinkler Systems | 48 BOND STREET | Zahid Ismail | special |
| 06/03/2025 | Structural Steel - Details | 417 CANAL STREET | Zahid Ismail | special |
| 06/03/2025 | Structural Steel - High Strength Bolting | 417 CANAL STREET | Zahid Ismail | special |
| 06/03/2025 | Structural Steel - Welding | 417 CANAL STREET | Zahid Ismail | special |
| 06/03/2025 | Structural Stability – Alterations of existing buildings | 417 CANAL STREET | Zahid Ismail | special |
| 04/01/2025 | Fire-Resistant Penetrations and Joints | 219 WEST 77 STREET | Zahid Ismail | special |
| 04/01/2025 | Tenant Protection Plan Compliance | 219 WEST 77 STREET | — | special |
| 04/01/2025 | Final | 219 WEST 77 STREET | Zahid Ismail | progress |
| 04/01/2025 | Energy Code Compliance Inspections | 219 WEST 77 STREET | Zahid Ismail | progress |
| 04/01/2025 | Lighting controls | 219 WEST 77 STREET | Zahid Ismail | energy_progress |
| 03/21/2025 | Sprinkler Systems | 48 BOND STREET | Zahid Ismail | special |
| 03/21/2025 | Sprinkler Systems | 48 BOND STREET | Zahid Ismail | special |
| 03/21/2025 | Fire-Resistant Penetrations and Joints | 48 BOND STREET | Zahid Ismail | special |