| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S08044259 ↗ | 415 PROSPECT AVENUE STATEN ISLAND | Alteration CO | Permit Issued | 12/02/2022 | 04/05/2023 | Design THINK DESIGN ARCHITECTURE Contractor CAPITAL CONTR P&H CORP | APPLICATION IS FILED FOR THE INTERIOR ALTERATION TO AN EXISTING 2 STORY FAMILY RESIDENCE TO CONVERT THE EXISTING 1 CAR GARAGE AND BREEZEWAY … |
| S00306484 ↗ | 2361 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 03/17/2020 | 08/24/2021 | Design LEON SKVIRSKY PE Contractor R.G.M. SIGNS INC Filer BUILDING BROTHERS INC. | INSTALL ILLUMINATED SIGN ON WALL (STEPHEN SILVER TUNNEL TO TOWERS FOUNDATION) |
| S00467488 ↗ | 2361 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 02/11/2021 | 06/11/2021 | Design GEORGE SIGALOS P.E. Contractor CAPITAL CONTR P&H CORP | INSTALLATION OF MINIATURE ELECTRIC STEAM BOILER FOR PROCESS APPLICATION ONLY. |
| S00468003 ↗ | 2361 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 02/11/2021 | 05/26/2021 | Design GEORGE SIGALOS P.E. Contractor CAPITAL CONTR P&H CORP | INSTALLATION OF WATER PIPING TO BOILER FILED UNDER S00467488 |
| Name | Projects together | Most recent |
|---|---|---|
| George Sigalos P.E. | 2 | 06/30/2021 |
| Leon Skvirsky PE | 1 | 03/17/2020 |
| Think Design Architecture | 1 | 04/19/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Capital Contracting P&H | 3 | 04/19/2023 |
| Island Strong Constrc | 1 | 04/19/2023 |
| R.G.M. Signs | 1 | 03/17/2020 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S08044259 ↗ | 415 PROSPECT AVENUE STATEN ISLAND | Alteration CO | Permit Issued | 12/02/2022 | 04/05/2023 | Design THINK DESIGN ARCHITECTURE Contractor CAPITAL CONTR P&H CORP | APPLICATION IS FILED FOR THE INTERIOR ALTERATION TO AN EXISTING 2 STORY FAMILY RESIDENCE TO CONVERT THE EXISTING 1 CAR GARAGE AND BREEZEWAY … |
| S00306484 ↗ | 2361 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 03/17/2020 | 08/24/2021 | Design LEON SKVIRSKY PE Contractor R.G.M. SIGNS INC Filer BUILDING BROTHERS INC. | INSTALL ILLUMINATED SIGN ON WALL (STEPHEN SILVER TUNNEL TO TOWERS FOUNDATION) |
| S00467488 ↗ | 2361 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 02/11/2021 | 06/11/2021 | Design GEORGE SIGALOS P.E. Contractor CAPITAL CONTR P&H CORP | INSTALLATION OF MINIATURE ELECTRIC STEAM BOILER FOR PROCESS APPLICATION ONLY. |
| S00468003 ↗ | 2361 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 02/11/2021 | 05/26/2021 | Design GEORGE SIGALOS P.E. Contractor CAPITAL CONTR P&H CORP | INSTALLATION OF WATER PIPING TO BOILER FILED UNDER S00467488 |
| Building | Filings | Most Recent |
|---|---|---|
| 415 PROSPECT AVENUE ↗ | 2 | 04/19/2023 |
| 2361 HYLAN BOULEVARD ↗ | 3 | 06/30/2021 |