| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00901222 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 07/25/2023 | 07/26/2023 | Design SALVATOR A. CARADONNA JR. Contractor NATIONAL MAINTENANCE, INC | REMOVE AND REPLACE EXISTING NON-ILLUMINATED JOYBIRD D/F BLADE SIGN. EXISTING ARMATURE TO REMAIN. |
| M00778365 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 08/25/2022 | 08/29/2022 | Design SALVATOR A. CARADONNA JR. Contractor NATIONAL MAINTENANCE, INC | ERECT NON-ILLUMINATED D/F BLADE SIGN. SIGN IS ACCESSORY TO JOYBIRD. |
| M00720068 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 06/30/2022 | 07/21/2022 | Design RETAIL DESIGN COLLABORATIVE Contractor JRM CONSTRUCTION MGMT LLC | PROPOSED INTERIOR GENERAL CONSTRUCTION AT FIRST FLOOR AND ACCESSORY CELLAR COMMERCIAL AREAS FOR RENOVATION TO EXISTING LIGHT MANUFACTURING, … |
| M00720075 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 06/28/2022 | 07/20/2022 | Design DON PENN CONSULTING ENGINEER Contractor A PLUS PLUMBING CORP | PROPOSED PLUMBING WORK AT FIRST FLOOR AND ACCESSORY CELLAR COMMERCIAL AREAS IN CONJUNCTION WITH RENOVATION TO EXISTING LIGHT MANUFACTURING, … |
| M00720117 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 06/28/2022 | 07/20/2022 | Design DON PENN CONSULTING ENGINEER Contractor JRM CONSTRUCTION MGMT LLC | Installation of HVAC heating and cooling system in conjunction with general construction renovations. No change to use egress or occupancy … |
| M00720114 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 06/28/2022 | 07/19/2022 | Design RMJ Contractor JRM CONSTRUCTION MGMT LLC | PROPOSED INTERIOR STRUCTURAL WORK AT FIRST FLOOR INCONJUNCTION WITH GC RENOVATION TO EXISTING LIGHT MANUFACTURING, WAREHOUSE AND SHOWROOM SP… |
| Name | Projects together | Most recent |
|---|---|---|
| Don Penn Consulting Engineering | 2 | 06/28/2022 |
| Salvator A. Caradonna JR | 2 | 07/25/2023 |
| Retail Design Collaborative | 1 | 06/30/2022 |
| RMJ | 1 | 06/28/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| JRM Construction Management | 3 | 06/30/2022 |
| National Maintenance | 2 | 07/25/2023 |
| A Plus Plumbing | 1 | 06/28/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Right Way Services NYC | 4 | 06/30/2022 |
| All in Permit Consultants | 2 | 07/25/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00901222 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 07/25/2023 | 07/26/2023 | Design SALVATOR A. CARADONNA JR. Contractor NATIONAL MAINTENANCE, INC | REMOVE AND REPLACE EXISTING NON-ILLUMINATED JOYBIRD D/F BLADE SIGN. EXISTING ARMATURE TO REMAIN. |
| M00778365 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 08/25/2022 | 08/29/2022 | Design SALVATOR A. CARADONNA JR. Contractor NATIONAL MAINTENANCE, INC | ERECT NON-ILLUMINATED D/F BLADE SIGN. SIGN IS ACCESSORY TO JOYBIRD. |
| M00720068 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 06/30/2022 | 07/21/2022 | Design RETAIL DESIGN COLLABORATIVE Contractor JRM CONSTRUCTION MGMT LLC | PROPOSED INTERIOR GENERAL CONSTRUCTION AT FIRST FLOOR AND ACCESSORY CELLAR COMMERCIAL AREAS FOR RENOVATION TO EXISTING LIGHT MANUFACTURING, … |
| M00720075 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 06/28/2022 | 07/20/2022 | Design DON PENN CONSULTING ENGINEER Contractor A PLUS PLUMBING CORP | PROPOSED PLUMBING WORK AT FIRST FLOOR AND ACCESSORY CELLAR COMMERCIAL AREAS IN CONJUNCTION WITH RENOVATION TO EXISTING LIGHT MANUFACTURING, … |
| M00720117 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 06/28/2022 | 07/20/2022 | Design DON PENN CONSULTING ENGINEER Contractor JRM CONSTRUCTION MGMT LLC | Installation of HVAC heating and cooling system in conjunction with general construction renovations. No change to use egress or occupancy … |
| M00720114 ↗ | 83 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 06/28/2022 | 07/19/2022 | Design RMJ Contractor JRM CONSTRUCTION MGMT LLC | PROPOSED INTERIOR STRUCTURAL WORK AT FIRST FLOOR INCONJUNCTION WITH GC RENOVATION TO EXISTING LIGHT MANUFACTURING, WAREHOUSE AND SHOWROOM SP… |
| Building | Filings | Most Recent |
|---|---|---|
| 83 WOOSTER STREET ↗ | 6 | 07/07/2023 |