Back
Owner
Forty Seventh Fifth Company
Owner · filed under 2 names
17 projects with open permitsMANHATTAN · 61
1 building
112
Total Filings
61
Projects on File
1
Buildings Worked
17
Projects w/ Open Permits
Owner
Primary Trade
Activity
Projects by first filing month61 projects all-time
0246Aug '19 · 2Sep '19 · 1Dec '19 · 2Mar '20 · 1Sep '20 · 1Nov '20 · 2Dec '20 · 1Mar '21 · 2Oct '21 · 3Apr '22 · 1Jun '22 · 1Nov '22 · 3Dec '22 · 1Apr '23 · 2Jun '23 · 1Jul '23 · 2Dec '23 · 1Jan '24 · 4Apr '24 · 1Jun '24 · 1Aug '24 · 1Oct '24 · 3Dec '24 · 2Mar '25 · 2Apr '25 · 2Jun '25 · 1Jul '25 · 1Oct '25 · 2Nov '25 · 2Jan '26 · 1Feb '26 · 1Mar '26 · 5May '26 · 2Jun '26 · 1Jul '26 · 1Sep '26 · 12020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit1728%
Signed off3761%
Filed only711%
By project type
Alteration60
Alteration CO1
Most active buildings
All buildings →
580 5TH AVENUEMANHATTAN · 17 open · latest 10/06/2026
61 projects
Filed under
Forty Seventh Fifth Company57Forty Seventh Fifth Company55
Owner names as filed, grouped with the same alias and corporate-suffix rules as a building's Owner History. Separate owning entities (one LLC per building) stay separate, even under one managing agent.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01256273 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued07/17/202510/06/2026Structural alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans. No proposed change in building us…
M01361582 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued03/18/202610/01/2026PROPOSE TO INSTALL A 3-TON WATER SOURCE HEAT PUMP ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.
M01450374 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record09/10/2026——
M01349710 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued02/18/202608/04/2026proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy
M01425188 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued07/07/202607/28/2026Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
M01418562 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued06/29/202607/20/2026PROPOSED INTERIOR RENOVATION WORK AT SUIE 610, GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, MINOR PLUMBING WORK, AND THE REPLACEMENT OF FINI…
Counts cover all 61 projects (61 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AMA Consulting Engineers803/10/2026
Three Studio Architecture809/30/2026
Katz Architecture511/24/2025
CANY Architecture & Engineering406/18/2026
Jack Green Associates406/22/2023
Gca Consultants305/19/2026
P. M. Architecture304/30/2024
PCS Engineering308/27/2024
Twig Consulting Engineers309/22/2026
A&M Consulting212/06/2022
Brian McDonough, PE204/25/2025
HNY Consulting Engineers208/21/2019
IP Group212/30/2019
M & L Signs210/30/2024
Ware Malcomb203/10/2026
360 Engineering110/07/2025
Andrew Katz Engineers101/14/2025
Ashraf107/19/2023
Christopher Teeter109/22/2026
Cmta111/24/2025
Concept Design Group109/22/2026
DS&F Architect103/03/2026
Factory Engineering Works110/03/2025
Gace109/05/2024
Interface Engineering108/17/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Royal Concrete and Mason1011/13/2026
Core Four Construction509/22/2026
Moreland Construction GR309/22/2026
Vanguard Construction308/17/2026
AMA Design Build203/10/2026
Dependable Mechanical203/10/2026
Enobrac Plumbing207/26/2023
Firequest204/30/2024
KD Renovations209/30/2026
Mgi Designed Interiors206/22/2023
Spire Scaffolding & Hoist210/07/2025
2360 Amsterdam NY104/30/2024
A & E Plumbing103/03/2026
A&A Plumbing112/02/2024
Access Plumbing104/30/2024
Accurate Mechanical109/05/2024
Advanced P, Mechanical & Sprinkler111/18/2021
Advanced P, Mechanical & Sprinkler111/18/2021
Ami and Associates103/03/2026
Aqueduct Mechanical103/27/2023
Aron Contracting106/29/2026
Bedrock Plumbing & Heating101/29/2025
CC Controlled Plumbing106/24/2021
Cobra Kitchen Ventilation103/25/2020
D.A.C. General Contracting111/24/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Clarke Construction Consultants911/13/2026
Katz Architecture & Project Management611/24/2025
Archetype Consultants403/10/2026
Municipal Building Consultants406/18/2026
Top Out Consultants306/22/2023
A&M Engineering Consulting212/06/2022
PCS Engineering210/31/2023
360 Engineering110/07/2025
Build Assist Planning and Consulting108/29/2025
Christopher Teeter, RA109/22/2026
Patuxent Engineering105/28/2024
Platinum Services NY107/19/2023
PM Architecture104/30/2024
Rigging Consultants110/30/2024
61 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 61Open permit 17Signed off 37Filed only 7
Any typeAlteration 60Alteration CO 1
61 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01256273 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued07/17/202510/06/2026Structural alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans. No proposed change in building us…
M01361582 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued03/18/202610/01/2026PROPOSE TO INSTALL A 3-TON WATER SOURCE HEAT PUMP ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.
M01450374 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record09/10/2026——
M01349710 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued02/18/202608/04/2026proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy
M01425188 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued07/07/202607/28/2026Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
M01418562 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued06/29/202607/20/2026PROPOSED INTERIOR RENOVATION WORK AT SUIE 610, GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, MINOR PLUMBING WORK, AND THE REPLACEMENT OF FINI…
M01402086 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record05/19/2026——
M08016077 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued11/16/202205/05/2026SUPPORTED SCAFFOLD ACCESS FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01395876 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record05/01/2026——
M01341661 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued01/26/202604/28/2026STRUCTURAL REPAIRS ON THE 12TH, 14TH, 19TH AND 34TH FL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01338178 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued03/14/202604/27/2026MINOR INTERIOR RENOVATION OF SUITE 1136. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01371490 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/30/202604/15/2026MINOR INTERIOR RENOVATION OF SUITE 711. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01370731 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/16/202604/07/2026SP WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01373975 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/27/202603/30/2026MINOR INTERIOR RENOVATION OF SUITE 909. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01065783 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued06/25/202403/04/2026Roofing replacement above structural deck as per plans filed herewith.
M01315964 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued11/24/202501/25/2026
Design CMTA
RENOVATION OF EXISTING OFFICE SPACE. NEW GYPSUM BOARD AND GLASS PARTITIONS, FINISH/LIGHTING UPGRADES AND NEW DROPPED CEILINGS. NO CHANGE TO …
M01288112 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/03/202501/16/2026INSTALL NEW PEDESTAL FOR FLAG POST ON ROOF OF 34TH FLOOR.
M01298141 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/15/202512/12/2025MINOR INTERIOR RENOVATION OF SUITE 1720. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01305274 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record11/20/2025——
M01092462 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued08/27/202407/23/2025
Contractor M & L SIGNS, INC
Suspended Scaffold for facade restoration as shown on plans
M01189054 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off06/10/202506/25/2025Sprinkler modifications to Suite 403 for proposed tenant improvements as per plans
M01163179 ↗580 5TH AVENUE
MANHATTAN
Alteration COPermit Issued03/08/202506/24/2025Sprinkler alterations on the 14th floor for proposed renovation to existing commercial tenant space; related work as per plans.
M01187868 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/17/202505/01/2025SUPPORTED SCAFFOLD ACCESS FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01193905 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record04/25/2025——
M01213914 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record04/23/2025——
M00981253 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off01/11/202403/04/2025FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M07997660 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off12/06/202202/24/2025PROPOSE TO INSTALL 22 SPRINKLER HEADS (2ND FLOOR SUITE 210) ON AN EXISTING SPRINKLER SYSTEM AS PER PLANS SUBMITTED HEREWITH.
M00757420 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off06/15/202212/30/2024INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01129504 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off12/02/202412/19/2024RENOVATION OF 4TH FLOOR FOR TENANT FIT-OUT, INCLUDING DEMOLITION OF EXISTING PLUMBING AND SPRINKLERS. RECONFIGURATION OF SPRINKLER SYSTEM. N…
M01121793 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off12/02/202412/16/2024RENOVATION TO 4TH FLOOR FOR TENANT FIT-OUT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE TO USE, OCCUPANCY, AND EGRESS.
M01102491 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/11/202410/29/2024REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS AND ASSOCIATED PIPING AND CAPPED BACK TO EXISTING RISERS. SPRINKLER HEADS AND ASSOCIATED BRA…
M01101605 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/16/202410/25/2024REMOVE EXISTING MECHANICAL EQUIPMENT, ASSOCIATED DUCTWORK, REGISTERS, AND CONTROLS. 3 COLD WATER SUPPLY AND RETURN PIPING CAPPED AND VALVED …
M01086519 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/03/202410/21/2024RENOVATION ON 3RD FLOOR FOR TENANT-FIT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00970272 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued12/08/202308/02/2024
Contractor M & L SIGNS, INC
Facade Restoration
M00985619 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off01/15/202407/15/2024INTERIOR RENOVATION ON THE 34TH AND 35TH FL PH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01027366 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off04/30/202406/14/2024PROVIDE SINK ON EXISTING ROUGHING AND RELOCATE EXISTING SPRINKLER HEADS CONNECTED TO EXISTING SPRINKLER RISER FOR 15TH FLOOR OFFICE SPACE. N…
M00861743 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued04/25/202305/31/2024SUSPENDED SCAFFOLD AS SHOWN ON PLANS
M00854935 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off04/06/202305/30/2024INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR …
M00979362 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off01/10/202404/12/2024The design of indoor packaged water source heat pumps with fully ducted distribution, mechanical piping systems and ventilation systems to s…
M00874299 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off06/06/202303/29/2024Structural alterations on the 11th thru 14th floors and roof for the removal and replacement of existing cooling towers; related work as per…
M00987877 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued01/11/202402/06/2024
Contractor M & L SIGNS, INC
FACADE INSPECTION AND MINOR RESTORATION
M00714180 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off04/14/202210/27/2023The installation of a new metal railing on the 33rd floor's terrace.
M00905037 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off07/26/202308/24/2023Sprinkler alterations at the 1st floor; related work as per plans. No proposed change in building use, egress, or occupancy.
M00901556 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued07/31/202307/31/2023SUSPENDED SCAFFOLD AS SHOWN ON PLANS
M00243359 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/25/202006/20/2023Job filed to replace the existing duct work of the existing range hood exhaust system at the rear side of the building (North East Facade), …
M00596796 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/20/202105/25/2023GENERAL CONSTRUCTION RELATED TO 10 FLOOR OFFICE RENOVATION AND PROVIDE NEW DUNNAGE FOR MECHANICAL UNITS INSTALLED UNDER DOB NOW APPLICATION …
M07997592 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off11/23/202201/13/2023PROPOSE TO REPLACE DUCTS, INTAKE FAN, PLENUM, AND LOUVERS TO EXISTING HVAC UNITS ON THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH.
M00793905 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off11/28/202212/28/2022RENOVATION OF EXISTING OFFICE SPACE. NEW GYPSUM BOARD AND GLASS PARTITIONS. REPLACEMENT OF (1) NEW WINDOW. NEW DROPPED CEILINGS. NO CHANGE T…
M00591097 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/22/202102/11/2022PLUMBING AND SPRINKLER MODIFICATIONS RELATED TO OFFICE RENOVATION FILED UNDER DOB NOW APPLICATION #M00589813. NO CHANGE IN USE EGRESS OR OCC…
M00596747 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off10/21/202110/25/2021HEREWITH FILING FOR INSTALLATION OF AC UNITS AND DUCT WORK RELATED TO 10TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00425766 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/26/202106/14/2021PLUMBING AND SPRINKLER WORK FOR OFFICE RENOVATIONS.
M00425617 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off03/26/202104/13/2021MECHANICAL WORK FOR OFFICE RENOVATIONS AS PER PLANS FILED HEREWITH.
M00430997 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off12/03/202001/15/2021MODIFY EXISTING SPRINKLER SYSTEM AS PER PLANS.
M00421767 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off11/04/202001/14/2021
Contractor TECHNOCRAFT INC
PROVIDE NEW EXHAUST FANS FOR BATHROOM AND PANTRY FOR OFFICE RENOVATION IN CONJUCTION TO ALT 2 APPLICATION #140974747, M00421694-I1(SP), M004…
M00421694 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off11/04/202011/13/2020
Contractor FIREQUEST CORP
85 NEW PROPOSED SPRINKLER HEADS TO BE CONNECTED TO EXISTING SPRINKLER RISER FOR A RENOVATED OFFICE SPACE, IN CONJUCTION TO ALT 2 APPLICATION…
M00393863 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off09/24/202009/25/2020INSTALL NEW LP GAS SERVICE, NEW LP GAS LINE, NEW GAS METER, NEW GAS BOOSTER (2) NEW GAS TRAINS. RECONNECT EXISTING HOUSE SERVICE. EXISTING B…
M00282461 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off12/30/201906/29/2020
Design IP GROUP
Mechanical work filed in conjunction with office renovation as per plans filed herewith.
M00282450 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off12/30/201902/03/2020
Design IP GROUP
plumbing and sprinkler work filed in conjunction with office renovation as per plans filed herewith
M00201714 ↗580 5TH AVENUE
MANHATTAN
AlterationPermit Issued08/21/201912/31/2019sprinkler modifications on the 10th floor per plans filed herewith. no changes in use, egress or occupancy.
M00216813 ↗580 5TH AVENUE
MANHATTAN
AlterationSigned-off09/06/201910/09/2019HEREWITH FILING FOR THE INSTALLATION OF 2 NEW CONDENSING UNITS ON THE ROOF AND 14 NEW AIR HANDLING UNITS ON THE 32ND FLOOR. NO CHANGE IN USE…
M00201707 ↗580 5TH AVENUE
MANHATTAN
AlterationFiled — no permit on record08/21/2019——
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
580 5TH AVENUE ↗11211/12/2026
▾Documents — 634 on file (BIS + DOB NOW)
▸Plans & Drawings126
▸DOB NOWPlans/Sketch105
09/15/2026M01450374-I1 · 580 5TH AVENUERequest the plans ↗
09/06/2026M01373975-I1 · 580 5TH AVENUERequest the plans ↗
09/03/2026M00596796-I1 · 580 5TH AVENUERequest the plans ↗
Showing 3 of 105 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00201707-I1 · 580 5TH AVENUERequest the plans ↗
09/05/2026M00282450-I1 · 580 5TH AVENUERequest the plans ↗
09/04/2026M00393863-I1 · 580 5TH AVENUERequest the plans ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00216813-P1 · 580 5TH AVENUERequest the plans ↗
09/05/2026M00216813-I1 · 580 5TH AVENUERequest the plans ↗
09/05/2026M00243359-I1 · 580 5TH AVENUERequest the plans ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/05/2026M00201714-I1 · 580 5TH AVENUERequest the plans ↗
09/05/2026M00282450-I1 · 580 5TH AVENUERequest the plans ↗
09/04/2026M00421694-I1 · 580 5TH AVENUERequest the plans ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications387
▸DOB NOWProgress Inspector Seal & Signature152
10/19/2026M01086519-P1 · 580 5TH AVENUEOpen ↗
10/19/2026M01086519-P1 · 580 5TH AVENUEOpen ↗
10/19/2026M01086519-P1 · 580 5TH AVENUEOpen ↗
Showing 3 of 152 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature123
11/15/2026M01341661-P1 · 580 5TH AVENUEOpen ↗
10/05/2026M01338178-P1 · 580 5TH AVENUEOpen ↗
09/27/2026M01361582-S4 · 580 5TH AVENUEOpen ↗
Showing 3 of 123 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature112
10/19/2026M01086519-P1 · 580 5TH AVENUEOpen ↗
10/12/2026M00861743-P2 · 580 5TH AVENUEOpen ↗
10/05/2026M01338178-P1 · 580 5TH AVENUEOpen ↗
Showing 3 of 112 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos105
▸DOB NOWDEP ACP-5: Asbestos Assessment Report98
11/15/2026M01341661-P1 · 580 5TH AVENUEOpen ↗
10/05/2026M01338178-P1 · 580 5TH AVENUEOpen ↗
09/27/2026M01361582-S2 · 580 5TH AVENUEOpen ↗
Showing 3 of 98 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/25/2026M01121793-I1 · 580 5TH AVENUEOpen ↗
08/13/2026M01129504-I1 · 580 5TH AVENUEOpen ↗
Showing 2 of 7 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00596796-I1 · 580 5TH AVENUEOpen ↗
08/13/2026M00425617-I1 · 580 5TH AVENUEOpen ↗
Showing 2 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents10
▸DOB NOWManufacturer's Specifications3
08/28/2026M00970272-I1 · 580 5TH AVENUEOpen ↗
08/13/2026M00970272-P1 · 580 5TH AVENUEOpen ↗
08/13/2026M01092462-I1 · 580 5TH AVENUEOpen ↗
▸DOB NOWCalculations3
08/28/2026M00970272-I1 · 580 5TH AVENUEOpen ↗
08/13/2026M00970272-P1 · 580 5TH AVENUEOpen ↗
08/13/2026M01092462-I1 · 580 5TH AVENUEOpen ↗
▸DOB NOWIRA Certification2
08/13/2026M00987877-P1 · 580 5TH AVENUEOpen ↗
08/13/2026M00987877-I1 · 580 5TH AVENUEOpen ↗
▸DOB NOWWaiver Document2
10/05/2026M01338178-P1 · 580 5TH AVENUEOpen ↗
08/18/2026M01338178-I1 · 580 5TH AVENUEOpen ↗