| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01244867 ↗ | 408 EAST 92 STREET MANHATTAN | Alteration | Signed-off | 09/02/2025 | 08/13/2026 | Design H2M ARCHITECTS AND ENGINEERS Owner SGVL Management Contractor ALLIED CONSTRUCTION MANAG | Remove beverage station and cut back cold water supply piping to location of new beverage station. Provide new cold water connection to beve… |
| Person | Filings | Most recent |
|---|---|---|
| Lenka Ilic | 5 | 05/28/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| H2M ARCHITECTS AND ENGINEERS | 1 | 06/12/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| ALLIED CONSTRUCTION MANAG | 1 | 06/12/2026 |
| FORTE EXPRESS P & H INC | 1 | 06/12/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| SGVL Management | 1 | 06/12/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01244867 ↗ | 408 EAST 92 STREET MANHATTAN | Alteration | Signed-off | 09/02/2025 | 08/13/2026 | Design H2M ARCHITECTS AND ENGINEERS Owner SGVL Management Contractor ALLIED CONSTRUCTION MANAG | Remove beverage station and cut back cold water supply piping to location of new beverage station. Provide new cold water connection to beve… |
| Building | Filings | Most Recent |
|---|---|---|
| 408 EAST 92 STREET ↗ | 5 | 05/28/2026 |