Back
Owner
Wesley Methodist Church of Ghana
Owner
BROOKLYN · 5
1 building
6
Total Filings
5
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Owner
Primary Trade
Activity
Projects by first filing month5 projects all-time
0123Mar '21 · 2Apr '21 · 1Mar '22 · 1May '24 · 1202220232024
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off5100%
By project type
Alteration5
Most active buildings
All buildings →
1729 FLATBUSH AVENUEBROOKLYN · latest 06/21/2024
5 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B010436491729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off05/11/202406/21/2024Proposed demolition work for existing sprinkler system. As per plan. no change of use, egress and occupancy.
B004416381729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off03/21/202107/26/2022Propose to install a new 10 ton rooftop AC unit including supply and return ductwork, new toilet exhaust fan including controls filed in con…
B004417261729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off04/05/202106/16/2022Propose structural scope of work filed in conjunction with Alt 1 # 321599481. Propose to add 4 steel posts and 4 steel beams ; reinforce som…
B006919101729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off03/16/202204/15/2022Propose temporary construction fence in conjunction with Alt 1 # 321599481.
B004417151729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off03/21/202112/07/2021Propose to install new plumbing fixtures and new storm drain connect to existing sanitary and storm system filed in conjunction withAlt1 # 3…
Counts cover all 5 projects (5 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Bayside Engineering205/11/2024
Piro Studio203/16/2022
M C Structural Engineering104/05/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Siteline Construction303/16/2022
Best Plumbing & HVAC205/11/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BMB Building Consulting103/16/2022
5 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 5Signed off 5
5 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B010436491729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off05/11/202406/21/2024Proposed demolition work for existing sprinkler system. As per plan. no change of use, egress and occupancy.
B004416381729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off03/21/202107/26/2022Propose to install a new 10 ton rooftop AC unit including supply and return ductwork, new toilet exhaust fan including controls filed in con…
B004417261729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off04/05/202106/16/2022Propose structural scope of work filed in conjunction with Alt 1 # 321599481. Propose to add 4 steel posts and 4 steel beams ; reinforce som…
B006919101729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off03/16/202204/15/2022Propose temporary construction fence in conjunction with Alt 1 # 321599481.
B004417151729 FLATBUSH AVENUE
BROOKLYN
AlterationSigned-off03/21/202112/07/2021Propose to install new plumbing fixtures and new storm drain connect to existing sanitary and storm system filed in conjunction withAlt1 # 3…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
1729 FLATBUSH AVENUE ↗604/30/2024
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch2
▸DOB NOWPlans/Sketch - Plumbing2
▸DOB NOWPlans/Sketch - Structural1
▸DOB NOWPlans/Sketch - Mechanical Systems1
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026B00441726-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/28/2026B00441715-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/28/2026B00441715-I1 · 1729 FLATBUSH AVENUEOpen ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01043649-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00441715-P1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00441715-I1 · 1729 FLATBUSH AVENUEOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B00441726-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/29/2026B00441726-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/27/2026B01043649-I1 · 1729 FLATBUSH AVENUEOpen ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B01043649-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00441638-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00441715-I1 · 1729 FLATBUSH AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00441638-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00441715-I1 · 1729 FLATBUSH AVENUEOpen ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026B01043649-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00691910-I1 · 1729 FLATBUSH AVENUEOpen ↗
08/13/2026B00441638-I1 · 1729 FLATBUSH AVENUEOpen ↗
Showing 3 of 6 on file for this type